Old December 11th, 2018, 11:15 AM   #221
kaboomerangle
urban roamer
 
Join Date: Mar 2009
Posts: 128
Likes (Received): 99

Quote:
Originally Posted by encarleone View Post
Nako boss, mahabang storya yan ako din nalito na eh.

IIRC, it was mandaluyong who proposed the project first - mas shorter range ung sa kanila.

Then itong ating magaling na DOTC (Aquino Administration), pinakialaman at inextend hanggang Sta Mesa and Rizal daw--which was good, except that they did not implement it, in short, pasikat lang.

JICA conducted the feasibility study, NEDA approved na, but was later on scrapped, now back to zero na yata.

It's not yet clear whether the "technical assistance" is already for the implementation of the project or for another round of "feasibility studies". We'll have to wait to see, I guess.

Mas ok for me ung unsolicited proposal ni Zamora for LRT 4, mas tiwala lang talaga ako sa kakayahan ng private sector.
Not necessarily...

From what I read Mandaluyong first commissioned a study that Japan's Transportation Ministry conducted for a possible transit line that will serve Mandaluyong. What the Ministry recommended which Mandaluyong agreed to was a transit line from Santa Mesa, Manila to Taytay, Rizal, with 3 route options presented to Mandaluyong: Ortigas Avenue, Shaw Boulevard, or Boni Avenue.

However, the DOTC under (P)Abaya meddled with the plan and instead announced Line 4 which would run only from the Ortigas-EDSA area to Taytay. Naturally, Mandaluyong was pissed at DOTC not only for hijacking the project but also for leaving them out in the Line 4 route.

I'm just curious though as to why Mandaluyong has not made its sentiments heard throughout all this. This is their chance but they're not saying anything, especially that this is going to benefit them.
__________________
The Urban Roamer
kaboomerangle no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old December 11th, 2018, 11:21 AM   #222
encarleone
BANNED
 
Join Date: Feb 2017
Location: Pasig
Posts: 63
Likes (Received): 44



Thanks for essentially repeating what I just said, and adding more specific info
__________________

niknok liked this post
encarleone no está en línea   Reply With Quote
Old December 11th, 2018, 12:03 PM   #223
kaboomerangle
urban roamer
 
Join Date: Mar 2009
Posts: 128
Likes (Received): 99

^I actually corrected some information you posted.

But whatever. Moving on...
__________________
The Urban Roamer
kaboomerangle no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old December 11th, 2018, 12:10 PM   #224
encarleone
BANNED
 
Join Date: Feb 2017
Location: Pasig
Posts: 63
Likes (Received): 44

Quote:
Originally Posted by kaboomerangle View Post
^I actually corrected some information you posted.

But whatever. Moving on...
Yeah agreed, you "paraphrased" and then added.
__________________

niknok liked this post
encarleone no está en línea   Reply With Quote
Old December 11th, 2018, 12:56 PM   #225
Englehart
Air, Road, Rail and Sea
 
Englehart's Avatar
 
Join Date: Jun 2009
Location: Manila
Posts: 3,252
Likes (Received): 616

in short words Pabaya Messed up everything w/in our rail transit from plans to existing ones
__________________
You can be Called a Certified Coupler Hunter
you must first undergo a Below The Job Training
Englehart no está en línea   Reply With Quote
Old December 12th, 2018, 01:17 AM   #226
jp1032
Registered User
 
Join Date: Mar 2011
Posts: 3,038
Likes (Received): 2926

Quote:
Originally Posted by Englehart View Post
in short words Pabaya Messed up everything w/in our rail transit from plans to existing ones
gusto kasi nyan ipasok ang mga kapanalig nya na mga Oligarchs
__________________

niknok liked this post
jp1032 está en línea ahora   Reply With Quote
Old December 12th, 2018, 09:07 AM   #227
Pilaps27
Registered User
 
Pilaps27's Avatar
 
Join Date: Jun 2013
Posts: 85
Likes (Received): 61

Quote:
Originally Posted by jp1032 View Post
gusto kasi nyan ipasok ang mga kapanalig nya na mga Oligarchs



Kung gusto umunlad ang bansang Pinas edi NO to LP !
__________________

niknok liked this post
Pilaps27 no está en línea   Reply With Quote
Old December 17th, 2018, 01:01 AM   #228
Magniko
DDS(Davao Dabbing Squad)
 
Magniko's Avatar
 
Join Date: Dec 2016
Posts: 720
Likes (Received): 948

He must pay for his sins! Preferably painful but non-lethal!
__________________
ooga booga unga bunga urg gruh
-Grug, 12,587 BC
Magniko no está en línea   Reply With Quote
Old December 18th, 2018, 10:44 AM   #229
baybum7
Registered User
 
baybum7's Avatar
 
Join Date: May 2015
Location: Makati
Posts: 718
Likes (Received): 620

wouldn't this lane be included in the current admin's priority projects though? kahit sabihin natin na delayed, PNR south was modified accordingly within the restudy in prep for implementation.
baybum7 no está en línea   Reply With Quote
Old January 2nd, 2019, 04:32 PM   #230
ampcell
Registered User
 
Join Date: Nov 2014
Posts: 742
Likes (Received): 343

Quote:
Originally Posted by baybum7 View Post
wouldn't this lane be included in the current admin's priority projects though? kahit sabihin natin na delayed, PNR south was modified accordingly within the restudy in prep for implementation.

Yes we seem to be lacking east west railway lines. LRT-2 East Extension is getting done but no West Extension yet?


East West Railway along Espana / Quezon Blvd is downgraded to a BRT.

All other rail projects are North South Oriented ie - MRT Rehab, JICA Subway, NSCR, even the C-5 LRT is North and South if it ever gets built.

On the DPWH front is North South again - Skyway Stage 3, NLEX Connector, C-6 Expressway - no east and west expressways.
ampcell no está en línea   Reply With Quote
Old March 3rd, 2019, 02:58 PM   #231
ganmatthew
Transport Enthusiast
 
ganmatthew's Avatar
 
Join Date: Jul 2014
Location: Mandaluyong
Posts: 474
Likes (Received): 300

Sorry for bumping this currently inactive thread, but if this project were to be elevated rail and to pass along either Shaw or Boni based on the details I've read, there's going to be quite some issues with the right of way.

Shaw and Boni have very small medians. A large part of P. Sanchez / Shaw from Sta Mesa to Kalentong and to the crossing does not even have an island median to begin with. Boni has an island median, but it is very small.

Ortigas on the other hand has a wide enough island (except when it becomes Granada, then Gilmore) but then it would be a missed opportunity to cater to the Mandaluyong area. But then again, an Ortigas alignment would be able to go almost directly towards Taytay as seen in the alignment maps.

I feel like if this line were to exist, it must be underground.
__________________

erzo01 liked this post
ganmatthew no está en línea   Reply With Quote
Old March 3rd, 2019, 03:49 PM   #232
[email protected]
Philippine Forum Mod
 
queetz@home's Avatar
 
Join Date: Jun 2004
Location: Ortigas (Pasig City)
Posts: 5,807
Likes (Received): 5325

Well, I don't have the rendering handy but if an AGT were to be used, then they were actually to SQUEEZE the elevated guideway between Shangrila Plaza and the flyover, pretty much hugging the MRT3 Shaw Station, then continue on to Shaw towards Manila. The Japanese know what they are doing when it comes to these things and they specifically said Option 3 was bad even for the AGT because of the EDSA-Ortigas flyover, but guess what Joseph Emilio Aguinaldo Abaya chose back then...
__________________
SAVE LRT2

"The best solution all over the world, time tested, safe, no pollution, is still the use of the train system." - Ms. Elvira Medina, Nat'l Center for Commuter Safety and Protection
queetz@home no está en línea   Reply With Quote
Old March 3rd, 2019, 03:51 PM   #233
ganmatthew
Transport Enthusiast
 
ganmatthew's Avatar
 
Join Date: Jul 2014
Location: Mandaluyong
Posts: 474
Likes (Received): 300

Quote:
Originally Posted by [email protected] View Post
Well, I don't have the rendering handy but if an AGT were to be used, then they were actually to SQUEEZE the elevated guideway between Shangrila Plaza and the flyover, pretty much hugging the MRT3 Shaw Station, then continue on to Shaw towards Manila. The Japanese know what they are doing when it comes to these things and they specifically said Option 3 was bad even for the AGT because of the EDSA-Ortigas flyover, but guess what Joseph Emilio Aguinaldo Abaya chose back then...
Well, the specifications of the rolling stock aren't quite here yet, so I guess that's something for us to find out.

Hopefully it could be something small yet of high capacity.
ganmatthew no está en línea   Reply With Quote
Old March 4th, 2019, 03:20 AM   #234
edly
Planner
 
Join Date: Aug 2008
Location: Pasig
Posts: 2,161
Likes (Received): 681

Quote:
Originally Posted by ganmatthew View Post

...I feel like if this line were to exist, it must be underground.
A Subway thru ODA could be a better option for this, since most of the areas are already built up and no more spaces for elevated guideways.
__________________
Keep the IRON HORSE and the National Economy Moving! Support LRT and MRT extensions and make our metropolis more livable!
10 Years in SSC and counting!
edly no está en línea   Reply With Quote
Old March 4th, 2019, 06:45 AM   #235
kaboomerangle
urban roamer
 
Join Date: Mar 2009
Posts: 128
Likes (Received): 99

If the whole line is going to be underground, I hope it would be able to address the issue of flooding in the areas it will be traversing.

The area of Ortigas Extension from the Manggahan Floodway up to Valley Golf in Cainta, as well as in the Mandaluyong area near Kalentong (whether the line will take the Boni or Shaw route) are flood-prone areas, especially during heavy rains.
__________________
The Urban Roamer
kaboomerangle no está en línea   Reply With Quote
Old March 4th, 2019, 07:49 AM   #236
papapao87
Registered User
 
Join Date: Apr 2018
Posts: 59
Likes (Received): 11

Ang best route for interconnectivity, whether gawin heavy rail or subway, would be via Shaw para may connection sa mrt Shaw Blvd and subway Ortigas South station.
papapao87 no está en línea   Reply With Quote
Old March 4th, 2019, 08:30 AM   #237
erzo01
Registered User
 
Join Date: May 2011
Location: Mandaluyong and Imus
Posts: 190
Likes (Received): 157

Quote:
Originally Posted by papapao87 View Post
Ang best route for interconnectivity, whether gawin heavy rail or subway, would be via Shaw para may connection sa mrt Shaw Blvd and subway Ortigas South station.
And it would make sense to connect this to Sta. Mesa PNR and nearby V. Mapa LRT2 station. Idamay na rin ang Pasig Ferry if it's not operational at the moment.
erzo01 no está en línea   Reply With Quote
Old March 5th, 2019, 08:48 AM   #238
ionmarx
Explorer Extraordinaire
 
ionmarx's Avatar
 
Join Date: Feb 2009
Location: Pasig City
Posts: 798
Likes (Received): 386

Quote:
Originally Posted by ganmatthew View Post
Sorry for bumping this currently inactive thread, but if this project were to be elevated rail and to pass along either Shaw or Boni based on the details I've read, there's going to be quite some issues with the right of way.

Shaw and Boni have very small medians. A large part of P. Sanchez / Shaw from Sta Mesa to Kalentong and to the crossing does not even have an island median to begin with. Boni has an island median, but it is very small.

Ortigas on the other hand has a wide enough island (except when it becomes Granada, then Gilmore) but then it would be a missed opportunity to cater to the Mandaluyong area. But then again, an Ortigas alignment would be able to go almost directly towards Taytay as seen in the alignment maps.

I feel like if this line were to exist, it must be underground.

Maybe it might be able to save on cost if the Manila-Pasig stretch is underground; the rest of the line starting near Ortigas Ave. cor Lanuza Ave. towards Rizal area can be overhead. At least pagtawid nya ng West Valley Fault sa intersection na yun above ground.

Mukha namang kumikilos na yung road widening activities sa Rizal area pati.
__________________

erzo01 liked this post
ionmarx no está en línea   Reply With Quote
Old March 5th, 2019, 02:44 PM   #239
kaboomerangle
urban roamer
 
Join Date: Mar 2009
Posts: 128
Likes (Received): 99

Quote:
Originally Posted by papapao87 View Post
Ang best route for interconnectivity, whether gawin heavy rail or subway, would be via Shaw para may connection sa mrt Shaw Blvd and subway Ortigas South station.
Around sa area ng Capitol Commons ang Ortigas South station. Parang may nakita akong plan na ang ruta ng Line 4 sa Ortigas Center ay ang ADB-San Miguel Avenue alignment...unless magiging Shaw Pasig ang alignment nito tulad ng nakita ko sa ilang concept map.
__________________
The Urban Roamer
kaboomerangle no está en línea   Reply With Quote
Old March 7th, 2019, 07:53 AM   #240
Jaspac
Registered User
 
Join Date: Feb 2016
Posts: 52
Likes (Received): 65

It's just so disappointing how this project is dead in the water. No chances of reviving it under this admin?
__________________

lianlaspinas liked this post
Jaspac no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
BRAZIL | Urban Transport Compilation mopc Subways and Urban Transport 2231 Today 06:55 AM
LRTA-LRT2+East & West Extension | Length: 13.8km+5km|11+5 Stations Transporter89 Railways 2080 November 19th, 2019 09:06 AM
Indian Railways - Projects | News | Discussions phaedrus Railways and Transportation 18315 November 18th, 2019 07:21 PM
SEOUL | Projects & Construction inno4321 City/Metro Compilations 2043 November 18th, 2019 10:30 AM
ALEXANDRIA | Alexandria Regional Metro | Line 1 | Abuqir-Kilo 21 | 43km (Phase 1-3) | 33 stations | Proposed egypt69 Transport & Infrastructure Projects | المشاريع التحتية و النقل 17 November 4th, 2014 12:45 PM


All times are GMT +2. The time now is 07:18 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us