Entwicklungsgebiet Volta Areal - Page 13 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Euroscrapers > Local discussions > Switzerland > Basel


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools Rating: Thread Rating: 13 votes, 5.00 average.
Old February 21st, 2019, 07:02 AM   #241
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Widerstand gegen Museums-Neubau: Nun muss das Basler Volk entscheiden

https://www.bzbasel.ch/basel/basel-s...iden-134111793
hrhort no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old March 20th, 2019, 07:58 AM   #242
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

«Die Kulturgüter sind in Gefahr» – Komitee setzt sich für den Neubau ein

https://www.bzbasel.ch/basel/basel-s...-ein-134230122
hrhort no está en línea   Reply With Quote
Old March 25th, 2019, 10:48 AM   #243
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

STARTWORKSHOP ZUR MITWIRKUNG BEI DER AREALENTWICKLUNG VOLTA NORD!!

Die Stimmbevölkerung hat im November 2018 den Bebauungsplan Volta Nord (Lysbüchelareal) deutlich angenommen. In der nächsten Phase sollen mehrere Planungsteams Konzepte für die Bebauung einzelner Baufelder sowie für die Frei- und Grünräume erarbeiten.

Vorgesehen ist in diesem Zusammenhang auch eine Beteiligung der Bevölkerung. Der Startworkshop findet statt am

Dienstag, 09. April.2019 um 19:30 Uhr in der Paddelhalle auf dem Lysbüchelareal

Der Kantonsbaumeister Beat Aeberhard wird über die Ziele und Rahmenbedingungen sowie über den Verfahrensablauf und die nächsten Planungsschritte informieren. Anschliessend können die Beteiligten eine Rückmeldung zu den Zielen geben, Fragen stellen und Anliegen einbringen. Aus organisatorischen Gründen bitten wir um Anmeldung bis 03. April.2019 bei
Anita Staub: [email protected]

Wir freuen uns auf Ihr zahlreiches Erscheinen!

https://www.facebook.com/groups/zuku...3021739992931/
hrhort no está en línea   Reply With Quote
Old March 26th, 2019, 09:08 AM   #244
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Basler Bevölkerung stimmt über Neubau ab

https://www.srf.ch/news/regional/bas...eber-neubau-ab
hrhort no está en línea   Reply With Quote
Old March 29th, 2019, 07:58 AM   #245
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Neubau-Gegner werfen Kanton «Behördenpropaganda» vor – Vorgehen sei «staatspolitisch heikel»

https://www.bzbasel.ch/basel/basel-s...ikel-134269233
hrhort no está en línea   Reply With Quote
Old April 13th, 2019, 10:34 AM   #246
Dreiländereck
Registered User
 
Join Date: Mar 2016
Posts: 654
Likes (Received): 102

Neinsager stören die Harmonie der Museumsbefürworter

Der Neubau des Naturhistorischen Museums werde ein teures Abenteuer, sagen Kritiker.




https://www.bazonline.ch/basel/stadt...story/17674216
Dreiländereck no está en línea   Reply With Quote
Old April 15th, 2019, 07:03 AM   #247
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

«Konzeptlos, überteuert, verfehlt»: Komitee fordert umfassende Sanierung statt Neubau

https://www.bzbasel.ch/basel/basel-s...ubau-134336969
hrhort no está en línea   Reply With Quote
Old April 15th, 2019, 07:07 AM   #248
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Sondersendung aus Museum - Kampf um umstrittenen Neubau ist eröffnet

Vor der Abstimmung über einen Neubau für das Naturhistorische Museum und das Staatsarchiv sendet das «Regionaljournal Basel» live aus dem Museum.

https://www.srf.ch/news/regional/bas...-ist-eroeffnet
hrhort no está en línea   Reply With Quote
Old April 16th, 2019, 06:53 AM   #249
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Gute Ausgangslage für den Museums-Neubau – so wollen die Parteien abstimmen

https://www.bzbasel.ch/basel/basel-s...mmen-134348226
hrhort no está en línea   Reply With Quote
Old May 3rd, 2019, 07:43 AM   #250
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Museumsneubau entzweit den Basler Heimatschutz

https://www.bazonline.ch/basel/stadt...story/22253199
hrhort no está en línea   Reply With Quote
Old May 20th, 2019, 08:32 AM   #251
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Klares Ja zum Museumsneubau

https://www.bazonline.ch/basel/stadt...story/12556701
hrhort no está en línea   Reply With Quote
Old July 9th, 2019, 06:54 AM   #252
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Raum für Kultur und Freizeit: Zieht der «Nordstern» auf das Lysbüchel-Areal?

https://www.bzbasel.ch/basel/basel-s...real-134728807
hrhort no está en línea   Reply With Quote
Old August 14th, 2019, 06:55 AM   #253
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

200 neue Genossenschaftswohnungen auf Basler Lysbüchel-Areal

https://www.bzbasel.ch/basel/basel-s...real-135401223
hrhort no está en línea   Reply With Quote
Old August 21st, 2019, 01:06 PM   #254
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Umbau Lysbüchel Süd, Basel

exCoop-Weinlager

https://www.eschsintzel.ch/de/auswah...d/?cat=planned
hrhort no está en línea   Reply With Quote
Old September 30th, 2019, 07:07 AM   #255
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205









__________________

velop liked this post
hrhort no está en línea   Reply With Quote
Old November 8th, 2019, 06:58 AM   #256
hrhort
Registered User
 
Join Date: Mar 2016
Location: Fricktal
Posts: 2,393
Likes (Received): 205

Adieu, Padel: Der grösste Zwischennutzer verlässt das Lysbüchel-Areal vorzeitig

https://www.bzbasel.ch/basel/basel-s...itig-135937760
hrhort no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Schoren-Areal rafael162 Basel 60 September 4th, 2017 08:21 PM
Frankfurt | Areal am Rebstock Bender Frankfurt 19 March 25th, 2016 05:17 PM
Entwicklungsgebiet Giesshübel Lake Zürich 144 May 10th, 2014 10:57 PM
Zürich: Bourquin-Areal / CONNECT steve5 Zürich 66 April 17th, 2011 07:15 PM
ZURICH: Amag Areal Jakob Eastern Europe / Balkans 1 December 23rd, 2007 02:26 PM


All times are GMT +2. The time now is 11:57 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us