![]() |
|
|
![]() |
forums map | news magazine | posting guidelines |
|
Global Announcement |
As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy. |
![]() |
|
Thread Tools |
![]() |
#101 |
Registered User
Join Date: Feb 2008
Posts: 1,515
Likes (Received): 984
|
![]()
__________________
IF YOU BUILD IT, THEY WILL COME |
![]() |
![]() |
Sponsored Links | |||
Advertisement |
|
![]() |
#102 |
Registered User
Join Date: Jan 2019
Posts: 249
Likes (Received): 194
|
Yes, and there's actually a big chance that the people behind Prime would get away with it this time because they can always say that they only submitted an unsolicited proposal and that the government agreed to it. Plus, it's clear na malakas kapit nila sa current administration.
But, they definitely have an ulterior motive on this one. This would still be good for the economy and mass transit of course, but mas utilitarian lang siguro ung parallel alignment ng MMSP Phase 2 and original LRT 6. |
![]() |
![]() |
![]() |
#103 |
Registered User
Join Date: Oct 2017
Posts: 222
Likes (Received): 101
|
Sempre sila gagastos di pwedeng wala silang pakinabang di biro ang magpatayo ng lrt lines.
|
![]() |
![]() |
Sponsored Links | |||
Advertisement |
|
![]() |
#104 | |
Registered User
Join Date: Mar 2011
Posts: 3,087
Likes (Received): 2992
|
Quote:
Kung pede lang pagkasyahin yung LRT 6 train sa MMSP extension mas okay para tracks lang din gagamitin ni Line 6. |
|
![]() |
![]() |
![]() |
#105 | |
Registered User
Join Date: Jan 2019
Posts: 249
Likes (Received): 194
|
Quote:
![]() 2. Where in the world? madami. I'll let you use google. I'm sure you can find lots of examples. Besides, bakit mo pa ko pinaghahanap sa ibang bansa, eh andito na nga ung mga proposals. Talk about being counterproductive. 3. Multiple lines in a single road should not be a problem if they are "interconnected", right? ![]() So by using the same logic that you used, it should not be a problem if LRT Line 1 and 6 are separate lines (at least sila hindi redundant). 3. If i may add more talak, pwede naman talaga pagkasyahin, never said hindi. Parang hindi nga lang utilitarian ung kalalabasan, kawawa mga taga Imus and Dasmarinas sa Aguinaldo Highway side if ever. 4. Also, just because something is being done in other countries does not mean we should copy it here, kaya nga we have our own feasibility studies. |
|
![]() |
![]() |
![]() |
#106 |
Registered User
Join Date: Mar 2011
Posts: 3,087
Likes (Received): 2992
|
Tignan mo yung ruta ng Line 1 at yung original line 6. Parang gusto mo mangyari na magtransfer ka pa sa Line 6 para makarating sa paroroonan mo which is not efficient kung same lang din yung highway na dadaanan. Dapat yan suburban railway na ang pagtransferan mo sa Niog station. Dont compare ang kalsada sa railroad.
Sabog sabog na ang MRT/LRT system map sa Metro Manila tapos hahaluan mo pa ng dinugtong na another Line sa Line 1 kung pede naman iextend ang line 1. Dapat ang design ng metro sa metro manila ay from north to south at west to east na isang haba na isang sakay ka lang from end to end hindi yung dinugtong lang sa dulo yung susunod na line. Boy_turista? Last edited by jp1032; February 26th, 2019 at 02:34 PM. |
![]() |
![]() |
![]() |
#107 | |
Registered User
Join Date: Oct 2012
Location: Quezon City
Posts: 118
Likes (Received): 77
|
Quote:
1. Tuloy ba ang line 1 extension hanggang Dasma? 2. Yung line 1 extension ba dadaan ng Aguinaldo Highway or Imus at least? 3. So tatlong tren ang plano itayo sa south ng metro manila aabot hanggang dasma, LRT 1 ext, Subway, LRT 6? Kung may planong idaan ang extension ng LRT1 sa imus at sa mga matataong lugar ng Cavite, walang dahilan para i-turn down ng NEDA ang unsolicited proposal na LRT6. Batay lang naman dun sa mapa ng lrt6 at subway, parang magkalapit naman yata ang ruta nila. Wala bang map na naka lay out yung tatlo LRT1, Subway at LRT6 para mapagkumpara lang sana. Sabi mo walang problema kung may redundancy ang lrt6 at subway, paano mo nasabi? |
|
![]() |
![]() |
![]() |
#108 |
Registered User
Join Date: Jan 2019
Posts: 249
Likes (Received): 194
|
![]() We're talking about railroad alignment sa roads. That's different from actually talking about roads (which I did not do). I just said that if you're saying na dalawang rail line sa isang road alignment ay pwede basta interconnected kahit magkatabi, edi ibig sabihin mas pwede ung LRT Line 1 connecting to LRT Line 6 kasi kahit papano mas efficient (despite the fact you'd need to transfer) kasi hindi redundant. San ka ba naman nakakita dalawang rail lines along (Molino Paliparan) dahil sa unsolicited proposal ng Prime na LRT 6 plus ung nakaabang na MMSP Phase 2, tapos biglang sa kabila along Aguinaldo highway wala ng railway (considering mas densely populated dun at mas maraming commercial areas dun) Super old topic na actually ung LRT 1 LRT 6 transfer issue. Kahit pangit, parang tanggap ko na na mgging separate rail line tlaga sila (in the absence of drastic changes of course), pero "interconnected" naman ung "rail" (not road) so ok na din diba. Tinanggap ko na kasi sa JICA studies at Long Term Development Reports ng NEDA parang nakaprogram na na LRT 1 + LRT 6 talaga e. Pwede naman talaga LRT 1 extend up to Governor's Drive. But un nga, parang mas sabog na imbis na parallel lang "muna" ung rail lines para iservice ung Imus and Dasma via LRT 6 and MMSP Phase 2, kailangan mo pa iextend ung LRT1 kasi dinoble na sa kabila. Ayoko din naman ng LRT 1 + 6, mas maganda LRT 1 na lang, para mas comportable sa byahe pag nakasakay sa train. Pero I doubt lang talaga na extend nila LRT 1 hangang governor's drive para lang magkaroon ng Dalawang railway sa eastern Dasma and laguna areas. You can of course disagree with me, but that's ok. P.S. I'm not boy_turista, and I know who he is. Just disappoints me that you would resort to think that I'm actually boy turista just because we disagree on certain points. "smh" Last edited by jedmosley; February 26th, 2019 at 02:53 PM. |
![]() |
![]() |
![]() |
#109 |
Registered User
Join Date: Mar 2011
Posts: 3,087
Likes (Received): 2992
|
^ unsolicited proposal lang kasi yan syempre idadaan nila sa properties nung proponent. Wala naman problema doon kasi magfifinance nung railway construction except sa ROW pero dapat rail+property ang consortium na hindi iaasa yung chunk ng revenue sa pamasahe. Maganda dito kung iintegrate din ang Metro Bus ni Villar.
|
![]() |
![]() |
![]() |
#110 | ||
Registered User
Join Date: Oct 2012
Location: Quezon City
Posts: 118
Likes (Received): 77
|
Quote:
Siguro naman open ang aguinaldo highway sa unsolicited proposal in case walang plano ang gobyerno na pondohan ang further extension ng lrt 1. Again di mo pwede pilitin ang proponent ng LRT6 na ipadaan niya sa aguinaldo kung gusto niya doon sa kabila. Pero there is nothing in the construction of LRT6 that will stop anybody from building LRT1 via aguinaldo. Kung walang nagpo-propose, it's not LRT6's fault. Ok sana kung pondohan na lang ng gobyerno para madali matapos. Matagal tagal pa ang subway.
__________________
|
||
![]() |
![]() |
![]() |
#111 | |
Registered User
Join Date: Jan 2019
Posts: 249
Likes (Received): 194
|
Quote:
Pero the more rail lines the merrier nga basta matapos nila. Lahat naman tayo magbebenefit dyan. |
|
![]() |
![]() |
![]() |
#112 |
Registered User
Join Date: Jan 2009
Posts: 667
Likes (Received): 134
|
Ah ito pala ang LRT6 Cavite line forum.. any news if LRT6 will have ARCA south Taguig common Station? Bali Taguig - Alabang - All Cavite towns - Baclaran?
Pwede din sa NAIA na mag meet ang JICA Subway at LRT6 Cavite line? May PNR station sa FTI Arca south right or Sa Starmall Alabang pa ang PNR station? Pwede din dun ang Common train station papuntang Laguna and far south and to sea ports? Any news if Metro Pacific Investments is interested with this LRT Cavite project? Malaysian Investors? Cavite and nearby Laguna are booming with township and housing projects. Magkakaproblem sa transport kung wala pang Subway, MRT and LRT. Cavite Line is feasible. Sana mag push before the year 2019 ends.
__________________
Experience is a good school, but the fees are high. Last edited by firebender; February 28th, 2019 at 02:17 AM. |
![]() |
![]() |
![]() |
#113 |
Registered User
Join Date: May 2007
Posts: 20,711
Likes (Received): 10783
|
Well kung makuha to ni Sipag at Toyaga / Misis Hanepbuhay eh sana lang magkaroon ng magandang interconnection points sa existing at future rail lines.
Expected na talagang gatas to na dumaan sa developments nila ala C5 extension.
__________________
"Honestly, I have identified the enemy who dumped us into this quagmire we are in. I have met the enemy face to face. And sadly, the enemy is us. We are our own tormentors." PRRD, #SONA2019 |
![]() |
![]() |
![]() |
#114 | |
Registered User
Join Date: Jan 2009
Posts: 667
Likes (Received): 134
|
I really dont trust any politicians nowadays pero mas okay kung MPIC Ayala na lang or maybe JICA ulit.
Kailangan ng maumpisahan ang Cavite Line.
__________________
Experience is a good school, but the fees are high.
|
|
![]() |
![]() |
![]() |
#115 | ||
Finding destiny
Join Date: Oct 2005
Posts: 8,795
Likes (Received): 2943
|
Quote:
![]()
__________________
|
||
![]() |
![]() |
![]() |
#116 |
Registered User
Join Date: Oct 2017
Posts: 222
Likes (Received): 101
|
Delays uli yan kung lrmc pa din..
|
![]() |
![]() |
![]() |
#117 |
Registered User
Join Date: Feb 2018
Posts: 22
Likes (Received): 15
|
https://ppp.gov.ph/ppp_projects/lrt-6-cavite-line-a/
Implementing Agency Department of Transporation (DOTr) Project Description The project involves the construction, operation and maintenance of an approximately 23.5 km. Light Rail Transit System, consisting of nine (9) stations that will extend the LRT-1 Extension Project from Niog in Bacoor to Governor’s Drive in Dasmarinas traversing Bacoor, Imus and Dasmarinas Cities, all in the Province of Cavite. Indicative Cost Php 56.27 Billion Procurement Mode Unsolicited PPP Structure BOT Region REGION IV-A - CALABARZON Sector Transportation,Rail Status On-going evaluation of ICC-Technical Board |
![]() |
![]() |
Sponsored Links | |||
Advertisement |
|
![]() |
Thread Tools | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
LRMC-LRT1 Cavite Extension | Length: 11.7 km| 8 Stations | caracat06 | Railways | 1463 | Today 05:16 AM |
BRAZIL | Urban Transport Compilation | mopc | Subways and Urban Transport | 2251 | Yesterday 06:09 AM |
JICA-Metro Manila Subway | Length: 36 km| 15 Stations | jpdm | Railways | 3416 | December 10th, 2019 08:07 AM |
Cebu LRT | Length: 21 kms | 16 Stations | advisionem | Railways | 669 | October 19th, 2019 04:55 AM |
ALEXANDRIA | Alexandria Regional Metro | Line 1 | Abuqir-Kilo 21 | 43km (Phase 1-3) | 33 stations | Proposed | egypt69 | Transport & Infrastructure Projects | المشاريع التحتية و النقل | 17 | November 4th, 2014 12:45 PM |