Old June 11th, 2019, 06:02 AM   #381
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 2,964
Likes (Received): 2847

Quote:
Originally Posted by fretburner View Post
There are many idiots in government, but there are a lot of good people there as well.

It's crazy to say the do not know what a real interchange is.

Remember the case of LRT1-MRT3? The back and forth of the location be it near SM North or Trinoma? Remember how they scaled it down dramatically?

It's because of congressmen and senators quarrelling about location and design cost. They want the interchange to benefit those who fund their campaigns and they scream about the cost of a good, world-class interchange because they don't want to spend money if it's not their pet project. If it's their pet project, they would overprice it 2x or 3x over to maximize their kickbacks.

Look at that QC Councilor now, wanting to stop the subway because he doesn't like the alignment!
Yung culture at perception ng tao sa Gobyerno ang problema. Kala kasi ng mga tao na kapag gumastos ng malaki ang Gobyerno sa proyekto, may corruption agad na mangyayari. Tingin kasi ng karamihan ay isang "CHARITY" ang Gobyerno na kung saan dapat iprovide lahat ng pangangailangan ng mamamayan kagaya ng kung ano anong libre at doleouts. Kaya kapag may binalitang gumastos ang Gobyerno ng malaki para sa longterm goals, sasabihin ng mga makikitid ang isip na dapat tinulong na lang daw sa MAHIHIRAP yan. Kaya yung ibang mga nag-aral pa sa ibang bansa para tumulong sa Gobyerno, wala rin nagawa kundi magmigrate sa ibang bansa after ng matapos nila yung return service. I know some na kumuha pa ng graduate degrees sa Japan tapos bumalik dito tapos after makapagserve ng 1 or 2 years, diretso Singapore na.

Syempre etong mga officials at employees, umiiwas lang din makasuhan kaya nagkakaroon ng mga projects na mumurahin at substandard sa huli.

Regarding sa pricing ng mga Government projects, naging kalakaran na yan. Actually ako mismo nakita ko kung paano presyuhan ang isang item kapag Government project ang laki ng difference sa quotation price kapag private projects.
jp1032 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old June 21st, 2019, 01:44 PM   #382
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 2,964
Likes (Received): 2847



Koreans versus Japanese consortiums
jp1032 no está en línea   Reply With Quote
Old June 21st, 2019, 05:16 PM   #383
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1096

May mali ata Megawide Construction Corporation
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old June 21st, 2019, 05:32 PM   #384
Sky_Higher
Soonsoo
 
Sky_Higher's Avatar
 
Join Date: Oct 2013
Location: Kyusi
Posts: 1,923
Likes (Received): 1178

Quote:
Originally Posted by Transporter89 View Post
May mali ata Megawide Construction Corporation
Tama yung Megaworld Construction Company. IIRC, sila yung contractor ng expansion ng Phil. Children's Medical Ctr.
Sky_Higher no está en línea   Reply With Quote
Old June 22nd, 2019, 10:04 AM   #385
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1096


Pano mo nasabi? Wala naman company, corporation lang hehe
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old September 21st, 2019, 09:54 AM   #386
silaster
Registered User
 
Join Date: Aug 2009
Posts: 310
Likes (Received): 129

Nag start naba clearing from Alabang to Los Banos?
silaster no está en línea   Reply With Quote
Old September 21st, 2019, 09:59 AM   #387
dipdown
Registered User
 
Join Date: Apr 2018
Location: Metro Manila
Posts: 720
Likes (Received): 463

hindi ba hanggang calamba na lang? https://www.thinglink.com/scene/1205361385932849157
__________________
Manila: The best city on Earth [citation needed]
dipdown no está en línea   Reply With Quote
Old September 21st, 2019, 11:01 AM   #388
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 1,401
Likes (Received): 76

Solved na ba yung magiging location ng Sucat station?
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old October 9th, 2019, 02:20 PM   #389
LhexiMont
Working and Succeeding
 
Join Date: Jul 2005
Location: Muntinlupa NCR & Province of Cavite
Posts: 6,050
Likes (Received): 1255

Wp
LhexiMont no está en línea   Reply With Quote
Old October 9th, 2019, 02:24 PM   #390
LhexiMont
Working and Succeeding
 
Join Date: Jul 2005
Location: Muntinlupa NCR & Province of Cavite
Posts: 6,050
Likes (Received): 1255

News item about PNR South Commuter Railway as per link.

http://https://business.inquirer.net/280522/adb-to-lend-2-6b-for-ph-rail-project?utm_term=Autofeed&utm_medium=Social&utm_source=Facebook#Echobox=1570394247
__________________

wheel of steel, MegaPotato liked this post
LhexiMont no está en línea   Reply With Quote
Old October 9th, 2019, 03:37 PM   #391
wheel of steel
Registered User
 
wheel of steel's Avatar
 
Join Date: Jul 2007
Posts: 7,504
Likes (Received): 985

This advance procurement late this year will open the pandoras box on how exactly NSCR, Existing Narrow Gauge PNR, MRAIl ang PNR South Long Haul will run with respect to each other. We will also determine with the NSCR DED, the exact location of PNR South Long Haul Sucat Terminal.
__________________

AirRail781 liked this post
wheel of steel no está en línea   Reply With Quote
Old October 10th, 2019, 01:27 AM   #392
AirRail781
Registered User
 
Join Date: Mar 2019
Posts: 80
Likes (Received): 36

Quote:
Originally Posted by wheel of steel View Post
the exact location of PNR South Long Haul Sucat Terminal.
IIRC Sucat Terminal will be located at the defunct Sucat Powerplant. Unless there's been a change of plans
AirRail781 no está en línea   Reply With Quote
Old October 10th, 2019, 01:46 AM   #393
Englehart
Air, Road, Rail and Sea
 
Englehart's Avatar
 
Join Date: Jun 2009
Location: Manila
Posts: 3,161
Likes (Received): 593

eh demolished na sucat saktong ready na sya if constructions commenced
__________________
You can be Called a Certified Coupler Hunter
you must first undergo a Below The Job Training

AirRail781 liked this post
Englehart no está en línea   Reply With Quote
Old October 10th, 2019, 10:41 AM   #394
happosai
<<-Pusit Hunter->>
 
happosai's Avatar
 
Join Date: Feb 2009
Location: Al Khobar
Posts: 6,437
Likes (Received): 833

Quote:
Originally Posted by Englehart View Post
eh demolished na sucat saktong ready na sya if constructions commenced
Gagawing SM yan.. SM City Powerplant...
happosai no está en línea   Reply With Quote
Old October 10th, 2019, 02:39 PM   #395
LhexiMont
Working and Succeeding
 
Join Date: Jul 2005
Location: Muntinlupa NCR & Province of Cavite
Posts: 6,050
Likes (Received): 1255

Actually sa harapan ng former Sucat power plant along East Service Road ay may SM Hypermarket na with a big lot including its frontage open parking. Originally, the lot was the Makro Sucat prior to becoming an SM Hypermarket. Rumor has it that an SMDC residential and mall project will be built there as another tenant of the building (HMR) had already gone leaving the property entirely to SM.
LhexiMont no está en línea   Reply With Quote
Old October 15th, 2019, 03:15 PM   #396
fretburner
Registered User
 
Join Date: Jun 2016
Posts: 2,532
Likes (Received): 2335

Quote:
Originally Posted by jp1032 View Post
Regarding sa pricing ng mga Government projects, naging kalakaran na yan. Actually ako mismo nakita ko kung paano presyuhan ang isang item kapag Government project ang laki ng difference sa quotation price kapag private projects.
Yes. Doble minimum. Kasi nga, kasama na yung lagay sa budget.

I don't know if that changed na because of Digong, pero ganyan talaga sila mag budget ng project.
fretburner no está en línea   Reply With Quote
Old October 15th, 2019, 04:24 PM   #397
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 2,964
Likes (Received): 2847

Quote:
Originally Posted by fretburner View Post
Yes. Doble minimum. Kasi nga, kasama na yung lagay sa budget.

I don't know if that changed na because of Digong, pero ganyan talaga sila mag budget ng project.
Kaya din malaki yung presyuhan sa bawat government project dahil sa expected delay lalo na kapag bago pa lang yung ipapabid kagaya ng isang government building or establishment. Yung mga end user kasi sa Gobyerno nangangapa talaga during project implementation. Bilang lang yung masasabing magagaling maghandle ng projects na kapag nagsuggest or nagraise ka ng concerns, alam yung gagawin.

Reg sa Topic, mukhang tinaga ng husto sa consultation fees ang NSCR doon bumawi mga Hapon kasi ang magfifinance na ng civil works ay ADB na.
jp1032 no está en línea   Reply With Quote
Old October 16th, 2019, 08:59 AM   #398
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 1,401
Likes (Received): 76

Question: kasali ba sa additional station ang Bucal station na nilobby ng LGU ng Calamba at madaragdagan ba ang cost sa loan budgeted ng ADB at Jica?
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old October 17th, 2019, 03:03 AM   #399
wheel of steel
Registered User
 
wheel of steel's Avatar
 
Join Date: Jul 2007
Posts: 7,504
Likes (Received): 985

Quote:
Originally Posted by krrra View Post
Question: kasali ba sa additional station ang Bucal station na nilobby ng LGU ng Calamba at madaragdagan ba ang cost sa loan budgeted ng ADB at Jica?
Ok.. There was a press conf. sometime around that Bucal Station was requested actually by DOTr to provide an interchange station to PNR South Long Haul. What came into my mind thisbis the last station of NSCR South and it is a grade station levelled with PNR Long Haul Bucal Station. I will post the source as soon as I find it.
__________________

INVEST IN THE PHILIPPINES


AirRail781 liked this post
wheel of steel no está en línea   Reply With Quote
Old Yesterday, 03:44 AM   #400
engnatividad
Registered User
 
Join Date: Apr 2019
Posts: 27
Likes (Received): 60

ADB to fund Manila-Calamba railway in 2020

Quote:
The Asian Development Bank (ADB) said it will be funding another railway line for the Philippines next year, following the biggest loan it has ever granted for a local infrastructure project.

The regional lender said it is looking to lend $2.5 billion (about ₱128.7 billion) to the Philippines in 2020, matching this year's level. Some $1.2 billion (about ₱61.8 billion) will be set aside for the South Commuter Railway Project, which will link Tutuban in Manila to Calamba, Laguna. The South Commuter train line is said to be worth ₱344.6 billion, and is under the watch of the Department of Transportation.

This is a segment of the entire North-South Commuter Railway (NSCR) system, which is also funded through official development assistance from the Japan International Cooperation Agency. The national government has also set aside a parallel budget of ₱84.7 billion for the NSCR next year, which is about a tenth of the ₱777.55-billion project cost.

Once completed, the entire NSCR will have 36 stations linking Clark International Airport and the New Clark City to Bulacan, Manila, all the way to Laguna.
https://www.cnnphilippines.com/news/...VFz9k_WU8kpZ9E
__________________

FlashNeutrinos liked this post
engnatividad no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:26 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us