Old August 8th, 2015, 06:44 PM   #1
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

LRTA-LRT2+East & West Extension | Length: 13.8km+5km|11+5 Stations



Quote:


MRT 2 - PURPLE LINE

The Megatren, more popularly known by its generic name Line 2, is a 13.8km mass transit line that traverses five cities in Metro Manila namely Pasig, Marikina, Quezon City, San Juan and Manila) along the major thoroughfares of Marcos Highway, Aurora Boulevard, Ramon Magsaysay Boulevard, Legarda and Recto Avenue.

CONSTRUCTION
The Megatren system was built at a cost of P31 billion in soft loans mainly from the Japan Bank for International Cooperation (JBIC). This is a very concessional loan, with 2 percent interest for three packages, and payable for 30 years with a 10-year grace period.

The Asia Europe MRT Consortium, led by the Marubeni Corporation, has delivered 18 new four (4) - car trains. Each train is 92.6 meters long and consists of four motorized cars. One train can seat 232 passengers. It can accommodate 1,396 more standing passengers along its spacious coaches. Compared with the previous light rail projects, LRT 2 was more difficult to build because of highly technical problems. Several international companies participated in the project, which consists of four (4) contract packages. Package 1 is the depot in Santolan, Pasig where the 18 trains are stabled, and where the employees? quarters, and offices are based. Package 2 consists of the substructures, mainly the railway?s foundations including the columns and pilings that support the guideways. Package 3 forms the superstructure composed of the girders, or beams that support the train rails, the viaduct, and the train stations. Package 4 includes the electro-mechanical systems, the rolling stocks, the track works, including the network of cables and poles that transmit power to the trains.

A special method called the pre-casting segmental method (PSM), was used in building the viaduct or the long stretch of suspension bridges resting on the concrete towers. The method is of European technology and is widely used worldwide. In the Philippines, the Megatren Line 2 project pioneered the use of the PSM technology or the pre-casting of the girders into smaller segments so that each span connected between two columns is weighing not more than 58 tons.

OPERATION
The Megatren is the latest of its kind in the world today. It is a fully automatic (i.e., driver-less) system which is at par in terms of facilities and technology with those in other parts of the world. It is equipped with a CCTV system that enables the railway operator to monitor activities of passengers and employees at the stations and inside the trains. Moreover, the LRT 2 is commuter friendly and has facilities especially designed for the elderly and the differently-abled. It has Braille tactiles along the lanes and elevators which enable blind passengers to be guided on their way to the trains. The coaches are also more spacious than those of the earlier systems. These enable passengers with disabilities and those onboard wheelchairs to be able to board and alight from Megatren without any problem. Elevators are installed in the stations also for the use of the elderly and disabled passengers.

Another key feature of the Megatren is its automatic vending machines which enable the passengers to buy their tickets without queuing at the ticket booths. This allows for faster mobility of people and added convenience to commuters.

SERVICE ROUTE
Line 2 has a total length of about 13.8km and when fully operational, will run from Santolan, Pasig City to Recto in Manila. As of date, however, Phase 1 of the line has started operating from its Santolan Station in Pasig, heading in a northwest direction towards Katipunan, and finally, in a southwesterly direction along Aurora Boulevard, to Cubao.
Read More

EXTENSIONS

Quote:
East Extension
A 4-kilometer (2.5 mi) east extension or the "Masinag Extension" from Santolan, Pasig to Masinag, Antipolo, Rizal, was proposed. The proposal entails the construction of two additional stations, one in Cainta near Emerald Avenue; and another in the Masinag junction of Antipolo. It was approved in September 2012 by the National Economic and Development Authority (NEDA).[16]

DMCI will be facilitized the consulting of the project, while the groundbreaking of the project was held last June 9, 2015. The construction of two new stations will costs 2.27 billion pesos and it will be end by mid-2017.

West Extension
A 3.02-kilometer (1.88 mi) west extension of LRT-2 to the Manila North Harbor in Tondo, Manila was proposed. It was approved by the National Economic and Development Authority (NEDA) last 19 May 2015. The construction of this said extension would create three stations, one in Tutuban near the Tutuban PNR Station, one in Divisoria close to San Nicolas, and its terminus would be near the North Port Passenger Terminal in Manila North Harbor's Pier 4.
Source: Wikipedia
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.

j01, [email protected], GilBuAdA liked this post
Transporter89 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old August 8th, 2015, 06:46 PM   #2
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

DMCI construction arm snags contract to build LRT2 extension
By: Darwin G. Amojelar, InterAksyon.com
January 27, 2015 1:12 PM

Quote:
MANILA - D.M. Consunji Inc. has bagged a contract to extend the LRT2 eastward to Masinag in Cainta, Rizal.

In a statement, the Department of Transportation and Communications (DOTC) said DMCI offered P2.27 billion to build a 3.9-kilometer elevated guideway for the LRT2 East Extension from the railway’s end-station at Santolan in Pasig City.
InterAksyon.com means BUSINESS
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old August 8th, 2015, 06:49 PM   #3
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

LRT2 East, West extension projects to be completed in 2019

Chrisee Dela Paz
Published 9:12 PM, June 10, 2015
Updated 12:30 PM, Jun 11, 2015

Quote:

MASINAG EXTENSION. Officials of the LRT Authority and executives of DMCI Holdings Incorporated start the construction of LRT2 East Extension. All photos by Chrisee Dela Paz/Rappler


MANILA, Philippines – By 2019, the Light Rail Transit Line 2 (LRT2) will run from Masinag in Antipolo City all the way to Pier 4 area in Manila City, catering to more than 315,000 passengers daily.

Currently, the youngest of the 3 main elevated railways in Metro Manila has a design capacity of 240,000 passengers daily and only runs from Santolan, Pasig City, to Recto, Manila.

Rappler
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old August 8th, 2015, 07:09 PM   #4
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

Groundbreaking

Quote:
Originally Posted by hakz2007 View Post
@jacquemanabat

Quote:
Originally Posted by hakz2007 View Post
@gerarddelapena




__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old August 8th, 2015, 07:14 PM   #5
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

1st update @Masinag

Quote:
Originally Posted by jameskirk O View Post




Finally!!! LRT 2 Extention is now on preparation stage....

Aug 7.
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.

Ekweng liked this post
Transporter89 no está en línea   Reply With Quote
Old August 9th, 2015, 05:36 AM   #6
[email protected]
Philippine Forum Mod
 
queetz@home's Avatar
 
Join Date: Jun 2004
Location: Ortigas (Pasig City)
Posts: 5,746
Likes (Received): 5218

Mods, please do not lock or delete this thread. This is a better way to keep track of the specific LRT2 project. Plus this will ensure relevant info on the LRT2 remain easily accessible and not be buried from the bajillion posts from the main thread.

That said, I suggest that posts here should be relevant to the LRT2 extensions only, including articles, photos, political commentaries relating only to LRT2, and so on. All other topics regarding the other MRT or LRT lines, as well as general political commentaries on Metro Manila rail rapid transit, should be on the main Metro Manila Mass Rapid Transit System thread.
__________________
SAVE LRT2

"The best solution all over the world, time tested, safe, no pollution, is still the use of the train system." - Ms. Elvira Medina, Nat'l Center for Commuter Safety and Protection

Last edited by [email protected]; August 9th, 2015 at 05:45 AM.
queetz@home no está en línea   Reply With Quote
Old August 9th, 2015, 06:32 AM   #7
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097


Orayt! 1st comment by Queetz

Welcome
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old August 9th, 2015, 06:34 AM   #8
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097

Updates updates sa MRT2 East Extension?
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old August 9th, 2015, 07:31 AM   #9
transjico
BANNED
 
Join Date: May 2013
Posts: 559
Likes (Received): 223

Quote:
Originally Posted by [email protected] View Post
Mods, please do not lock or delete this thread. This is a better way to keep track of the specific MRT2 project. Plus this will ensure relevant info on the MRT2 remain easily accessible and not be buried from the bajillion posts from the main thread.

That said, I suggest that posts here should be relevant to the MRT2 extensions only, including articles, photos, political commentaries relating only to MRT2, and so on. All other topics regarding the other MRT or LRT lines, as well as general political commentaries on Metro Manila rail rapid transit, should be on the main Metro Manila Mass Rapid Transit System thread.
I agree to this, especially we expect further updates to both MRT-2 east and west extensions in the coming days, weeks, and months.
transjico no está en línea   Reply With Quote
Old August 9th, 2015, 01:13 PM   #10
boy.turista
BANNED
 
Join Date: Jun 2013
Location: BANNED
Posts: 748
Likes (Received): 866

Phase 2 of the LRT-2 line will be extended from Masinag all the way to Antipolo City. I'll post the plan later.
boy.turista no está en línea   Reply With Quote
Old August 9th, 2015, 01:36 PM   #11
boy.turista
BANNED
 
Join Date: Jun 2013
Location: BANNED
Posts: 748
Likes (Received): 866

Transport Department kicks off westbound extension of LRT2

MANILA – The government has kicked off the westbound extension of the LRT2.

In a statement, the Department of Transportation and Communications (DOTC) said it is bidding out the P200-million contract to undertake the engineering design for the LRT2 extension to the Port Area in Manila.

"After recently breaking ground for the LRT2 East Extension, we are now moving to likewise extend the railway up to the Port Area to serve more riders,” Transport Secretary Joseph Emilio Abaya said.

The National Economic and Development Authority (NEDA) Board last May approved the P10.12-billion LRT2 West Extension Project, which involves extending the line from its current endpoint along Recto Avenue all the way to Pier 4.

The extension will add 3.02 kilometers and three stations to the existing line. Construction is expected to be completed in three-and-a-half years.

Bidders have until next month to submit their offers, with the project set to be awarded in the fourth quarter.

The detailed engineering design, which will take around four to six months to complete, will lay down the construction plan.

DOTC and state-run Light Rail Transit Authority (LRTA) last week broke ground for the LRT2 East Extension, which will add 4.2 kilometers to the existing line, bringing it to Masinag in Antipolo City. The project is slated for completion in the third quarter of 2017.

Besides extending the LRT2, DOTC is also bidding out the operations and maintenance (O&M) contract. Four bidders have pre-qualified, namely Aboitiz Equity Ventures, Inc. and SMRT Transport Solution Consortium; DMCI and Tokyo Metro Co., Ltd Consortium; Light Rail Manila Holdings 2, Inc. Consortium; and San Miguel Holdings Corporation and Korea Railroad Corporation Consortium.
__________________

lianlaspinas liked this post
boy.turista no está en línea   Reply With Quote
Old August 10th, 2015, 04:25 AM   #12
C.L.A.R.K.
Registered User
 
Join Date: Jul 2015
Location: Quezon City
Posts: 177
Likes (Received): 21

Hope the design of the extensions will be like the original project. Pumapangit kasi pag kanya kanyang gawa.
__________________
Zero regrets. No bitterness.
C.L.A.R.K. no está en línea   Reply With Quote
Old August 10th, 2015, 04:29 AM   #13
C.L.A.R.K.
Registered User
 
Join Date: Jul 2015
Location: Quezon City
Posts: 177
Likes (Received): 21

OPERATION
The Megatren is the latest of its kind in the world today. It is a fully automatic (i.e., driver-less) system which is at par in terms of facilities and technology with those in other parts of the world. It is equipped with a CCTV system that enables the railway operator to monitor activities of passengers and employees at the stations and inside the trains. Moreover, the LRT 2 is commuter friendly and has facilities especially designed for the elderly and the differently-abled. It has Braille tactiles along the lanes and elevators which enable blind passengers to be guided on their way to the trains. The coaches are also more spacious than those of the earlier systems. These enable passengers with disabilities and those onboard wheelchairs to be able to board and alight from Megatren without any problem. Elevators are installed in the stations also for the use of the elderly and disabled passengers.

Another key feature of the Megatren is its automatic vending machines which enable the passengers to buy their tickets without queuing at the ticket booths. This allows for faster mobility of people and added convenience to commuters. - If only the other train systems could be this way
__________________
Zero regrets. No bitterness.
C.L.A.R.K. no está en línea   Reply With Quote
Old August 10th, 2015, 04:42 AM   #14
Englehart
Air, Road, Rail and Sea
 
Englehart's Avatar
 
Join Date: Jun 2009
Location: Manila
Posts: 3,166
Likes (Received): 596

-deleted-
__________________
You can be Called a Certified Coupler Hunter
you must first undergo a Below The Job Training
Englehart no está en línea   Reply With Quote
Old August 11th, 2015, 12:47 AM   #15
evilgenius15
transpoguy
 
evilgenius15's Avatar
 
Join Date: Aug 2008
Posts: 1,507
Likes (Received): 230

mukhang aashto ata ang east extension, huwag naman sana
__________________
evilgenius15
Life is no Nintendo game.
evilgenius15 no está en línea   Reply With Quote
Old August 11th, 2015, 02:40 AM   #16
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097


Wala ka na magagawa talagang matipid ang gobyerno. Ang struktura ng viaduct at estasyon ay kaparehas sa Line 1 North Extension. Tsk tsk buset!
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Old August 11th, 2015, 06:05 AM   #17
romyman
Registered User
 
Join Date: Mar 2015
Location: Riyadh
Posts: 1,165
Likes (Received): 563

LRT2 Extension Map - Thanks to Philstar

Quote:
Originally Posted by boy.turista View Post
Phase 2 of the LRT-2 line will be extended from Masinag all the way to Antipolo City. I'll post the plan later.

http://media.philstar.com/images/the...line-LRT-2.PNG
romyman no está en línea   Reply With Quote
Old August 11th, 2015, 06:50 AM   #18
boy.turista
BANNED
 
Join Date: Jun 2013
Location: BANNED
Posts: 748
Likes (Received): 866

Quote:
Originally Posted by romyman View Post


hanggang Masinag lang yan. Ang phase 2 nyan ay to extend Masinag station to Antipolo City proper. Next admin na to.
boy.turista no está en línea   Reply With Quote
Old August 11th, 2015, 06:54 AM   #19
edly
Planner
 
Join Date: Aug 2008
Location: Pasig
Posts: 2,150
Likes (Received): 678

Quote:
Originally Posted by evilgenius15 View Post
mukhang aashto ata ang east extension, huwag naman sana
Yes, it's AASHTO, not box girder type. The plan was posted here several pages back.
__________________
Keep the IRON HORSE and the National Economy Moving! Support LRT and MRT extensions and make our metropolis more livable!
10 Years in SSC and counting!
edly no está en línea   Reply With Quote
Old August 11th, 2015, 07:04 AM   #20
Transporter89
Infrastructures/Cities
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 3,578
Likes (Received): 1097


Pati rin sa West AASHTO. Baka dmci mananalo
__________________

Bulabugin natin ang gobyerno! Huwag tayong titigil hangga't hindi ito bumibili ng karagdagang tren at kumukuha ng magagaling at matitinong railway managers. Dikdikin natin ang gobyerno para diinan din nito ang mga negosyanteng nanlalamang sa kontrata at serbisyo.
Transporter89 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
BRAZIL | Urban Transport Compilation mopc Subways and Urban Transport 2206 October 19th, 2019 02:34 AM
New York City - Supertall List | Manhattan Thread Directory Hudson11 Manhattan 31 September 18th, 2019 07:22 PM
FORUM INDEX - Newcastle Forum ALPHABETICAL SUBJECT INDEX to factual posts on this forum Newcastle Historian Newcastle Metro Area 79 March 13th, 2012 09:29 AM
WEBSITES LISTING - A comprehensive list of LINKS to Local/Newcastle Area Websites Newcastle Historian Newcastle Metro Area 21 June 29th, 2010 03:04 PM
DEVELOPMENT SUMMARY - Newcastle Metro Area Forum: Projects Listing newcastlepubs Newcastle Metro Area 0 February 7th, 2010 06:32 PM


All times are GMT +2. The time now is 06:34 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us