Old August 7th, 2010, 04:01 AM   #1
egypt69
Registered User
 
egypt69's Avatar
 
Join Date: Feb 2008
Location: Cairo to Canada....repeat
Posts: 14,783
Likes (Received): 1519

ALEXANDRIA | Alexandria Regional Metro | Line 1 | Abuqir-Kilo 21 | 43km (Phase 1-3) | 33 stations | Proposed

Alexandria Regional Metro







From the National Authority for Tunnels Website:

Quote:
Alexandria is the second largest Governate in Egypt. A transportation study carried out in 1986 recommended the implementation of a Regional Metro Line extending from Abou Kir at the far east of the city to El Amreya at the far west of the city, a length of approximately 55 km. The route will make use of the existing railway line from Abou Kir to Misr station in the middle of the city, a length of 21.5 km, which is the first priority of the proposed Metro line.

A new study of the project, completed in 1999, ( The new study also proposed the detailed alignment of the whole length of the line, the basic design of the first section of the line, and the relevant documents for an international tender) amended the route to the west of the Hanoveel district at Kp 21, Alexandria-Matrouh road. The total length of the new line will be 46 km. The line will use heavy rolling stock fed through an overhead line catenary system.



The first section:

The first section of the line will be partially on grade and partially on viaduct along its 21.5 km route . This section will include the construction of a main power station, an operational control centre and a main workshop.


The second section:

The second section of the line will be in bored tunnel below the highly populated area of the city with a length of 8.5 km.

The third and last section:

The third and last section will be partially in tunnel and partially on viaduct.
http://www.nat.org.eg/eng/understudy.htm

Info from ACE Consulting Engineers:

Quote:
Alexandria Regional Metro

Phase one of the project is located in Alexandria, Egypt to connect Abu Kir station to Misr station. The whole line is comprised of 18 stations of 3 types:
■Over track: 5 stations
■At grade: 8 stations
■Elevated: 5 stations

All stations are designed to permit easy exchange of passengers.

Works included:
■Architectural
■Structural works
■Mechanical works
■Plumbing works
■Electrical works

ACE scope of work:

■Topographical survey of the whole line using total station equipment, providing all data features in their true perspectives.
■Geotechnical studies for the whole line, including field tests and calculation of the parameters of soil strata.
■Production of basic design and working drawings for all stations.

[IMG]http://i34.************/2uf85ed.png[/IMG]
http://www.ace-consultants.com/trans...lexandria2.htm

Now 2 articles, the first is from the 16th of August 2009, and the second is from the 11th of July 2010.

Quote:
لبيب : مترو الإسكندرية 2011 نسخة من مترو باريس

أعلن اللواء عادل لبيب محافظ الإسكندرية أن مجلس الوزراء يدرس حاليا مشروع تنفيذ مترو أنفاق الإسكندرية المقترح من المحافظة والذي من المقرر البدء فيه مع حلول عام 2011.

وأضاف لبيب أن المشروع يعد نقلة حضارية في مجال النقل والمواصلات بمحافظة الإسكندرية ، وسيساهم في القضاء على الاختناقات المرورية والتكدس داخل الكتلة السكنية بالمدينة للأعوام المقبلة.

وأوضح المحافظ في تصريح له يوم الأحد أن المشروع سيقام بالتعاون مع أحد البنوك الفرنسية بنظام "بي.تي.أو." وتصميم شركة مترو باريس ، حيث من المقرر أن يكون مترو الإسكندرية نسخة من مترو باريس.

وأكد محافظ الإسكندرية أن مشروع إقامة مترو الإسكندرية سيقام علي ثلاث مراحل تبدأ المرحلة الأولي منه 2011 بعد - موافقة مجلس الوزراء - وتستغرق أربعة أعوام وتربط بين محطة الرمل ومحطة فيكتوريا بطول 14 كيلو مترا مكان ترام الرمل ، على أن تقام سبع محطات تحت الأرض تبدأ من محطة الرمل وحتى محطة بولكلي.

وقال إن الدراسة المقترحة تتضمن إقامة المرحلة الثانية للمترو بين محطة مصر
ومحطة أبي قير "مكان قطار أبي قير" والمرحلة الثالثة تربط بين محطة مصر وحتى مدينة برج العرب غرب الإسكندرية.
http://www.shorouknews.com/ContentData.aspx?id=93328

Here is a translation of the above article. I used Google Translate so its a very bad translation, with lots of grammatical errors, but I hope you get the point:

Quote:
Labib: Metro Alexandria 2011, a version of the Paris Metro

Major General Adel Labib, Governor of Alexandria that the Council of Ministers is considering the implementation of the metro project proposed by the Alexandria governorate, which is scheduled to start it with 2011.

Labib added that the project is ushering in the field of transportation in Alexandria, and will contribute to eliminating traffic jams and congestion within the residential block in the city for years to come.

The governor said in a statement on Sunday that the project will be held in cooperation with a French bank system of "me. T. Or." Powered by the Paris Metro, where he is scheduled to be a copy of the Alexandria Metro Paris Metro.

The Governor of Alexandria, the setting up of Metro Alexandria will be held in three phases, beginning with the first phase of 2011, after - Cabinet approval - and a four-year link between the station, sand and Victoria Station, a 14 kilometers place tram sand, to be held seven stations under the ground to start from the station of sand to plant Bolky.

The proposed study would include the establishment of the second phase of the Metro station between Abu Qir station "place of train Abu Qir" and the third stage station between Egypt and even the Burj Al Arab city west of Alexandria.

Second Article, dated 11th July 2010, again, sorry for the bad translation:

Quote:
البدء في تنفيذ مترو الإسكندرية قريباً

أكد وزير النقل المهندس علاء فهمي احتياج مدينة الإسكندرية إلى وجود منظومة متكاملة ومتناسقة لنقل الركاب والبضائع خلال الفترة القادمة، مشيرا إلى أن أكثر من 60\% من البضائع التي تصل إلى مصر تمر عبر مينائي الإسكندرية والدخيلة.

وأشار فهمي إلى وجود دراسة متكاملة لإقامة خط محوري حول مدينة الإسكندرية يربطها شرقا وغربا ويخفف الضغط الداخلي على المدينة ويحقق إنسيابية في حركة المرور، حسب تقارير محلية الأحد.

وقال فهمي إن مشروع مترو الأنفاق الجديد الذي من المقرر أن يقام بالمدينة يعمل على القضاء على ظاهرة الكثافة السطحية الكبيرة الموجودة داخل محافظة الإسكندرية، مدللاً بذلك على نجاح تجربة مترو القاهرة حيث ينقل 2ونصف مليون راكب يومياً.

وأكد وزير النقل أن الوزارة تقوم حالياً بدراسة السبل المتاحة لتمويل المشروع عن طريق عدة محاور أساسية وفرعية وتحقيق الجدوى الإقتصادية المرجوة للمشروع.

كما أكد محافظ الإسكندرية اللواء عادل لبيب ضرورة الإسراع في تنفيذ مشروع مترو أنفاق الإسكندرية للقضاء على التكدس المروري بالإضافة إلى تنفيذ عدد من المشروعات الرئيسية التي تهدف إلى دعم تطوير منظومة النقل بالإسكندرية مثل مشروع تطوير شارع ترعة المحمودية ليصبح محور مروري ثالث بالمدينة بجانب محوري الكورنيش وأبوقير.

واقترح لبيب أن تكون النسبة الأكبر من محطات المترو المرحلة الأولى للمشروع فوق الأرض لتقليل التكلفة الإجمالية وتحقيق الجدوى من إنشائه، مؤكداً على أن المشروع سيقام على ثلاث مراحل الأولى داخل المدينة تربط بين منطقتي سيدي بشر ومحطة الرمل بطول 18 كليومترا وتمتد مراحل المشروع حتى تصل إلى مدينة برج العرب مستقبلاً.
http://www.contactcars.com/News_View...sp?NewsID=5027

Quote:
Implementation of Alexandria Metro to start soon

Transport Minister Alaa Fahmy need the city of Alexandria to the existence of an integrated and coordinated system for transporting passengers and goods during the coming period, noting that more than 60 \ of% of goods come to Egypt passed through the ports of Alexandria and exotic.

Fahmi said there is an integrated study for establishing a pivot around the city of Alexandria, linking east and west and reduce the internal pressure on the city and bring in the flow of traffic, according to local reports Sunday.

Fahmi said that the draft of the new subway, which is scheduled to take place in the city was working to eliminate the phenomenon of large surface density within the province of Alexandria, thus demonstrating the successful experience of Cairo Metro where to transfer 2 and a half million passengers daily.

The Minister of Transport confirmed that the ministry is currently studying ways available to finance the project through a number of basic themes and sub-and achieve the desired economic feasibility of the project.

He also stressed Alexandria Governor General Adel Labib, the need to expedite the implementation of a Metro Alexandria to eliminate traffic congestion in addition to a number of major projects aimed at supporting the development of transport system in Alexandria, such as Street Development Project Canal Mahmudiya to be the center of a traffic third city next to the central Corniche and Abu Qir.

It was suggested Labib be the largest proportion of the metro stations first phase of the project off the ground to reduce the total cost and the achievement of the feasibility of its inception, stressing that the project will be held on three stages of the first within the city between the areas of Sidi Bishr station and sand along the 18 kilometers stretch of the project stages until it reaches the city Burj Al Arab in the future.
http://www.contactcars.com/News_View...sp?NewsID=5027
__________________
[SIGPIC]http://www.finlandforum.org/pics/flags/ca.png[/SIGPIC]

Last edited by egypt69; August 7th, 2010 at 04:21 AM.
egypt69 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old August 7th, 2010, 04:15 AM   #2
egypt69
Registered User
 
egypt69's Avatar
 
Join Date: Feb 2008
Location: Cairo to Canada....repeat
Posts: 14,783
Likes (Received): 1519



Alexandria desperately needs a development like this. This is a good solution to Alexandria's traffic and congestion problems, and looking at the plan, the Metro is planned to go through nearly all of Alexandria's major districts and points of interests. Especially if it goes towards Borg El Arab, and connects it all the way to Abou Qir, it will help millions of people who make such daily commutes. This will really contribute to the city's infrastructure and development.
__________________
[SIGPIC]http://www.finlandforum.org/pics/flags/ca.png[/SIGPIC]
egypt69 no está en línea   Reply With Quote
Old August 7th, 2010, 04:16 AM   #3
xAbd0o
(j)r(j)-p꜂(t)
 
Join Date: Jul 2009
Posts: 22,469
Likes (Received): 1094

Great find

Hopeful in my next trip to Egypt I will take you guys U/C pics and some completed stations (My Hopes are High) for now here are rout map.

[IMG]http://i34.************/24q5nhd.jpg[/IMG]

__________________
P r ou dP h a r a o n i s t
____________________________
Always be the bitcher, not the bitché - Azmat, 2015
xAbd0o no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old August 7th, 2010, 04:23 AM   #4
xAbd0o
(j)r(j)-p꜂(t)
 
Join Date: Jul 2009
Posts: 22,469
Likes (Received): 1094

Quote:
Originally Posted by egypt69 View Post


Alexandria desperately needs a development like this. This is a good solution to Alexandria's traffic and congestion problems, and looking at the plan, the Metro is planned to go through nearly all of Alexandria's major districts and points of interests. Especially if it goes towards Borg El Arab, and connects it all the way to Abou Qir, it will help millions of people who make such daily commutes. This will really contribute to the city's infrastructure and development.
yesma3 men bo2ek raben

I hope they connect it to borg el arab airport.

But TBH the airport is small and something like this will double it's capacity. first they need to put there minds back in a build T2 for borg el arab. a big terminal.
__________________
P r ou dP h a r a o n i s t
____________________________
Always be the bitcher, not the bitché - Azmat, 2015
xAbd0o no está en línea   Reply With Quote
Old August 8th, 2010, 12:13 AM   #5
midotoria
مصر ام الدنيا
 
midotoria's Avatar
 
Join Date: Jan 2009
Location: tanta.egypt
Posts: 1,184
Likes (Received): 140

really alexandria need this project
__________________
visit Egypt..... The Land of Civilization

midotoria no está en línea   Reply With Quote
Old September 10th, 2010, 05:19 PM   #6
the_egyptian
SSC Certified
 
the_egyptian's Avatar
 
Join Date: Feb 2010
Location: Alexandria
Posts: 487
Likes (Received): 1

Quote:
أعلن محمد سالم، ممثل وزارة السياحة بالإسكندرية، اليوم الأحد، أنه سيتم إلغاء ترام الرمل بالمحافظة تمهيدا لإنشاء المرحلة الأولى من مشروع مترو الأنفاق، والممتد من منطقة فيكتوريا شرق الإسكندرية إلى منطقة محطة الرمل وسط المدينة، موضحا أن المشروع الجديد سيساهم في الحد من ظاهرة التكدس المروري بالمدينة خلال فصل الصيف.

ونفى ممثل وزارة السياحة بالإسكندرية اعتزام المحافظة إنشاء أي أنفاق بمنطقة الأزريطة وحتى منطقة الأنفوشي غرب الإسكندرية، مؤكدا أن تلك المناطق مدرجة ضمن المناطق الأثرية، حيث تضم مجموعة كبيرة من الآثار الغارقة، مما يصعب تنفيذ أي إنشاءات أو مشروعات بها.

وأكدت إحصائيات الغرف والمنشآت السياحية بالإسكندرية ارتفاع نسبة إشغالات الفنادق والمنشآت السياحية بالمحافظة خلال يوليو الماضي بنسبة 100%، في انعكاس لإقبال المواطنين ورواد المدينة على قضاء الإجازات الصيفية بالمدينة المطلة على البحر المتوسط، التي تم اختيارها عاصمة للسياحة العربية للعام الحالي 2010.

وقال سالم إن المحافظة تمتلك المقومات السياحية المتميزة، حيث تضم العديد من المجالات السياحية الجاذبة للسياح العرب والأجانب، منها سياحة التسوق والسياحة الدينية والعلاجية والرياضية.

وأضاف أن الإسكندرية تضم سياحة علاجية متميزة على المستوى العالمي، وأنه تم اختيار إحدى مستشفيات المدينة مؤخرا لتكون ضمن أهم المستشفيات العلاجية على مستوى العالم، مشيرا إلى أن وزارة السياحة تنشئ حاليا أكبر مرسى لليخوت بمنطقة "سان ستيفانو" شرق الإسكندرية، لفتح المجال لتنظيم مسابقات عالمية، مما يساهم في تنشيط حركة سياحة اليخوت بمصر.
Source

I hope we see progress soon.
__________________
" A State Of Flux That Should End Sooner Than Expected Is Actually A State Of Chaos "
|Me


--- BeLIEve Me ---

Visit Egyptian Forum Now


We achieved the Impossible. Let's build Egypt.
the_egyptian no está en línea   Reply With Quote
Old September 11th, 2010, 02:08 PM   #7
mohamedsaad
Registered User
 
mohamedsaad's Avatar
 
Join Date: Jun 2010
Location: CAIRO
Posts: 148
Likes (Received): 9

nice new.
mohamedsaad no está en línea   Reply With Quote
Old January 3rd, 2011, 11:35 PM   #8
Montrealers
Registered User
 
Join Date: Aug 2010
Location: Port-Said to Cairo
Posts: 9,095
Likes (Received): 15

Definetly good news there
Montrealers no está en línea   Reply With Quote
Old January 5th, 2011, 09:15 PM   #9
eskandarany
من المحيــط إلىٰ الخليــج
 
eskandarany's Avatar
 
Join Date: Oct 2008
Location: الإسكندرية \ GB
Posts: 773
Likes (Received): 58

Don't get ur hopes up till u see men working on the ground.
this doesn't yet seem to be the case here unfortunately
eskandarany no está en línea   Reply With Quote
Old August 12th, 2011, 06:58 AM   #10
xAbd0o
(j)r(j)-p꜂(t)
 
Join Date: Jul 2009
Posts: 22,469
Likes (Received): 1094

Alexandria Metro



The city of Alexandria is the most important city after greater cairo and that is for it’s high population density which reach 3.3 million person according to the latest census in 1996 , also the city of Alexandria is the most important centers of commerce and industry in the state and also is the most important tourist attractions centers, especially domestic tourism .
Directives issued by the Minister of Transport to complete the study of Alexandria metro and the preparation of the full specifications of the project and documents necessary to put the first stage from this project in in an international tender for the implementation of which was contracted in 1997 on the implementation of the required study with a group of Consultant Offices have been prepared offering documents for the first part of the line (Abu Qir - Cairo Station) in preparation for the start of implementation.
And the results of the study showed the following data :
1 - The project is being implemented from the station of Abu Qir and from 21 km Alexandria / Matruh highway by a length of 45 km in three stages as follows:
A –The first stage: It is the distance from Abu Qir to Egypt station with the length 21.5 km.
B –The second stage: From Egypt station to max with the length 8 k .m.
C – The third stage: From max to the end of the line with the length 15.5km.
2 – To serve the industrial area south of Amiriya with a line linking the railway between max and al Amiriya through the Lake of Mariot achieves exchange service with the subway line in the area of Max.
3 - We have taken into account in planning the path of the first part of the line to achieve communication between both sides of the line with the different surface transport and cars across 4 bridges for cars in areas Toson and el mamora , and for infantry 10 tunnels , and it will also be taken into account in Part 2 and 3 of the line that’s still under studying


BTW here is the source, http://cairometro.gov.eg/uipages/AlexMetro.aspx
__________________
P r ou dP h a r a o n i s t
____________________________
Always be the bitcher, not the bitché - Azmat, 2015
xAbd0o no está en línea   Reply With Quote
Old March 2nd, 2012, 11:53 PM   #11
Gadiri
Registered User
 
Gadiri's Avatar
 
Join Date: Oct 2009
Location: Paris-Agadir-Guelmim
Posts: 52,559
Likes (Received): 7037






http://www.ustda.gov/egyptforward/pr...esentation.pdf
__________________


FBI Says 94% of Terrorist Attacks in the US Since 1980 Are by Non-Muslims


Gadiri no está en línea   Reply With Quote
Old December 28th, 2012, 08:36 PM   #12
Icewave
Registered User
 
Icewave's Avatar
 
Join Date: Dec 2012
Location: Alexandria
Posts: 210
Likes (Received): 268

any news ??
Icewave no está en línea   Reply With Quote
Old March 3rd, 2013, 09:04 PM   #13
xAbd0o
(j)r(j)-p꜂(t)
 
Join Date: Jul 2009
Posts: 22,469
Likes (Received): 1094

فيديو.. «البرنس»: نخطط لإنشاء «مترو الإسكندرية» فوق الأرض حفاظا على الآثار
Quote:
قال حسن البرنس- نائب محافظ الإسكندرية، إن عددا من الأساتذة المتطوعين في كلية الهندسة بجامعة الإسكندرية بدؤوا في إعداد رسومات مترو الإسكندرية.

وأضاف، أن الخبراء طالبوا بألا يتم إنشاء مترو الإسكندرية تحت الأرض، حفاظًا على ما يوجد بها من آثار، مشيرًا إلى: "أننا نعمل في الوقت الحالي على إنشاء المترو فوق الأرض".

وأشار، في تصريحات لقناة «مصر 25» الفضائية، مساء الخميس، إلى أنه بمجرد الانتهاء من الرسومات والتصميمات ستبدأ مرحلة البحث عن ممول للمشروع، مؤكدًا على أن الإسكندرية كمحافظة كبرى تحتاج إلى مشروعات ضخمة، أهمها وجود وسيلة مواصلات حديثة.
http://www.shorouknews.com/news/view...c-e7139b2697d5

__________________
P r ou dP h a r a o n i s t
____________________________
Always be the bitcher, not the bitché - Azmat, 2015

mohamedsaad liked this post
xAbd0o no está en línea   Reply With Quote
Old March 4th, 2013, 09:36 AM   #14
egypt69
Registered User
 
egypt69's Avatar
 
Join Date: Feb 2008
Location: Cairo to Canada....repeat
Posts: 14,783
Likes (Received): 1519

lol @ his name
__________________
[SIGPIC]http://www.finlandforum.org/pics/flags/ca.png[/SIGPIC]
egypt69 no está en línea   Reply With Quote
Old March 4th, 2013, 11:17 AM   #15
red ahlawy
Ahlawy 100%
 
Join Date: Sep 2009
Location: Cairo
Posts: 165
Likes (Received): 2

Quote:
Originally Posted by egypt69 View Post
lol @ his name
hahahahhaha couldn't agree more
Great initiative nonetheless
__________________
"Got to meet the hottie with the million dollar body
They say its over budget but you'd pay her just to touch it come on!!"
- Nickelback
red ahlawy no está en línea   Reply With Quote
Old April 20th, 2013, 02:27 AM   #16
midotoria
مصر ام الدنيا
 
midotoria's Avatar
 
Join Date: Jan 2009
Location: tanta.egypt
Posts: 1,184
Likes (Received): 140

وزير النقل يوقع بروتوكول تعاون مع «التنمية الفرنسية» لإنشاء مترو الإسكندرية
Quote:
قع الدكتور حاتم عبد اللطيف، وزير النقل، الإثنين، بالإسكندرية، مع مدير وكالة التنمية الفرنسية، دوف زيرا، بروتوكول تعاون مع الوكالة بقيمة نصف مليون يورو، لإعداد دراسة تخطيط لإنشاء خط مترو بالمحافظة.

وقال الوزير إن الهدف من توقيع البروتوكول الذي يستغرق إعداد العمل به 14 شهراً هو إعداد وتخطيط وعمل دراسات لتحديد خط مسار مترو الإسكندرية، ومواصفاته وكمية الإنشاءات التي يحتاجها مع الوضع في الاعتبار أن يكون المسار المحدد للمترو لخدمة أكبر عدد من المواطنين.

وأشار «عبد اللطيف» إلى أنه ستتم هيكلة لنظام النقل بالمحافظة، بما يتفق مع التخطيط الإقليمي للتنمية العمرانية بالإسكندرية، حيث يتم تحديد بدائل لأحد المحاور ذات الأولوية واختيار أفضل البدائل مع تخطيط التفاصيل اللازمة لتنفيذه ودراسة الجدوى الاقتصادية لإنشاء مترو الإسكندرية الجديد.

شهد توقيع البروتوكول المستشار محمد عباس عطا، محافظ الإسكندرية وقنصل عام فرنسا بالإسكندرية، دومنيك فاج
.

http://www.almasryalyoum.com/node/1653131
__________________
visit Egypt..... The Land of Civilization

midotoria no está en línea   Reply With Quote
Old April 21st, 2013, 12:54 AM   #17
xAbd0o
(j)r(j)-p꜂(t)
 
Join Date: Jul 2009
Posts: 22,469
Likes (Received): 1094

Finally getting somewhere
__________________
P r ou dP h a r a o n i s t
____________________________
Always be the bitcher, not the bitché - Azmat, 2015
xAbd0o no está en línea   Reply With Quote
Old November 4th, 2014, 12:45 PM   #18
Arab_Hafez
Registered User
 
Arab_Hafez's Avatar
 
Join Date: Mar 2012
Location: Cairo
Posts: 268
Likes (Received): 109

Quote:
Originally Posted by midotoria View Post
وزير النقل يوقع بروتوكول تعاون مع «التنمية الفرنسية» لإنشاء مترو الإسكندرية
.
"وقال الوزير إن الهدف من توقيع البروتوكول الذي يستغرق إعداد العمل به 14 شهراً "

http://www.almasryalyoum.com/node/1653131
it's been over 14 months, and still no news... is the project another fake project?
Arab_Hafez no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:02 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.