Old August 24th, 2019, 04:47 PM   #3341
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

JALAN RAJA MUDA ABDUL AZIZ (KAMPUNG BARU NORTH)


https://www.mymrt.com.my/wp-content/...ru-North-1.jpg

JALAN CONLAY (CONLAY)


https://www.mymrt.com.my/wp-content/...ay-1-Large.jpg
__________________

uuldhanz89 liked this post
nazrey no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old August 24th, 2019, 04:48 PM   #3342
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

JALAN PEEL (ESCAPE SHAFT 3)


https://www.mymrt.com.my/wp-content/...-3-1-Large.jpg

JALAN CHAN SOW LIN (INTERVENTION SHAFT 3)


https://www.mymrt.com.my/wp-content/...-3-1-Large.jpg

SOUTH PORTAL


https://www.mymrt.com.my/wp-content/...al-1-Large.jpg
__________________

uuldhanz89 liked this post
nazrey no está en línea   Reply With Quote
Old August 27th, 2019, 06:01 AM   #3343
kaifa
Registered User
 
Join Date: Aug 2018
Posts: 136
Likes (Received): 97

Quote:
Originally Posted by ciltuz View Post
Out of the 10 subsystem in Communication only 5.0 item are using onri gibalHuawei
1 CTS (IT and wayside Network switch and Transmission Full Huawei)
2 Telephone (Huawei eSpace U1981)
3 Recording System (Huawei Yugao + Sepalura Tetra Recording)
4 PHP (Shang Shengtong tumpangTelephone system)
5 CCTV ( Huawei IP camera + Willowglen NVR)
6. Clock (Swiss Moba)
7. SCADA (Willowglen)
8. PIDS (Malaysia Damante)
9. Radio (Austria Sepura)
10. PA(German Borsch)
yes bro,
facts: klau tgk kat stn and system Huawei yg Prasarana/Rapid guna, TAKDE LA gempak mana pon, STANDARD ajer. maybe macai guna HP huawei kot.. hehe
signalling paling penting. ni yg complex.

KTMB byk guna SIEMENS Ruggedcom (ratus ribu per unit)
TNB pula byk guna SIEMENS Reyrolle RELAY SOLKOR (puluh ribu per unit)
share infos for u guys.


back to our MRT2 train:



esok diaorg roll out train pi sg buloh, inshallah ada update sy kongsi kan.
__________________

Last edited by UjaiDidida; August 27th, 2019 at 10:18 AM.
kaifa no está en línea   Reply With Quote
Old August 27th, 2019, 10:21 AM   #3344
kaifa
Registered User
 
Join Date: Aug 2018
Posts: 136
Likes (Received): 97

Klang Valley MRT Line 2 (Sungai Buloh-Serdang-Putrajaya - SSP Line) | Length: 52.2 km | 37 stations | Completion: 2022

Quote:
Originally Posted by kaifa View Post
yes bro,
facts: klau tgk kat stn and system Huawei yg Prasarana/Rapid guna, TAKDE LA gempak mana pon, STANDARD ajer. maybe macai guna HP huawei kot.. hehe
signalling paling penting. ni yg complex.

KTMB byk guna SIEMENS Ruggedcom (ratus ribu per unit)
TNB pula byk guna SIEMENS Reyrolle RELAY SOLKOR (puluh ribu per unit)
share infos for u guys.


back to our MRT2 train:



esok diaorg roll out train pi sg buloh, inshallah ada update sy kongsi kan.


Oh ada yg edit komen sy.
Baiklah. Sy boleh terima.

Warning juga telah di beri, bagus.


*Harap Tiada yang biased (cacat otak = berat sebelah).
Thanks ujaididida
kaifa no está en línea   Reply With Quote
Old August 27th, 2019, 10:24 AM   #3345
UjaiDidida
an ant
 
Join Date: Dec 2009
Location: Kuala Lumpur
Posts: 6,551
Likes (Received): 1857

Unnecessary arguments in the last few pages has been filtered out. Please be respectful to each other and don't feed the trolls. Tq
UjaiDidida no está en línea   Reply With Quote
Old August 27th, 2019, 10:28 AM   #3346
kaifa
Registered User
 
Join Date: Aug 2018
Posts: 136
Likes (Received): 97

Quote:
Originally Posted by UjaiDidida View Post
Unnecessary arguments in the last few pages has been filtered out. Please be respectful to each other and don't feed the trolls. Tq


Keep up the good work.

Respect is earned, not given.
It is a two way street; if you cant give it, dont expect to get it.

Keep calm and dont biased.
__________________
kaifa no está en línea   Reply With Quote
Old August 27th, 2019, 01:08 PM   #3347
vic3010
Registered User
 
Join Date: Oct 2009
Posts: 79
Likes (Received): 57

Nice twitter thread on MRT's PIDS



Click the tweet to read further
__________________

World 2 World, aim11086 liked this post

Last edited by vic3010; August 27th, 2019 at 01:19 PM.
vic3010 no está en línea   Reply With Quote
Old August 27th, 2019, 01:35 PM   #3348
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

Jalan-Putra-Permai-Taman-Universiti


https://www.mymrt.com.my/wp-content/...ti-1-Large.jpg
__________________

uuldhanz89, faisalzulkarnaen89, han29 liked this post
nazrey no está en línea   Reply With Quote
Old August 27th, 2019, 01:37 PM   #3349
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

https://www.metro-report.com/news/si...delivered.html



__________________
nazrey no está en línea   Reply With Quote
Old August 28th, 2019, 08:27 AM   #3350
Daysra
Registered User
 
Join Date: Jul 2017
Posts: 294
Likes (Received): 221


Ampang Park
__________________

lelaki_melayu2003, uuldhanz89 liked this post
Daysra no está en línea   Reply With Quote
Old August 31st, 2019, 04:57 PM   #3351
sapphire blue
Registered User
 
sapphire blue's Avatar
 
Join Date: Aug 2010
Location: ampang, selangor
Posts: 1,093
Likes (Received): 826

MEX towards Putrajaya



__________________

lelaki_melayu2003, uuldhanz89 liked this post
sapphire blue no está en línea   Reply With Quote
Old September 1st, 2019, 09:28 AM   #3352
sapphire blue
Registered User
 
sapphire blue's Avatar
 
Join Date: Aug 2010
Location: ampang, selangor
Posts: 1,093
Likes (Received): 826

Sungai Besi





__________________

lelaki_melayu2003, uuldhanz89, Daysra liked this post
sapphire blue no está en línea   Reply With Quote
Old September 6th, 2019, 03:16 AM   #3353
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

PLUS HIGHWAY (SG BULOH TOLL)


https://www.mymrt.com.my/wp-content/...h-Toll-1-1.jpg

JALAN KUALA SELANGOR (DAMANSARA DAMAI)
Access bridge construction works in progress at the Damansara Damai MRT Station site.


https://www.mymrt.com.my/wp-content/...ra-Damai-2.jpg

Ongoing preparation works for concourse slab at the Sri Damansara West MRT Station site.


https://www.mymrt.com.my/wp-content/...ra-Damai-2.jpg
__________________

uuldhanz89, shafiilham liked this post
nazrey no está en línea   Reply With Quote
Old September 6th, 2019, 03:24 AM   #3354
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

Aerial view of the installation works for steel structure lower frame as well as architectural works at concourse level of the Metro Prima MRT Station in progress.


https://www.mymrt.com.my/wp-content/...ro-Prima-1.jpg

Ongoing architectural finishes works such as installation of station façade at the Kepong Baru MRT Station site.


https://www.mymrt.com.my/wp-content/...ong-Baru-1.jpg

Ongoing installation works for steel structure upper frame and roof covering at the Jinjang MRT Station site.


https://www.mymrt.com.my/wp-content/...-Jinjang-1.jpg


https://www.mymrt.com.my/wp-content/...-Jinjang-2.jpg

Ground works for retail area of the Kampung Batu MRT Station.


https://www.mymrt.com.my/wp-content/...ung-Batu-1.jpg


https://www.mymrt.com.my/wp-content/...ung-Batu-2.jpg
__________________

uuldhanz89, shafiilham, World 2 World liked this post
nazrey no está en línea   Reply With Quote
Old September 6th, 2019, 03:28 AM   #3355
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

Ongoing reinforcement works for reinforced concrete walls at the concourse level, Entrance B of the Sentul West MRT Station.


https://www.mymrt.com.my/wp-content/...tul-West-1.jpg

View of the construction works for reinforced concrete at Hospital Kuala Lumpur MRT Station Entrance C roof slab.


https://www.mymrt.com.my/wp-content/...Lumpur-1-1.jpg

Aerial view of the gantry crane setup at the Titiwangsa MRT Station site.


https://www.mymrt.com.my/wp-content/...tiwangsa-1.jpg

Ongoing reinforcement erection of Kampung Baru North MRT Station roof slab.


https://www.mymrt.com.my/wp-content/...ru-North-1.jpg


https://www.mymrt.com.my/wp-content/...ru-North-2.jpg

Aerial view of the Conlay MRT Station site.


https://www.mymrt.com.my/wp-content/...y-Conlay-1.jpg

View of the cross passage at the Chan Sow Lin Section of tunnel being excavated and prepared for permanent structure work at the Bandar Malaysia North MRT Station site.


https://www.mymrt.com.my/wp-content/...ia-North-1.jpg
__________________
nazrey no está en línea   Reply With Quote
Old September 6th, 2019, 03:31 AM   #3356
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

Aerial view of the micro tunnelling works in progress at the underpass near the KL-Seremban Highway.


https://www.mymrt.com.my/wp-content/...-Highway-1.jpg

Aerial view of the completed launching of segmental box girder and preparation of trestle platform for launching at the Serdang Raya North MRT Station site.


https://www.mymrt.com.my/wp-content/...ya-North-1.jpg

Pandangan kerja-kerja pemasangan dinding parapet dan penghadang bunyi sedang dijalankan di tapak Stesen MRT Cyberjaya Utara.


https://www.mymrt.com.my/wp-content/...ya-North-1.jpg
nazrey no está en línea   Reply With Quote
Old September 13th, 2019, 02:31 PM   #3357
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

KL View by katka-t, on Flickr
__________________

uuldhanz89 liked this post
nazrey no está en línea   Reply With Quote
Old September 15th, 2019, 03:53 PM   #3358
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

Pemeriksaan Tapak Projek MRT2 Laluan SSP Zon Selatan
Bahagian Perancangan Rel Agensi Pengangkutan Awam Darat (APAD) telah mengadakan pemeriksaan tapak bagi projek MRT2 laluan Sungai buloh - Serdang - Putrajaya bagi kawasan zon selatan. Antara tapak projek yang dilawati merangkumi pakej V204 - laluan bawah tanah di Sri Petaling, V205 - Stesen Sg. Besi, V206 - Stesen Serdang Selatan, V207 - Terowong Mines serta laluan dibawah Lebuhraya Mex termasuk Stesen Taman Universiti (TAUS) dan Stesen Taman Putra Permai bagi pakej V208.
https://www.facebook.com/media/set/?...=1&__tn__=HH-R













__________________
nazrey no está en línea   Reply With Quote
Old September 20th, 2019, 02:38 PM   #3359
nazrey
In the brig
 
nazrey's Avatar
 
Join Date: Sep 2003
Posts: 96,229
Likes (Received): 15314

MRT SSP line at 58.9% completion as at Aug 31 this year
Bernama September 20, 2019 18:32 pm +08
Quote:
KUALA LUMPUR (Sept 20): The overall construction progress of the Mass Rapid Transit Sungai Buloh-Serdang-Putrajaya Line (MRT SSP Line) has reached 58.9 percent completion as at Aug 31, 2019, said MMC Gamuda KVMRT (FDP SSP) Sdn Bhd.

Project manager for Work Package V205, Dr Tey Chun Yean said phase one from the Sungai Buloh Station to Kampung Batu Station would be completed by July 2021, while phase two from Kampung Batu Station to Putrajaya Sentral Station is slated to be operational by July 2022.

“The MRT Sungai Buloh–Kajang line and soon to be completed MRT SSP Line are great additions to the Klang Valley transportation system,” he told a media briefing on the method of construction for the MRT SSP Line.

Furthermore, he hopes the Government will increase its spending on maintenance and public infrastructure projects to reduce the public’s dependence on personal modes of transportation.

He is hopeful that the Government would consider the MRT Line 3 in the future, which would provide a circle system and improve connectivity for Klang Valley residents.

Meanwhile, he said long span erection methods were used in the construction of the MRT SSP Line, which cross the KL-Seremban Expressway, the Besraya Highway and the Middle Ring Road 2 (MRR2).

Deputy project director (Elevated Section), Amir Malik Faeiz said long spans are defined as spans that are above 40m in length and are typically used for crossing highways, railways or wide rivers.

“As the three long spans on the alignment at the location for the V205 work package stretch over busy throughways with space and accessibility constraints, we are employing three variations of the Balanced Cantilever (BC) method to ensure construction proceeds efficiently and with minimal impact,” he added.

Spanning 52.2km with a total of 35 stations to be constructed, the MRT SSP Line aims to serve a corridor with a population of around two million.

The line will connect Sri Damansara, Kepong, Jalan Sultan Azlan Shah, Jalan Tun Razak‚ KLCC, Kuchai Lama, Seri Kembangan and Cyberjaya.
https://www.theedgemarkets.com/artic...on-aug-31-year
nazrey no está en línea   Reply With Quote
Old September 22nd, 2019, 12:33 PM   #3360
om303
Registered User
 
Join Date: Apr 2019
Posts: 12
Likes (Received): 5

MRT SSP Line Construction Time Lapse as up July 2019

om303 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 12:41 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us