HS2 | Phase 1 construction | London to Birmingham | 140mi/225km | UC - Page 25 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > UK & Ireland Architecture Forums > Transport, Urban Planning and Infrastructure

Transport, Urban Planning and Infrastructure Shaping space, urbanity and mobility


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old October 7th, 2019, 02:05 PM   #481
makita09
Registered User
 
Join Date: Sep 2009
Posts: 2,623
Likes (Received): 272

one of the engineers was quoted in a magazine somewhere as saying that they looked at ballasted track and saw that due to the high utilization once renewals started the line would be under a constant renewals cycle, which meant a TSR somewhere all the time, and that this was the reason they opted for slab track.

The exact cause of the higher maintenance requirement wasn't mentioned, but seemingly there was no technical impediment to operating at high speed on ballasted track. But it makes sense there would be waves and that they move relatively slowly compared to the SoS in solid rock / concrete.
__________________
"There is no problem so bad that you can't make it worse" - Chris Hadfield

Vulcan's Finest liked this post
makita09 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
High Speed Rail 2 (HS2) neon18 Birmingham Metro Area Transport Projects 5741 Yesterday 08:39 PM
GA | Garuda Indonesia | The Airline of Indonesia Sizter85 Airports and Aviation 16429 Yesterday 05:52 PM
BRAZIL | Urban Transport Compilation mopc Subways and Urban Transport 2202 October 12th, 2019 05:34 AM
WINNIPEG | Projects & Construction WpG_GuY City/Metro Compilations 25 October 11th, 2019 08:46 AM
Aston University Student Residences | 18fl | Comp. Biosonic Completed Projects 840 January 7th, 2012 01:48 AM


All times are GMT +2. The time now is 02:16 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us