Amaravati | Roads | Flyovers | Underpasses - Page 2 - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Asian Forums > India > South > South India Projects > Andhra Pradesh > Amaravati


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old September 13th, 2016, 05:47 PM   #21
rk007
Registered User
 
Join Date: Jul 2015
Posts: 33
Likes (Received): 21

Quote:
Originally Posted by nh9 View Post
what is the status of the secretariat. Are all 5 blocks done ??
this is 1 week back status update, more than 1000 workers are working and Works are going at rapid speed, so present status may be different

1st Block is 95% completed and 2nd 3rd 4th 5th blocks are 99% done, finishing works like touch ups and washroom works are going on.

1st block: which is CM block, ground floor is done completely, ground floor is for CM secretaries ( i saw approximately 6 chambers for secretaries ) and CM lobby, it is completed.1st floor is for CM chamber and CM lobby, CM chamber works not started, for CM chamber and attached rooms only walls are there , even flooring or ceiling works not started may be they intentionally want to start the CM chamber work at the end ,
other than CM chamber on the first floor other cabins, Hall and office space is 90% completed.

2nd Block : almost completed , Finance minister chamber is 100% completed and already started working from here .

3rd block: almost completed , some minor works are going on , full of Minister Peethala Sujatha posters, All minister chambers are completed but name plates not attached to chambers so no idea of which chamber is allocated to which minister

4th block: almost completed, Education Minister Ganta Srinivasa Rao and Irrigation minister chambers are completed 100% on first floor . some minor works are going on

5th block: almost completed and some pending works are going on

6th block : it is for AP assembly and AP legislative council, works are going on and some 40% completed


Some other points :

name plates are there for many IAS chambers

there are many officer chambers and many 3 side wall and 1 side glass wall entry cabins for some other officers

other than CM chamber and rooms around it, all the blocks flooring tiles , led lights and false ceiling with water sprinkles and fire sensors works are done 99%

Installed lots of AC's , almost everywhere there are cassette ac's, for example in one minister cabin there are 5 cassette ac's and few more in attached rooms of minister cabins, like that from IAS officers to small officer cabins , walking areas, employee office areas everywhere there Cassette AC's ( in some blocks they used Daikin and in other block they used Voltas brand)

Schneider brand is used for electricity equipment

Wasting lots of electricity: All the AC's and Led lights installed in all blocks are running continuously, even though no one is there in chambers or meeting halls or dining halls.

As per Vastu Master room will we on the South west corner , so looks like that corner chambers are allocated to main ministers , South west corner of the block 1 first floor for CM, 2nd block 1st floor corner chamber for Finance Minister yanamala ramakrishnudu , 4th block 1st floor corner chamber for Education Minister Ganta Srinivasa Rao, other blocks ground floor and 1st floor south west corner ones name plates not added or i might had not noticed it.

Internal roads are also completed but central divider for roads works not started .
greenery / beautification/ landscaping works not started
parking place construction is going on
main water tank ( or it may be some other building related to water ) works are going
drainage works are some 70% completed
compound wall works are some 60% completed
Approach Road / Mandadam & Velagapudi Bypass Road : it is 60 feet width and 3.5 kms length road starts from krishnayapalem, some 15% works are completed
waste recycle plant in 7 acres coming up at krishnayapalem , some 10% completed
__________________

Last edited by rk007; September 14th, 2016 at 06:12 AM.
rk007 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old October 2nd, 2016, 07:29 AM   #22
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

Capital Roads





http://epaper.eenadu.net/index.php?r..._003135017.jpg

http://epaper.eenadu.net/index.php?r..._004135009.jpg
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.
gmanohar no está en línea   Reply With Quote
Old October 2nd, 2016, 08:42 AM   #23
Gudavalli
Moderator
 
Join Date: Aug 2011
Posts: 18,244
Likes (Received): 5154

Gudavalli no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old October 11th, 2016, 08:07 AM   #24
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

'Vastu compliant' spot chosen for barrage connecting Hyd-Vijayawada highway to Amaravati

A 'vastu' compliant location has reportedly been chosen for the barrage on Krishna river that will connect Andhra's new capital of Amaravati with the Hyderabad-Vijaywada national highway.
The Deccan Chronicle reported:
The Krishna flows east and turns to north side at Vykuntapuram hill and later returns eastward giving it the name: Uttaravahini. This east to north and back to east, twist is considered auspicious as per Hindu belief and Vastu. The state government which believes in Vastu, chose this place for the barrage that would come across Krishna between Vykuntapuram of Amaravati Capital Region and Damuluru of Krishna district.
The report also quotes senior pundit P Rama Sarma stating that the construction of barrage at this juncture would be good for the new capital Amaravati.
The Andhra Pradesh state government is no stranger to activities like these, as chief minister Chandrababu Naidu is a strong believer in superstition.
Even his promise of constructing a first-class capital that was on par with technology from the 21st century, did not begin without the consultation of his 'vastu' advisor first.
Amaravati was off to a 'vastu' approved start as pujas and special homams were conducted at Uddandara-yunipalem ahead of the foundation stone laying programme.
Read - Andhra's new capital is 'vastu' approved as Naidu's advisor visits site
Even at the Telugu Desam Party's 'Mahanadu', at Tirupati in May this year, it was ensured that Naidu entered the venue through the north-east entrance and walked through the north-east corner before getting on to the dais.


http://www.thenewsminute.com/article...maravati-51166
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.
gmanohar no está en línea   Reply With Quote
Old October 28th, 2016, 02:18 AM   #25
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

__________________

Babji liked this post
Vara123 no está en línea   Reply With Quote
Old November 14th, 2016, 03:53 AM   #26
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

Amaravati Roads




Source : Eenadu
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.

hasanthdayala liked this post
gmanohar no está en línea   Reply With Quote
Old November 15th, 2016, 03:41 AM   #27
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

__________________

Babji liked this post
Vara123 no está en línea   Reply With Quote
Old November 15th, 2016, 03:46 AM   #28
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

__________________

Babji liked this post
Vara123 no está en línea   Reply With Quote
Old November 25th, 2016, 04:58 PM   #29
hasanthdayala
Smile Seeker
 
hasanthdayala's Avatar
 
Join Date: Mar 2015
Location: Vijayawada-Amaravati
Posts: 1,344
Likes (Received): 755

__________________
VIJAYAWADA - AMARAVATI

Babji liked this post
hasanthdayala no está en línea   Reply With Quote
Old November 28th, 2016, 01:19 PM   #30
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Work on Amaravati Seed Access Road commences

http://www.deccanchronicle.com/natio...commences.html

Quote:
Work on Amaravati Seed Access Road commences
DECCAN CHRONICLE. Published Nov 28, 2016, 6:51 am ISTUpdated Nov 28, 2016, 7:15 am IST

23-km highway from Undavalli to Dondapadu for better connectivity.

Guntur: Work on Amaravati Seed Access Road has started at Venkatapalem of Amaravati Capital Region for the construction of a 23-km highway from Undavalli to Dondapadu. Besides this, seven other highways will connect Amaravati from all directions.

Further, two railway lines have been proposed to give rail connectivity to Amaravati and an international airport near Mangalagiri for the new capital’s air connectivity.

The APCRDA has estimated Rs 41,235 crore as requirement to develop basic amenities under which roads would be developed to international standards. Internat-ionally reputed medical, health and educational institutions like VIT University, SRM University, Indo-UK Health Institute, Amrita Sai University and others would start their institutes.

International and national-level schools will also start their schools. On November 3, VIT University laid the foundation stone for their institution at Ainavolu and SRM University and others are planning to perform bhumi pujas to start construction...

Senior lecturer S. Rahman said that the development process depends on good quality roads. So, Amaravati roads should be of international standard as, in future, construction materials, including machinery have to be transported for Amaravati’s construction.

APCRDA commissioner Ch. Sreedhar said two teams would be sent to Mumbai and Gujarat to study urban development and APRCDA will provide best infrastructure on the basis of Maharashtra and Gujarat urban development process. “Amaravati Seed Access Road works have started and world-class social infrastructure would be provided in Amaravati Capital Region by inviting the best developers of the world”. He added that besides road network, two additional railway lines have been proposed for Amaravati, connecting the capital with Vijayawada, Guntur, Amaravati and Tenali. A Japanese firm will study the Amara-vati rail project.
Babji no está en línea   Reply With Quote
Old November 30th, 2016, 04:33 PM   #31
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Vijayawada Bypass Road

https://www.youtube.com/watch?v=j6jWGKvwyPU

Vijayawada Bypass Road Contract Taken Over by Gammon India Ltd
ETV Andhra Pradesh - Published on Nov 23, 2016
Gammon India Takeover Vijayawada Gundugolanu Bypass Road Contract | A Report

Quote:
'Kaza (near Mangalagiri) - China Avutapalli (near Gannavaram)' 48 Km bypass road @ Rs 16,800 Cr by Gammon India Ltd (funds from Hinduja)
China Avutapalli - Gundugolanu 55 Km NH portion
SG to bear the cost of Iconic bridge (3Km long bridge on river Krishna)
__________________

hasanthdayala liked this post

Last edited by Babji; November 30th, 2016 at 05:24 PM.
Babji no está en línea   Reply With Quote
Old December 1st, 2016, 08:49 PM   #32
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Inner Ring Road of 94.5 km length and ORR of 150 km

http://www.deccanchronicle.com/natio...amaravati.html

Quote:
Chandrababu Naidu promises big roads for Amaravati
DECCAN CHRONICLE. Published Dec 1, 2016, 3:08 am ISTUpdated Dec 1, 2016, 3:09 am IST

Vijayawada: Chief Minister N. Chandrababu Naidu has directed the CRDA officials to take care about the quality of works being executed by private agencies from time to time.

Addressing a weekly meeting on the CRDA and other capital-related activities at Velagapudi Secretariat on Wednesday, the Chief Minister felt that additional burden will be there on the government in case the private agencies do not perform up to the mark.

The officials have submitted three proposals for Inner Ring Road of 94.5 km length, Outer Ring Road of 150 km and 210 km length Regional Ring Road.

The Chief Minister, who has released Puraseva mobile app on the occasion, said that the roads should be built on the lines of Beijing roads to cater to the future needs of the state. The officials informed the Chief Minister that 4,73,000 acres of land will be under Outer Ring Road limits and 9 lakh acres of land will be under Regional Ring Road (RRR) limits.

The Inner Ring Road (IRR) will facilitate the smooth journey from capital region to Gannavaram airport via Kachavaram, Vaikunthapuram, Pedaparimi, Tadikonda, China-kakani, Pedavadlapudi, Nutakki, Tadigadapa, Enikepadu, Nunna, Gollapudi and Ibrahimpatnam.
__________________

Vara123, hasanthdayala liked this post
Babji no está en línea   Reply With Quote
Old December 15th, 2016, 07:24 AM   #33
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

186 KM ORR for Amaravati






Source : Eenadu
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.

Babji, Vara123 liked this post
gmanohar no está en línea   Reply With Quote
Old December 16th, 2016, 11:25 AM   #34
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

ORR Further Details






Source : Eenadu
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.

Vara123, Babji, hasanthdayala liked this post
gmanohar no está en línea   Reply With Quote
Old December 16th, 2016, 04:02 PM   #35
tikkasriharsha
Sriharsha
 
tikkasriharsha's Avatar
 
Join Date: May 2012
Location: Hyderabad, New Delhi
Posts: 993
Likes (Received): 1731

__________________
Discover India


Vara123 liked this post
tikkasriharsha no está en línea   Reply With Quote
Old December 18th, 2016, 05:56 AM   #36
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

Ready to start Highways






Source : Eenadu
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.

hasanthdayala liked this post
gmanohar no está en línea   Reply With Quote
Old December 28th, 2016, 08:16 AM   #37
gmanohar
Registered User
 
gmanohar's Avatar
 
Join Date: Sep 2014
Posts: 1,365
Likes (Received): 551

6 lane bridge across Krishna River







Source : Andhra Jyothy
__________________
.


https://www.facebook.com/apdevelopment


All copyrights belong to their respective owners.

hasanthdayala, Babji liked this post
gmanohar no está en línea   Reply With Quote
Old January 4th, 2017, 11:15 PM   #38
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Benz Circle Flyover - Soil testing works commenced!

https://www.youtube.com/watch?v=uzIz33rV1YI

Special Story On Vijayawada flyover || CVR News
CVR NEWS - Published on Jan 1, 2017

https://www.youtube.com/watch?v=X5oWBbu80AU
Vijayawada Benz Circle Flyover Works Start | AP Government || CVR NEWS
CVR NEWS - Published on Dec 31, 2016

Benz Circle Flyover - Soil testing works commenced!
Babji no está en línea   Reply With Quote
Old January 5th, 2017, 04:31 PM   #39
Babji
Registered User
 
Join Date: Mar 2006
Posts: 7,336
Likes (Received): 595

Benz circle flyover works to commence only after completing Durga Flyover

http://www.eenadu.net/district/inner...&info=amr-top2

Quote:
ఆ తర్వాతే.. ఈ వంతెన
కనకదుర్గ పైవంతెన నిర్మించిన అనంతరం బెంజిసర్కిల్* వంతెన పనులు
ఆకృతుల రూపకల్పనలో అధికారులు * మట్టి నమూనాల సేకరణ - ఈనాడు, అమరావతి

గత కొన్నేళ్లుగా వూరిస్తున్న బెంజి సర్కిల్* పైవంతెన నిర్మాణం మరింత ఆలస్యమయ్యే అవకాశం ఉంది. ఆకృతులను రూపొందించే పనిలో అధికారులు నిమగ్నమయ్యారు. మరోవైపు గుత్త సంస్థ, జాతీయ రహదారుల సంస్థ ఆధ్వర్యంలో మట్టి నమూనాల సేకరణ జరుగుతోంది. మట్టి నమూనా పరీక్షలు వెల్లడైనట్లు తెలిసింది. దీనికి సంబంధించి సాంకేతిక అంశాలపై దృష్టి సారించారు. పైవంతెన ఆకృతులు పూర్తయిన వెంటనే నిర్మాణం ప్రారంభించాలని నిర్ణయించారు.దీనికి జాతీయ రహదారుల సంస్థ ఆధ్వర్యంలోనే నిర్మాణం జరుగుతున్న కనకదుర్గ పైవంతెన నిర్మాణానికి ముడిపడింది. దీనికి సంబంధించిన వివరాలిలా ఉన్నాయి. బెంజిసర్కిల్* ఫైవంతెనను జాతీయ రహదారిపై నిర్మించాలి. కనకదుర్గ పైవంతెన పనులు పూర్తయితే చెన్నై, విశాఖ నుంచి వచ్చే వాహనాలను అటువైపు మళ్లిస్తారు. ప్రస్తుతం చెన్నై- విశాఖ వాహనాలు 16వ నెంబరు జాతీయ రహదారిపై బెంజి సర్కిల్* మీదుగానే వెళ్లుతున్నాయి. వచ్చే ఏప్రిల్* నాటికి కనకదుర్గ పైవంతెన పనులు పూర్తిచేయాలని అధికారులు ఆదేశించారు. జూన్* వరకు పట్టే అవకాశాలు ఉన్నాయని గుత్త సంస్థ చెబుతోంది. ఆ తర్వాతే బెంజి సర్కిల్* పనులు ప్రారంభం అవుతాయి. రామవరప్పాడు వరకు బెంజి సర్కిల్* పైవంతెన పొడిగించే ప్రతిపానలు లేనట్లేనని తెలిసింది. దీనికి కేంద్ర ప్రభుత్వం అంగీకరించలేదు. బెంజిసర్కిల్* పైవంతెన రామవరప్పాడు వరకు పొడిగించాలని తాజగా విజయవాడ ఎంపీ కేశినేని నాని కేంద్రానికి లేఖ రాశారు. రాజధాని ప్రాంతం కావడం, భవిష్యత్తు అవసరాలను దృష్టిలో ఉంచుకొని ఎక్స్*ప్రెస్*వే తరహాలో నిర్మాణం చేయాలని సూచించారు. కానీ రాజధానికి బాహ్య, అంతర వలయ రహదారులు ఏర్పాటు చేస్తున్నందున ఈ ప్రతిపాదన అంతగా ప్రాధాన్యం సంతరించుకోలేదని తెలిసింది.

బందరు రోడ్డు విస్తరణ..!
ఈ ప్రాజెక్టులో భాగంగానే బందరు రోడ్డు విస్తరణ పనులు చేపడుతున్నారు. దీనికి భూసేకరణ శీఘ్రగతిన జరుగుతోంది. కంకిపాడు, పెనమలూరు మండలాల్లో భూసేకరణ జరుగుతోంది. రోడ్డుకు ఇరువైపులా ఉన్న ఆక్రమణలను తొలగించే పనిలో ఉన్నారు. 64 కిలోమీరట్ల మేరకు నిర్మాణం చేయాల్సి ఉంది. ఈ పనులను వెంటనే చేపట్టాలని గుత్త సంస్థకు సూచించారు. పలుగ్రామాల్లో పనులు ప్రారంభించారు. వచ్చే ఏడాది నాటికి నాలుగు వరసల బందరు రోడ్డు నిర్మాణం పూర్తి చేయనున్నారు. బందరు పోర్టు ఏర్పాటు, మచిలీపట్నం ప్రాంత అభివృద్ధిని దృష్టిలో ఉంచుకొని శీఘ్రగతిన నిర్మాణం చేయాలని నిర్ణయించారు.
Benz circle flyover works to commence only after completing Durga Flyover (June 2017)
Visakha - Chennai traffic needs to be diverted via Durga Flyover to build B Circle flyover!
Babji no está en línea   Reply With Quote
Old January 9th, 2017, 03:41 AM   #40
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 1,060
Likes (Received): 246

Vara123 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:21 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us