Old September 14th, 2019, 04:01 PM   #481
Rajesh SM
Registered User
 
Join Date: Jun 2006
Location: Trivandrum
Posts: 3,526
Likes (Received): 4338

Quote:
Originally Posted by Sreekumar.k.nair View Post
No doubt that the 50 acres of land leased out by Technopark to Infosys in TP Phase II is the most densely planned and under execution Campus among all projects currently operational in all three phases of Technopark.

This picture taken by me while flying out of TRV two weeks back is proof of the level of utilisation of the Infy parcel of land, vis-a-vis the adjacent 36 acres leased to UST Global.

We cannot say its efficiently utilised, they just constructed buildings in entire stretch of land. Based on current FAR available, 15 Million sqft is possible within 50 acres. They are building just 4.3 Million sqft that too without leaving any greenery/open space.
__________________

Sreekumar.k.nair liked this post
Rajesh SM no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old September 14th, 2019, 09:24 PM   #482
TVM2020
Trivandrum @ 2020
 
TVM2020's Avatar
 
Join Date: Oct 2011
Location: Dubai/Trivandrum
Posts: 912
Likes (Received): 385

Quote:
Originally Posted by Rajesh SM View Post
We cannot say its efficiently utilised, they just constructed buildings in entire stretch of land. Based on current FAR available, 15 Million sqft is possible within 50 acres. They are building just 4.3 Million sqft that too without leaving any greenery/open space.
What's the utilization rate of UST campus of 36 acres . How about TP Phase 1 land utilization rate .
__________________
ROYAL CAPITAL 2020

http://vizhinjamport.in/
TVM2020 no está en línea   Reply With Quote
Old September 15th, 2019, 06:20 AM   #483
Sreekumar.k.nair
Sreekumar K.Nair
 
Sreekumar.k.nair's Avatar
 
Join Date: Jun 2007
Location: Trivandrum
Posts: 164
Likes (Received): 566

Quote:
Originally Posted by TVM2020 View Post
What's the utilization rate of UST campus of 36 acres . How about TP Phase 1 land utilization rate .
I fully agree with the comment by Rajesh. However, by a relative yardstick, land utilisation plan by Infosys in the 50 acre parcel is by far the best, in terms of consumption of allowable Floor Space Index (FSI).

In the 142 acre parcel of land in Technopark Phase I, including the projected future built-up area in the SEZ Campus of TCS, the total built-up area wouldn't exceed 5 million square feet. Against this theoretically they could have constructed as much as 20 million square feet. Therefore, the FSI consumed in TP Phase I is less than 1.00. If I am not mistaken, the permitted FSI for IT Parks in Kerala is 3.25.

In the 36 acres allocated to UST Global the scenario is still worse. It is 13 years since Technopark leased out the land to UST and the utilisation as on date is probably 0.50 FSI. Of course, they have been showcasing a Master Plan all these years with three or four more larger blocks.

Among all the large players who have been allotted land in Technopark, only Taurus has prepared plans that utilise the land fully.

The difference is that Taurus is the first big ticket Developer, who has been allotted land in Technopark, whereas all others have been IT Companies. The IT Companies, having received land at very low rates, have not been concerned about the optimal utilisation of the allotted land.
__________________
Sreekumar K Nair
Sreekumar.k.nair no está en línea   Reply With Quote
Old September 18th, 2019, 06:23 PM   #484
itsme_
Registered User
 
Join Date: Jul 2011
Location: Thiruvananthapuram
Posts: 769
Likes (Received): 402

UST's policy seems to be 1/3rd water bodies, 1/3rd open space and 1/3rd builtup space. That could be a reason for low utilization. I could see some construction happening towards back side of the 36 acres. Maybe they might have started the second building now
__________________

Sreekumar.k.nair liked this post
itsme_ no está en línea   Reply With Quote
Old September 19th, 2019, 05:50 PM   #485
TVM2020
Trivandrum @ 2020
 
TVM2020's Avatar
 
Join Date: Oct 2011
Location: Dubai/Trivandrum
Posts: 912
Likes (Received): 385

Quote:
Originally Posted by itsme_ View Post
UST's policy seems to be 1/3rd water bodies, 1/3rd open space and 1/3rd builtup space. That could be a reason for low utilization. I could see some construction happening towards back side of the 36 acres. Maybe they might have started the second building now


Thatís criminal wastage of prime Realestate with highway frontage.
__________________
ROYAL CAPITAL 2020

http://vizhinjamport.in/

Sreekumar.k.nair, blahcapricos liked this post
TVM2020 no está en línea   Reply With Quote
Old September 20th, 2019, 07:15 AM   #486
Tri Man
Registered User
 
Join Date: Jul 2008
Location: Home of Indian Rocket Science
Posts: 2,844
Likes (Received): 900

There is always a scope for building new tower in front side at a later stage.
As of now UST Global and TP Phase 3 are the buildings that give a metropolitan look to Trivandrum.
__________________
Trivandrum Weather

Gopal.K.Kumar liked this post
Tri Man no está en línea   Reply With Quote
Old September 22nd, 2019, 05:51 PM   #487
Pradeep Jacob
P Jacob
 
Join Date: May 2008
Location: Brussels
Posts: 1,814
Likes (Received): 542

How does having a water body be a criminal waste of land? What they need to do is to increase the FSI of the actual built up area to catch up. Is there any plan for public sewerage, waste disposal and recycling in these areas?

All this development is in the former panchayat area, we also need to develop the old city area so that the pressure on roads and infrastructure is balanced.
Pradeep Jacob no está en línea   Reply With Quote
Old September 22nd, 2019, 06:22 PM   #488
TVM2020
Trivandrum @ 2020
 
TVM2020's Avatar
 
Join Date: Oct 2011
Location: Dubai/Trivandrum
Posts: 912
Likes (Received): 385

IT Corridor | Technopark Phase II - Parcel A | IT SEZ | Infosys Campus | 1.5 Mn Sq.ft. | U/C

Quote:
Originally Posted by Pradeep Jacob View Post
How does having a water body be a criminal waste of land? What they need to do is to increase the FSI of the actual built up area to catch up. Is there any plan for public sewerage, waste disposal and recycling in these areas?

All this development is in the former panchayat area, we also need to develop the old city area so that the pressure on roads and infrastructure is balanced.


This area was acquired by TP for IT space development. If 1/3 rd of the 37 acres of prime land allotted to UST Global is left aside for a water body , itís for definite, a waste of previous land resources.

If Taurus can create such a huge built up area in 20+ acres of land , wasting 12+ acres of land
for show off is terrible.
__________________
ROYAL CAPITAL 2020

http://vizhinjamport.in/

Sreekumar.k.nair, remobecks liked this post
TVM2020 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
kerala, trivandrum

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:25 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us