Old January 2nd, 2016, 05:21 AM   #21
absinthe_888
Registered User
 
absinthe_888's Avatar
 
Join Date: May 2007
Posts: 20,129
Likes (Received): 10262

OT: Pro-railways si Du30, heard it personally sa DZMM nung interview sa kanya ni Davila at Vic.

Si Mar pro-railways din naman diba - pro sa pagsira, pag bukol, at pag giba.
__________________

lianlaspinas liked this post
absinthe_888 está en línea ahora   Reply With Quote
Sponsored Links
Advertisement
 
Old January 4th, 2016, 02:08 AM   #22
kaelthas18
=**=
 
kaelthas18's Avatar
 
Join Date: Apr 2007
Location: Manila and Cauayan City,Isabela
Posts: 1,484
Likes (Received): 1713

Quote:
Originally Posted by absinthe_888 View Post
OT: Pro-railways si Du30, heard it personally sa DZMM nung interview sa kanya ni Davila at Vic.

Si Mar pro-railways din naman diba - pro sa pagsira, pag bukol, at pag giba.
If i remember mar's interview. His more on to BRT rather that rail lines. Useless candidate si mar.
__________________

metrosuburban, Bosnyboy liked this post
kaelthas18 no está en línea   Reply With Quote
Old January 4th, 2016, 02:56 AM   #23
kaelthas18
=**=
 
kaelthas18's Avatar
 
Join Date: Apr 2007
Location: Manila and Cauayan City,Isabela
Posts: 1,484
Likes (Received): 1713





I wonder why this was prioritized first even though lrt1 south extension (up to Niog) has not yet started. Mrt7,mrt 4 and northrail should also be prioritized . Is it because abaya is from cavite?
__________________
Invest in Cauayan City, Isabela
City in the Central Part of Region 2
Founded 1740
kaelthas18 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old January 4th, 2016, 01:00 PM   #24
happosai
<<-Pusit Hunter->>
 
happosai's Avatar
 
Join Date: Feb 2009
Location: Al Khobar
Posts: 6,437
Likes (Received): 833

Baka naman PR lang yan?
happosai no está en línea   Reply With Quote
Old January 4th, 2016, 03:18 PM   #25
ArkiLurker
Registered User
 
ArkiLurker's Avatar
 
Join Date: Aug 2007
Posts: 390
Likes (Received): 118

ibang klase talaga gubyerno ni a noy.ni isang poste nga ng lrt south extension wala pang naitayo tapos may lrt line 6 na?

eleksyon 2016 pa more
ArkiLurker no está en línea   Reply With Quote
Old January 5th, 2016, 04:00 AM   #26
walrus357
Registered User
 
walrus357's Avatar
 
Join Date: Oct 2006
Posts: 1,886
Likes (Received): 2481

Quote:
Originally Posted by walrus357 View Post
Conglomerates eye LRT-6 PPP project
By: Miguel R. Camus
Philippine Daily Inquirer
02:19 AM January 4th, 2016

FILIPINO conglomerates and a Malaysian infrastructure group
are among those eyeing the Aquino administration’s next big-
ticket public-private partnership deal, the proposed P65.1-billion
Light Rail Transit Line 6 (LRT-6) in Cavite province.

Company officials from Ayala Corp., San Miguel Corp., Metro
Pacific Investments Corp., and Malaysia’s MTD Group
expressed their interest to pre-qualify for the project, which
will be connected to another major railway, the LRT-1 that
serves Metro Manila.

Read more
******
walrus357 no está en línea   Reply With Quote
Old January 5th, 2016, 04:04 PM   #27
edly
Planner
 
Join Date: Aug 2008
Location: Pasig
Posts: 2,149
Likes (Received): 677

Yung may mai-publish lang silang Bid Invitation sa mga newspapers... malaking "accomplishment" na yun ng PNoy Admin.
__________________
Keep the IRON HORSE and the National Economy Moving! Support LRT and MRT extensions and make our metropolis more livable!
10 Years in SSC and counting!

metrosuburban liked this post
edly no está en línea   Reply With Quote
Old January 6th, 2016, 04:36 PM   #28
RajkoToromen
Registered User
 
Join Date: Feb 2012
Location: STGO/QC/MKNA
Posts: 4,447
Likes (Received): 6126

Quote:
Originally Posted by edly View Post
Yung may mai-publish lang silang Bid Invitation sa mga newspapers... malaking "accomplishment" na yun ng PNoy Admin.


Aping api naman sa inyo ang mga DILAW, meron naman silang Railway accomplishment, yung LRT 3 extension, from Santolan to Masinag, inuumpisahan na naglalagay na ng mga poste sa Marcos Highway sa Antipolo bossing.

Yun lang hindi na sila ang aabutang mag ri-ribbon cutting, baka si Digong na kung susuwertihin at kung mamalasin aakuin pa ni Binay yan credit to him once sya ang manalo.
__________________
Beta Sigma de Santiago Para Siempre - BSS!

Lifestyle Capital of Region 2

La Ciudad de Santiago, Filipinas
___________________________________
"Kung ayaw mong masaktan mag chess ka na lang!" -Robert Salazar Jaworski Sr.
RajkoToromen no está en línea   Reply With Quote
Old January 7th, 2016, 08:05 AM   #29
watcher09
One Of A Kind!
 
watcher09's Avatar
 
Join Date: Aug 2009
Location: My City
Posts: 2,670
Likes (Received): 711

They should have proposed this up to Tagaytay, IMO.
watcher09 no está en línea   Reply With Quote
Old January 10th, 2016, 09:36 AM   #30
Planning Democracy
Registered User
 
Planning Democracy's Avatar
 
Join Date: Dec 2008
Location: Muntinlupa City
Posts: 1,440
Likes (Received): 199

Oh wow, ang haba na, this would really benefit those people who have transferred to Cavite and have to suffer through all that horrendous EDSA like traffic in Cavite.
Planning Democracy no está en línea   Reply With Quote
Old January 11th, 2016, 03:04 AM   #31
edly
Planner
 
Join Date: Aug 2008
Location: Pasig
Posts: 2,149
Likes (Received): 677

IMO Urban rails are more effective if these are extended from center all the way to suburbs. In the case of LRT South, Cavite's built up areas have extended all the way to Tagaytay, so having an LRT extension there is still justifiable.
__________________
Keep the IRON HORSE and the National Economy Moving! Support LRT and MRT extensions and make our metropolis more livable!
10 Years in SSC and counting!

lianlaspinas liked this post
edly no está en línea   Reply With Quote
Old January 14th, 2016, 10:19 AM   #32
davidwebb
Registered User
 
Join Date: Oct 2004
Location: Ortigas Center / Angono, Rizal
Posts: 144
Likes (Received): 81

http://ppp.gov.ph/wp-content/uploads...3-Dec-2015.pdf

3.1 Technical Information

3.1.1 Stations and Alignment

Project involves construction of seven (7) stations south of Bacoor including a passenger interchange station in Niyog to allow passengers to transfer between LRT Line 6 and LRT Line 1. Stations are planned in the following locations: (i) Niyog, (ii) Tirona, (iii) Imus Transport Terminal, (iv) Daang Hari, (v) Salitran, (vi) Congressional Avenue, and (vii) Governor’s Drive. Provision has been made for an additional future station, Patindig Araw, to be located between Imus and Daang Hari.

3.1.2 ROW
As noted earlier, most of the 19-kilometer alignment is within the ROW of Aguinaldo Highway. The center line of the highway has been chosen for the rail tracks to avoid risks from power transmission lines and ensure safety to the riders. No land acquisition will be required except for some very small potential acquisition at station locations (to be determined at preliminary design stage).

3.1.3 Track
LRT Line 6 will be an elevated standard gauge, direct fixation (non-ballasted) track system. Track into and within the depot (including workshops) will be a mix of direct fixation and ballasted track. The LRT Line 6 guideway structure will support the rolling stock, guide it through the alignment and restrain stray vehicles. Guidance of the rolling stock includes the ability to switch vehicles between guideways and support emergency evacuation.

3.1.4 Rolling Stock
The rolling stock shall be articulated EMUs formed into four (4)-car trainsets. The trainsets will be powered by an overhead contact system with a nominal voltage of 750 VDC. Both ends of each trainset shall have a driving cab, separated from the passenger riding compartments but accessible through a lockable door. Each passenger car will have to be equipped with at least eight (8) bi-parting sliding plug doors, (4) four per car side. Trainsets will be designed to permit the movement of passengers between cars.

3.1.5 Signaling and Control System
The signaling and control system for the extension must be compatible with that of the existing line and any additions or modification made as part of the LRT1 CAVEX project. The system must include full ATP functionality and will be designed for the following operating requirements:
► minimum design headway of 90 seconds, inclusive of a maximum station dwell of 30 to 40 seconds; and
► maximum authorized speed will be 60 kph.

3.1.6 AFCS
LRT Line 6 will have the same AFCS which is currently being implemented in LRT Lines 1 and 2 and MRT-3. The Concessionaire will have to accede to the AFCS Concession Contract.

3.1.8 Project Interface with LRT Line 1 Extension

For the duration of the LRT1 CAVEX concession, the operations of the LRT1 CAVEX and LRT Line 6 systems will be separate. Both lines will have their own independent stations at Niyog, joined by a short passageway to permit passenger transfer. However, the conceptual design of the LRT Line 6 system includes a “pocket track” which could in the future be connected to the south end of the LRT1 CAVEX track. Until that point, the pocket track can be used for stabling of trains at Niyog.
davidwebb no está en línea   Reply With Quote
Old March 5th, 2016, 02:51 AM   #33
ajosh821
#TeamFairview
 
ajosh821's Avatar
 
Join Date: Apr 2012
Location: Metro Manila
Posts: 6,994
Likes (Received): 9324

Prequalification for LRT-6 bids moved to May 12

By Louella Desiderio (The Philippine Star) | Updated March 5, 2016 - 12:00am

Quote:
MANILA, Philippines - The Department of Transportation and Communications (DOTC) has moved the submission of prequalification documents for the P65.09 billion Light Rail Transit (LRT) Line 6 project to May 12 following requests for extension by interested bidders.

The indicative timeline issued by the DOTC in December last year showed March 4, as the initial date for the submission of the prequalification documents for the project.
__________________
“Politics is the art of looking for trouble, finding it everywhere, diagnosing it incorrectly and applying the wrong remedies.” ― Groucho Marx

lianlaspinas liked this post
ajosh821 no está en línea   Reply With Quote
Old March 5th, 2016, 03:26 AM   #34
absinthe_888
Registered User
 
absinthe_888's Avatar
 
Join Date: May 2007
Posts: 20,129
Likes (Received): 10262

And the next headline:

LRT-6 bids up to the next Admin
absinthe_888 está en línea ahora   Reply With Quote
Old March 5th, 2016, 08:14 AM   #35
baybum7
Registered User
 
baybum7's Avatar
 
Join Date: May 2015
Location: Makati
Posts: 707
Likes (Received): 609

Quote:
Originally Posted by kaelthas18 View Post




I wonder why this was prioritized first even though lrt1 south extension (up to Niog) has not yet started. Mrt7,mrt 4 and northrail should also be prioritized . Is it because abaya is from cavite?
LRT-1 South Extension is projected to start on June or July this year.

Considering the lengthy and inefficient bidding process, baka tapos nang magawa ang South Extension pagka issue ng Notice of Award ng LRT-6.
baybum7 no está en línea   Reply With Quote
Old March 6th, 2016, 03:25 PM   #36
kaboomerangle
urban roamer
 
Join Date: Mar 2009
Posts: 119
Likes (Received): 95

Bakit nakalock ang Line 1 South Extension thread samantalang malabo pa rin naman ang mga detalye sa ngayon ng Line 6 pero di ito ni-lock?

Either i-lock ang thread na ito or i-unlock ang Line 1 South Extension.

Just my two cents.
__________________
The Urban Roamer

lianlaspinas liked this post
kaboomerangle no está en línea   Reply With Quote
Old March 8th, 2016, 07:23 AM   #37
michael.asuncion18
Registered User
 
Join Date: Oct 2009
Posts: 1,082
Likes (Received): 612



Bakit yung mga railway infrastructure even the highway...part by part kung iimplement...diba mas makakatipid at malaki maitutulong kung yung LRT1 Extension southward (Niyog) then may LRT6 (Dasmarinas) eh ituloy na hanggang Tagaytay City...well malaking tulong ito yun nga lang FUNDING ang sasabihin na problema na naman or on the other hand the ROW acquisition...well sana hindi lang ito PR but a reality sooner time!
michael.asuncion18 no está en línea   Reply With Quote
Old March 9th, 2016, 09:42 AM   #38
tim7
tim
 
tim7's Avatar
 
Join Date: Mar 2012
Location: pasay paranaque entertaiment city
Posts: 909
Likes (Received): 177

Buti naman nagkaroon ng provisional station sa sa patindig araw, imus
Mahaba kasi yun pagitan from imus to daang hari
__________________

lianlaspinas liked this post
tim7 no está en línea   Reply With Quote
Old March 9th, 2016, 11:11 PM   #39
calaguyo
F.L.I.P.
 
calaguyo's Avatar
 
Join Date: Nov 2008
Location: Southwest
Posts: 1,265
Likes (Received): 593

Quote:
Originally Posted by absinthe_888 View Post
And the next headline:

LRT-6 bids up to the next Admin
Kaya nga parang teleserye...

ITUTULOY...


And Daang Matuwid!
calaguyo no está en línea   Reply With Quote
Old March 10th, 2016, 05:03 PM   #40
j01
Registered User
 
Join Date: Nov 2008
Posts: 2,817
Likes (Received): 2058

Quote:
Originally Posted by kaelthas18 View Post
If i remember mar's interview. His more on to BRT rather that rail lines. Useless candidate si mar.
Out of touch with the reality si Mar.

Sa laki ng populasyon ng Metro Manila,
kailangan sampung buses
ang sabay-sabay na dumating sa BRT station.

Therefore, parang tren din.
Hahaha.
__________________

[email protected], Bosnyboy liked this post
j01 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
JICA-Metro Manila Subway | Length: 36 km| 15 Stations jpdm Railways 3331 Today 07:04 AM
Cebu LRT | Length: 21 kms | 16 Stations advisionem Railways 669 Today 03:55 AM
BRAZIL | Urban Transport Compilation mopc Subways and Urban Transport 2206 Today 02:34 AM
LRMC-LRT1 Cavite Extension | Length: 11.7 km| 8 Stations caracat06 Railways 1403 Yesterday 09:50 AM
ALEXANDRIA | Alexandria Regional Metro | Line 1 | Abuqir-Kilo 21 | 43km (Phase 1-3) | 33 stations | Proposed egypt69 Transport & Infrastructure Projects | المشاريع التحتية و النقل 17 November 4th, 2014 11:45 AM


All times are GMT +2. The time now is 07:47 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us