Old May 24th, 2017, 03:48 AM   #101
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

Quote:
Originally Posted by Babji View Post
http://www.eenadu.net/district/inner...&info=amr-top1


Builder asked for time till March 2018 == Govt asked to complete by 2nd October 2017
Designs not yet finalized for 6 pillars?! == HT tower needs to be shifted near Rajiv Park
Builder not getting enough skilled labor to work at pre-casting yard - local workers not willing work there?!! ...
I hope SOMA company doesn't get any other project in AP.
__________________

hasanthdayala, Babji liked this post
Vara123 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old May 26th, 2017, 06:23 PM   #102
johncraig
Registered User
 
Join Date: May 2013
Posts: 1,555
Likes (Received): 456

Vara as per my view first the very fake promise is that lengthy project in 6months to b completed ,,,,,,,,,,,then slowly dates extension . U know L and T was there at this project in tender stage n then deal doesn't worked well with them, n SOMA offered better deal. So AP govt given this project to them.........so understood n decided already by govt........just this is new collector n media hype to safeguard AP govt.. . CHEAP POLITICS.

Last edited by johncraig; May 26th, 2017 at 06:36 PM.
johncraig no está en línea   Reply With Quote
Old May 26th, 2017, 06:55 PM   #103
whatever123
BANNED
 
Join Date: May 2009
Posts: 717
Likes (Received): 436

Quote:
Originally Posted by johncraig View Post
Vara as per my view first the very fake promise is that lengthy project in 6months to b completed ,,,,,,,,,,,then slowly dates extension . U know L and T was there at this project in tender stage n then deal doesn't worked well with them, n SOMA offered better deal. So AP govt given this project to them.........so understood n decided already by govt........just this is new collector n media hype to safeguard AP govt.. . CHEAP POLITICS.


Creating some hype and hadaavidi for projects just for aggressive dates is good in my opinion within Indian context. Even if the hyped up targets are not met . But what is despicable politics is creating hype with no intent of any delivery at all like lepakshi city or vanpic project.
whatever123 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old May 26th, 2017, 10:29 PM   #104
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

Vara123 no está en línea   Reply With Quote
Old May 30th, 2017, 12:12 AM   #105
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595



Kanaka Durga Flyover Construction Works are Snail Peace | People Facing Problems | ETV Report - Published on May 26, 2017
Babji no está en línea   Reply With Quote
Old June 2nd, 2017, 11:47 PM   #106
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595


Latest update Kanaka Durga Flyover Vijayawada June 2017 - Published on Jun 1, 2017

== spine segment sewing - moves on to second span !
__________________

Vara123 liked this post
Babji no está en línea   Reply With Quote
Old June 4th, 2017, 10:16 PM   #107
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595



Quote:
Durga Gudi Flyover First Strech allowed Travelling Come & Enjoy-Position as on 03.06.2017-Vijayawada - Nag Ganta - Published on Jun 4, 2017
2:02 == Good to see the 'Speed Limit 40' sign at the recently completed road level bridge!

Babji no está en línea   Reply With Quote
Old June 8th, 2017, 09:00 AM   #108
hasanthdayala
Smile Seeker
 
hasanthdayala's Avatar
 
Join Date: Mar 2015
Location: Vijayawada-Amaravati
Posts: 1,344
Likes (Received): 755

Sumita Dawra, IAS R&B "As this is technically challenging work
We are taking steps much carefully
Late is due to carefulness but not because of negligence"
__________________
VIJAYAWADA - AMARAVATI
hasanthdayala no está en línea   Reply With Quote
Old June 8th, 2017, 02:30 PM   #109
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

'carefulness' explains sending designs for review by experts
'political interference' may explain proposal to change designs ramp/pillar structure btn Bandar canal and Rajiv Park (landing) area ...

how to explain not removing obstacles like HT power towers in the path of the flyover (near Rajiv Park) - even at this point of time?!! ...

also, it helps if officials make it clear 'from where to where' - when they make statements like they complete construction by so and so time!...

I would assume, R&B is responsible for overall coordination for completion of the project!


Last edited by Babji; June 8th, 2017 at 02:39 PM.
Babji no está en línea   Reply With Quote
Old June 8th, 2017, 07:24 PM   #110
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

http://www.eenadu.net/district/inner...&info=kri-gen1


Quote:
పైవంతెన పనుల నాణ్యతలో రాజీలేదు - ఆర్*అండ్*బీ ముఖ్య కార్యదర్శి సుమితా దావ్రా

విద్యాధరపురం, న్యూస్*టుడే: రాష్ట్ర ప్రభుత్వం ప్రతిష్టాత్మకంగా చేపట్టిన కనకదుర్గ పైవంతెన పనుల నాణ్యత విషయంలో రాజీలేదని రోడ్లు భవనాల శాఖ ముఖ్య కార్యదర్శి సుమితా దావ్రా అన్నారు. రోడ్లు, భవనాల శాఖ, దుర్గగుడి అధికారులతో కలిసి బుధవారం కనకదుర్గ పైవంతెన పనులను పరిశీలించిన అనంతరం ఆమె మాట్లాడుతూ అక్టోబరు నాటికి కనకదుర్గ పైవంతెన పనులు పూర్తి చేయాలన్న లక్ష్యంతో ఉన్నామన్నారు. వర్షాకాలం వచ్చే లోపు ప్రధాన పనులు పూర్తి చేయాలన్నారు. ఇప్పటికి 47 ఫిల్లర్లకు గాను 36 ఫిల్లర్ల నిర్మాణం పూర్తయినట్లు తెలిపారు. నదిలో వేసే ఫిల్లర్లతో పాటు ఇతర పనులు కూడా త్వరితగతిన పూర్తి చేయాలని సోమా కంపెనీ ప్రతినిధులకు సూచించారు. దుర్గగుడి టోల్*గేటు సమీపంలో నిర్మించిన పార్* బ్రిడ్జి, దుర్గమ్మ దర్శనానికి వెళ్లే భక్తుల కోసం ఏర్పాటు చేసిన సబ్*వే పనులను ఆమె పరిశీలించి పలు సూచనలు చేశారు. ఈ కార్యక్రమంలో రోడ్లు భవనాల శాఖ అధికారులు సుబ్బరాయశర్మ, జాన్* మోషే, దుర్గగుడి ఈఈ భాస్కర్* పాల్గొన్నారు.
We have set a target to complete flyover works by October (2017?!)- Chief Secretary, R&B

== from where to where? - Bhavanipuram to Bandar canal? or Bhavanipuram to Rajiv park?
== if the revised designs not even approved for Bandar canal - Rajiv park stretch, what are they talking about?
== political talk is something - people expect more clarity when public servants talk!
Babji no está en línea   Reply With Quote
Old June 9th, 2017, 08:07 AM   #111
nh9
Registered User
 
Join Date: Jul 2009
Posts: 745
Likes (Received): 380



http://www.thehindu.com/news/cities/...le18791167.ece

Quote:
The government asks contractor to complete it before Dasara

The State government had ambitious plans to complete the Kanaka Durga flyover before Krishna pushkarams last year. But the deadlines kept changing following tardy progress in the construction. Chief Minister N. Chandrababu Naidu had set August this year as fresh deadline at a review meeting. Now, in view of the practical problems, the contractor has been given time till October.

The flyover, as per the original schedule is supposed to be completed by December last. But only 40% of work had been completed so far. The government gave a year’s time for the contractor to construct the flyover. The government extended time till December this year taking the technical issues into consideration.

The work is going on at a snail’s pace for various reasons. Primarily it is due to inadequate work force and prefabricated structures. Soma Constructions, which bagged the contract, is supposed to do casting of 5 to 6 spines (a spine on the pier holds left and right wings) every day. The firm could cast about 100 spines though 400 spines were required in the flyover.

Another 11 pillars have to be constructed before July. The firm could construct 23 pillars so far. The contractor is using semi-automated technology in erection. The R&B officials suggested going for fully automated technology so that work progresses on planned lines.

When contacted, Special Chief Secretary (Roads and Buildings) Sumita Dawra said a roadmap was given to the contractor.

The works were behind the schedule primarily due to inadequate work force. Technical challenges such as curves in the design were also a hitch, she said.

“Also, our focus is on quality of the work. We cannot compromise on the safety aspect.”

The six-lane flyover, being built at a cost of ₹ 447 crore, starts at Kummaripalem and ends at the Rajiv Gandhi Municipal Park. Completion of the flyover by forthcoming Dasara is crucial since heavy influx of pilgrims will choke the route. The project design includes two vehicular underpasses and a pedestrian underpass, besides a subway in front of the Durga Ghat. The government spent about ₹ 160 crore so far.

R&B Engineer in Chief P. Subbaraya Sarma said a walking path from Kummaripalem to the temple entrance would be constructed for the convenience of devotees. A retaining wall would also be constructed near Indrakeeladri, he said.

Ms. Sumita Dawra and R&B officials inspected the ongoing work on Wednesday.
nh9 no está en línea   Reply With Quote
Old June 9th, 2017, 02:13 PM   #112
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595



We have tentatively decided 2nd October ... for major part of the work to be over ...
Babji no está en línea   Reply With Quote
Old June 12th, 2017, 05:48 PM   #113
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595



VIJAYAWADA KANAKADURGA FLYOVER - TARGETS TO SOMA CONSTRUCTIONS-a6news.com
A6 News - Published on Jun 12, 2017

backlog works of May to be completed in June along with June works!
2nd October 2017 target date to be kept !
Babji no está en línea   Reply With Quote
Old June 21st, 2017, 10:19 PM   #114
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595


Quote:
Durga Temple Flyover | Delay in Construction Works | CM Holds Review Meet
ETV Andhra Pradesh - Published on Jun 19, 2017
Babji no está en línea   Reply With Quote
Old June 22nd, 2017, 03:07 PM   #115
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

view point



Quote:
Delay in Kanaka Durga Temple Flyover Construction Flayed | Vijayawada | New Waves
NewWaves - Published on Jun 13, 2017 ...

The Kanaka Durga Temple Flyover construction in Vijayawada is delayed due to lethargic attitude of the construction company. After many reminders finally the AP CM Chandrababu Naidu has put a deadline by asking the company to complete the flyover by end of the year without fail. -
Top comments
Moram Subramanyam
Moram Subramanyam3 days ago
ఇంకొ రెండు సంవత్సరాలకు కూడ అవ్వడం డౌటె
...
Babji no está en línea   Reply With Quote
Old June 22nd, 2017, 11:58 PM   #116
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595



Quote:
Vijayawada Kanaka Durga Flyover Works - 22 June 17
Sk Nayeem - Published on Jun 22, 2017
sewing of spine segments - just completing second span - very slow progress - its like 2 days per segment (almost a month per span)?!!!...

Last edited by Babji; June 23rd, 2017 at 12:12 AM.
Babji no está en línea   Reply With Quote
Old July 1st, 2017, 02:39 PM   #117
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595


Quote:
Latest Update: Kanaka Durga Flyover Vijayawada - Bike Ride - 01 July 2017
SMAR Grid - Published on Jul 1, 2017
last few of the pile caps and pillars in the reclaimed river bed area are getting completed!
__________________

Vara123, harikrishna.narra liked this post
Babji no está en línea   Reply With Quote
Old July 6th, 2017, 04:53 PM   #118
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595


Quote:
Vijayawada Kanaka Durga Flyover Works - 6 July 2017 - Sk Nayeem - Published on Jul 6, 2017
Babji no está en línea   Reply With Quote
Old July 8th, 2017, 10:07 PM   #119
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Not before 2019?!



Quote:
Chandrababu Holds Review Meet | on Kanaka Durga Flyover Works
ETV Andhra Pradesh - Published on Jul 7, 2017
Completion by Dec 2018 (3 years and 1 month)- Finishing works by March 2019! ... Rs 10 Crore additional cost (how is it justified?!)...

No LA issues... No shortage of money ... No adverse weather conditions ... No non-cooperation from people or the govt ...
Yet, this is the how they could manage construction of a flyover - raises doubts about how the new capital construction goes!
Should so many different politicians (MLA's, MP's, Ministers ... apart from 2 collectors, 1 commissioner and top R&B executives) involve in the construction of the flyover project within last one and a half years (by the same govt) ?
Yet, they could not manage the contractor to speed up things even when weather is permitting and no-LA-issues?!
what could be the root cause of this stubborn, lethargic and defiant behaviour of the contractor in this case?!!
what makes the contractor so defiant and for what reason?!!!

did the govt make a mistake by awarding all components of works as one single project and giving to one single contractor? ...
going by this example, how long would Benz Circle flyover take ? (though it is by a different contractor, assuming that all contractors work under similar situation!)
should we put all the blame for delay on the contractor only???
many questions ...

Last edited by Babji; July 9th, 2017 at 01:39 AM.
Babji no está en línea   Reply With Quote
Old July 12th, 2017, 09:48 PM   #120
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

... the project will be ready for inauguration by March 2018

http://www.deccanchronicle.com/natio...slow-pace.html
Quote:
Kanakadurga flyover work at slow pace
DECCAN CHRONICLE. | VENU LANKA Published Jul 12, 2017, 8:08 am IST

Vijayawada: Delay in Kanakadurga flyover works which was dream project of the citizens, is increasing their traffic woes. Slow pace of the works and extended deadlines are irking the residents of Bhavanipuram, Vidya-dharapuram and Golla-pudi, who were eagerly waiting for the completion of the project. Meanwhile, requests from contract agency on extending the deadline to 2018 is creating worries.

Telugu Desam government had given top priority to Kanakadurga Flyover project as promised in 2014 elections and started works with a motive of completing it by Krishna Pushkaralu. But the contract agency Soma had failed to complete the works before Pushkaralu due to many reasons and the government had allowed the agency to extend deadlines considering the genuine problem.

Residents of Bhavanipuram who are facing problems with traffic diversions are demanding that the government not extend deadline any more considering the difficulty faced in the traffic. “We are the ones who felt happy with the announcement of flyover. But months are passing and still construction works are continuing at a snail’s pace. We are travelling 5 kilometers additionally to reach a destination which is a mile away from here. Rains have damaged the alternative roads and traffic at Tunnel Centre has become horrible,” says Bollaram Nagendra Babu, a motorist.

The agency which promised to complete works by December 2018 has requested to extend the deadline and CM N. Chandrababu Naidu has seriously said that it would not be extended and that he will monitor the progress every month. “Kanakadurga flyover was the most challenging project as the pillars had to be laid in the canal and Krishna river. “We have decided to go with overhead launching system to give a shape to the project by December 2017 and the project will be ready for inauguration by March 2018 as per the ultimatum issued by the Chief Minister,” says R&B NH wing engineer-in-chief P. Subbaraya Sharma.
__________________

Vara123 liked this post
Babji no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:45 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us