BRT, BET & Bus Lane - Page 51 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Asian Forums > Forum Pencakar Langit Malaysia > Pengangkutan

Pengangkutan aviation, automotive, rail and urban transportation


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old May 19th, 2019, 12:58 PM   #1001
clipper103
Ice Bear wants answers.
 
clipper103's Avatar
 
Join Date: May 2014
Location: KBR/KUL
Posts: 909
Likes (Received): 740

The model shows the buses may be articulated buses - will these be the first of the type used in MY?

Quote:
Johor’s RM2.56 bil Bus Rapid Transit to take off in 2022
FMT Reporters - May 19, 2019 10:09 AM

PETALING JAYA: Johor’s RM2.56 billion Bus Rapid Transit (BRT) is finally expected to take off in early 2022 with the aim of beating congestion and pollution and encouraging more people to use public transport.

According to The Sunday Times of Singapore, the authorities are now selecting consultants who will work on the finer details of the design.

Construction is expected to begin in the first quarter of next year, with the BRT service targeted to start in the first quarter of 2022, the paper said, quoting Iskandar Malaysia Bus Rapid Transit director Rudyanto Azhar.

The report said the BRT, first conceptualised in the Transportation Blueprint for Iskandar Malaysia in 2009, will combine the speed and reliability of the light rail transit (LRT) with the affordability of a conventional bus system.

It will see high-capacity buses plying dedicated bus lanes on three main routes connecting Johor Bahru to industries and residential areas in Tebrau, universities and small and medium-sized enterprises in Skudai and new growth areas in Nusajaya.

There will be 39 stations along the 51km-long trunk lines, including stops at Larkin, Bukit Chagar near the Causeway and Medini near the Tuas Second Link.

The BRT will be supported by 42 suburban feeder services plying existing roads and 26 direct services to populated areas such as malls, hospitals and tourist spots like Legoland and Pasar Borong Pandan City, the report said.

These air-conditioned buses with Wi-Fi on board will run on clean energy at regular intervals, cutting waiting and travelling times for commuters while reducing pollution and traffic jams, it said.

The report quoted Rudyanto as saying the project cost will be financed by the government, which will contribute RM1 billion, and the private sector, and is “a fraction of the cost” of building an LRT.

“It’s been a long battle. Throughout our studies, we have looked at various alternative systems, and Bus Rapid Transit is the system of choice for the moment,” Rudyanto was quoted as saying.

According to the report, the BRT will be modelled after existing systems around the world, including Bogota in Colombia and various cities in China such as Guangzhou.

The revamped bus network will cover 90% of Iskandar Malaysia, up from the current 39%, Rudyanto said.

He hoped that with better connectivity and accessibility, more people will use public transport. Less than 10% of the region’s two million population currently do so.

The Sunday Times interviewed several Johor Bahru residents, who welcomed the BRT initiative although some insisted they would stick to the convenience of driving to get around.

The reported added that according to Global BRT Data, 170 cities have implemented such systems, serving more than 33 million people a day.

In Southeast Asia, BRT services can be found in Jakarta, Bangkok and Hanoi.
https://www.freemalaysiatoday.com/ca...e-off-in-2022/

Also the proposed corridors from Straits Time:
clipper103 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 12:57 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us