World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

City Railway Station to get Power from in-house Solar Plant

By UdaipurTimes Team on April 5, 2015
Quote:
In line to become energy savvy and independent, Udiapur City Station inaugurated its Solar Power System today.

The 20KWP Solar Power System was inaugurated by Naresh Salecha, Mandal Rail Manager today at 12.15PM.

The system is financially supported by Container Corporation (ConCor) and the officials of ConCor were also present in the inauguration.



On 8th Sept. 2014 Concor, Central Electronic Limited (CEL) and Railways entered into a joint agreement for installing Solar Power Systems at Ajmer and Udaipur. The financial support was provided by Concor and CEL installed the systems at the stations under the supervision of Railways.
New Passenger Entrance for Railway Station

By UdaipurTimes Team on April 7, 2015
Quote:
Nagar Nigam has issued a letter, which states that Nagar Nigam will issue Rs. 1 Crore for the development of second entry at the City railway Station once the work order for the same is released.

The letter which was addressed to Divisional Railway Manager (DRM), Ajmer was sent after Mayor Chandra Singh Kothari and DRM Naresh Salocha met for discussing the possibility of second entrance for City Railway Station, Udaipur.

Furthermore, once the work order is released Nagar Nigam will arrange the rest of the amount, which is Rs. 50 lac with the help of either of UIT, RSMM, Hindustan Zinc or MLA Fund.

On the other positive side, Railway has already started working for the second entrance where pits and gaps have been filled with construction material and is being leveled now. Also, two iron spans are built which will increase the over bridge height to 48 meters.

As per Mayor, though he has the right to issue up to Rs. 2 Crores in funds, a meeting will be conducted where the proposal will be passed by the board to maintain transparency.

“We are all geared up for the construction of the passenger block (which will have a ticket counter) and as soon as the amount will be credited in the account, our engineers will start working.”, as per DRM, Naresh Salocha.

Source: Dainik Bhaskar
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old April 14th, 2015, 09:09 PM   #62
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Biological Park Inaugurated by Prakash Javedekar

By UdaipurTimes Team on April 12, 2015
Quote:


Union Minister of State for Environment, Forest and Climate Change, Prakash Javedekar inaugurated Sajjangarh Biological Park today. He praised the structural beauty and the attractive design of the Park.



Prakash Javedekar congratulated Architect Sanjay Gupte for his efforts and also had a brief chat with Home Minister Gulab Chand Kataria regarding the upcoming Rainwater Harvesting Project at the Biological Park and the Bird Park Project. He assured support in these projects..

Javedekar stated that this Biological Park will benefit people in terms of occupation, ecotourism, and a way to get close to nature.



Kataria, in his address said, “Now that the first phase of Biological Park, which cost around Rs. 26 Crore is complete, a new project, worth Rs. 87 Lac is in progress where the Rain Water will be stored via an ‘anikat’, which will preserve 10 Lac liter water.”



“UIT and Nagar Nigam have agreed to contribute Rs. 1.75 Crore each for the Bird Park project in Gulab Bagh that is estimated to cost around Rs. 11 Crore.”, he added.

Kataria also made an appeal to Javadekar, where he asked for support on the revised draft of Rs. 85 Crores for the development of Aayad River around Udaipur. This was previously Rs. 140 Crore. “We will develop Aayad river on the model of Venice, which will add to the beauty of the city”, said Kataria.



Chief Forest Conservator, Rahul Bhatnagar, Dr. T. Mohanraj, Dr. Satish Sharma, Sohail Majboor, Dinesh Bhatt, Pramod Samar, Chunnilal Garasia and many other well known faces from the city were present in the event.

Both the Ministers toured the entire Park after the inauguration formalities concluded.



New Spots for Visarjan

By UdaipurTimes Team on April 7, 2015
Quote:


In a positive initiative to restrain the pollution in lakes of the city, Urban Improvement Trust (UIT) will be constructing two water blocks (kund), for Visarjan of sculptures during religious events.

UIT will be constructing these water blocks at Dudhtalai and near Ambapol, Sewage Pump House which will cost around Rs. 28 lacs.

Worth to note that High Court issued strict orders after hearing on 24th February, regarding Pollution in Lakes and treating every action by anyone including washing clothes, immersing sculptures in lakes, throwing garbage, etc in lakes to be treated as offence under IPC 268 and 277.

On Monday, officials of State Government, UIT and Nagar Nigam met Judge Govind Mathur and Jayshree Thakur and presented the progress report including this move.

This news came as a positive step towards preserving our lakes and finding out a solution of a persistent problem.

Source: Dainik Bhaskar
Lake conservators address Public to maintain Cleanliness

By UdaipurTimes Team on April 13, 2015
Quote:


Jheel Hiteshi Nagrik Manch working diligently to clean the lakes of the city removed around 2 quintal of waste and water grass from Rang Sagar, Teera Magri and Nai Puliya on Sunday.

The members of the NGO Haji Sardar Mohammad, Kamlesh Purohit, Prakash Parihar, Sohanlal Kalyana, Kishore Gehlot, Zulfikar Sheikh, Mukesh Kumawat, Haji Noor Mohammad, A R Khan, Bhanwar lal Sharma and Anwar Sheikh organized a Shramdaan and took out 35 bottles of water & liquor and 27 coconuts along with the waste.



During Shramdaan, the members spread the message of cleaning and maintaining the cleanliness in the lakes through a loud speaker to all the passersby from Nai Puliya. They also appealed strongly to district administration to take up strict actions against the violators.
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old April 14th, 2015, 09:14 PM   #63
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

City bus service launched

Kataria launches 8 City Buses, proposes 4 more buses from MLA quota

By UdaipurTimes Team on April 10, 2015
Quote:


Home Minister Gulab Chand Kataria inaugurated the city bus services at Town hall premises today. On this occasion, 8 city buses were unveiled which will provide cheap, safe commuting to the residents. During the ceremony he also proposed introducing 4 more buses from MLA quota.

He said that the monthly passes will be available to school students and senior citizens at discounted price. Besides this, he emphasized various means to beautify the city and make an attempt for its growth.

Mayor Chandra Singh Kothari informed that various measures are in the pipeline for Udaipur’s fast growth in terms of availability of 7 fire stations, LED lights in the entire city, colorful lights at tourist spots, water distribution through tankers at remote areas, provision of poster-less city, waste management, establishment of food court and demolishing encroachments in the city etc.

Deputy Mayor Lokesh Dwivedi said that in the first stage, commencement of 8 city buses have started on two major routes. The 24-seater buses have been made with a budget of Rs. 70.49 Lac.

In the launching ceremony, delegates including Shantilal Meghwal, Sunderlal Bhanawat, Dr. Geeta Patel, Yudhishthir Kumawat, Pramod Samar and many others were present.
6am-10pm: Bus Services -Structured Public Transport for Udaipur

By UdaipurTimes Team on April 10, 2015
Quote:


Route 1: Shiksha Bhavan >< Chetak Circle >< Hathipol >< Delhi Gate >< Town Hall Road >< Surajpol >< Udiapol >< City Railway Station >< Patel Circle (Paras)

Route 2: Income Tax Office (Panchwati) >< Bhupal Pura Intersection (Bansi Pan) >< Court Chauraha >< Shastri Circle >< Ashok Nagar Main Road >< Bekni Puliya (Ayad) >< University Main Gate >< Bohra Ganesh Ji >< Dhoolkot Chauraha >< Thokar Chauraha >< Sevashram >< Kumharo Ka Bhatta >< Surajpol

The above routes have been finalized for the two City Buses that will ply from Friday onward. This service will be inaugurated by Home Minister Gulabchand Kataria at a function to be held at Town Hall Road on Friday at 9:30am.

Mayor Chandra Singh Kothari said that the service will be operational 7 days a week from 6am till 10pm and the charges will vary between Rs. 5 – Rs. 20. Students, disabled and Senior Citizens will get a 50% Discount on the chart rates.
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old May 16th, 2015, 02:57 PM   #64
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

New Entry Gate for City Station by August

By UdaipurTimes Team on May 13, 2015
Quote:
.

Udaipur City Railway Station will add a new entry gate towards the Tekri-Police Line End, facilitating additional and easy passage for about 50K passengers. This entry will be commissioned by August 2015.

Budgeted at Rs. 1.5 Crore, the UMC has issued a payment of Rs 50 Lac towards the project, subsequent to the meeting on Tuesday. This is validated as per the earlier commitment of the UMC to fund the project with Rs. 1 Crore. The two month old verbal agreement was translated to paper when Ajmer Division Head Naresh Salocha, Mayor Kothari and senior members of the departments met at the construction site. The first cheque of Rs. 50 lac was given on Tuesday evening, with a promise to hand over the second payment after 10 days and the third after another 10 days.

Udaipur City Railway Station will be the second in the state after Jaipur to have two entry gates and will be funded exclusively by UMC, MP Fund and MLA Fund. Rs 1 Crore will be given by the UMC, Rs. 20 Lac from MP Arjun Lal Meena, Rs. 15 Lac from MLA Gulab Chand Kataria and Rs. 15 Lac from Rural MLA Phool Singh Meena. The Second Entry Gate at Jaipur was funded by the Railway Fund.
Encroachment removed from Dhanmandi & Ashwini Bazar

By UdaipurTimes Team on May 12, 2015
Quote:


Nagar Nigam started its drive to remove temporary encroachment from city’s Dhanmandi, Tel bazaar, Teej ka Chowk, Nada Khada and Ashwini market areas.

The drive will be carried out in the city from Monday to Friday; 5 days a week. Nigam also photographed the work done by the officials as record. During the drive, Nitish Bhatnagar, Chaman Singh and Abhay Kumar were also present.

On the first day, few owners protested against the Nigam’s drive. However, Nigam acted liberal towards them and warned them that if the temporary encroachment is not removed in time, strict actions will be taken along with fine.
Udiapol Bus Stand to install Display Screens & Speakers

By UdaipurTimes Team on May 15, 2015
Quote:


On the lines of railways, the Roadways bus stand will now boast of information display and speaker to announce the arrival and departure of long-distance buses. For this, installation work of the system has commenced at the bus stand at Udiapol.

For the passengers, advertisements will also be displayed on 3 LCD screens at the bus stand. Chief Manager Rajendra Upadhyay informed that with this, the passengers will not have to stand in long queues for information. This arrangement will be established at all divisional headquarters.

The long distance buses will be linked with the GPS which would ascertain their location and provide information to the passengers at the bus stand.
Light & Sound and Laser Show expected to start at 3 city spots

By UdaipurTimes Team on May 15, 2015
Quote:


Saheliyon ki Badi, Fateh Sagar Paal and Rajiv Gandhi Park will soon have Light & Sound and Laser show in their premises. UIT has asked for proposals from concerned companies till 15th June.

Secretary Ramniwas Mehta informed that this proposal will be implemented on the turn-key aspect where the government or the UIT will not have to invest; rather it will be a concern of the related firms or companies. It is to consider that Collector Rohit Gupta had proposed for such amenities at these sites.

Considering that the fountains at Saheliyon ki Badi are quite old; fountains at Vibhuti Park wither don’t function or lack such arrangements. Also, the condition is somewhat similar at Rajiv Gandhi as well.
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old June 6th, 2015, 06:15 PM   #65
dertyuiop
Registered User
 
Join Date: Jun 2015
Posts: 1
Likes (Received): 0

IIM Udaipur

Can somebody post about the details of upcoming educational campus of IIM Udaipur at Balicha, rajasthan such as detailed project report, tender document, or any other such details which shall give the idea about scope of contractor?
dertyuiop no está en línea   Reply With Quote
Old October 21st, 2017, 04:08 PM   #66
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Rs 300cr sewage treatment plan for Udaipur city

The Times of India
Quote:
Jaipur: Better late than never. Udaipur, the city of lakes, is all set to rapidly transform its waste management system and clean its water bodies of urban sewage.

An integrated Rs 300-crore sewerage treatment plan for the entire city has been prepared under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) programme. The project plans to treat the sewage flowing into Ahar or Ayad river, also known as the neglected Ganga of Rajasthan.

"Ayad river of Udaipur has turned into a sewage drain and needs to be revived. The state-level technical committee (SLTC) had sanctioned Rs 304 crore for sewage treatment in the city. Presently, there are 139 drains that carry city sewage to the river. Four agencies have been engaged for the treatment project which is scheduled to be completed before the monsoon of 2019," said Dr Manjit Singh, principal secretary, local self-government, and state mission director, Smart City Mission & AMRUT.

According to officials, the municipal corporation prepared the integrated DPR of the sewerage plant for Udaipur city and the same has been approved under the AMRUT mission by SLTC.

Two proposals were prepared for the river which is the lifeline of the tourist city. While the first proposal seeks to carry sewage from all drains along the Ayad river through covered conduit to a STP, the second plan is to construct a decentralized sewerage treatment system near the river to treat effluents throughout the year.

In Phase I, the area close to the lakes would be covered at an estimated cost of Rs 5.75 crore. "Work on the lifting station at Naganagari and Lalghat has been completed and work is in progress at Maharaj Ghat, Nathi Ghat, Sisarama and Pipli Ghat. In Phase II, a decentralized 40MLD STP, based on the hybrid annuity model, would be set up at a cost of Rs 304 crore. Udaipur Smart City Ltd (USCL) has issued the work order for the sewerage plant and the project is in progress. So far, over 4km sewer lines have been laid," said Sidharth Sihag, CEO, Udaipur Municipal Corporation (UMC).

Besides these government projects, Hindustan Zinc Ltd is constructing three STPs—a 5MLD plant near Kazrali House, 10MLD near FCI godown and 25MLD STP at Eklingpura. "At present, the sewerage plant covers 20.3% of the Udaipur city. But after the completion of the above projects, the coverage will be 62.5%. While the current sewage discharge of the city is 57MLD, the sewage treatment capacity of all the plants on completion would be more than the discharge," said Dr Manjit.

Rachna Singh | TNN | Oct 13, 2017, 00:09 IST
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old October 24th, 2017, 02:32 PM   #67
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Fateh Sagar fish aquarium inaugurated

Hi-tech virtual fish aquarium inaugurated at Udaipur

Fish aquarium entry fees disappoints everyone
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old October 25th, 2017, 12:52 PM   #68
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Ayad river ganda nala cleaning & restoration Phase-2

See chotu pics in the articles

उदयपुर में गृहमंत्री के ड्रीम प्रोजेक्ट आयड़ नदी प्रोजेक्ट का दूसरा चरण शुरू

News 18 Hindi
Quote:
आयड़ नदी के विकास को लेकर पहले चरण के पूरे होने के बाद मंगलवार से दूसरे चरण की शुरूआत हुई.

उदयपुर में गृहमंत्री गुलाबचन्द कटारिया के ड्रीम प्रोजेक्ट माने जाने वाले आयड़ नदी के विकास को लेकर पहले चरण के पूरे होने के बाद मंगलवार से दूसरे चरण की शुरूआत हुई.

दूसरे चरण में आयड नदी के विभिन्न इलाको में तय किए भामाशाहों की ओर से नदी मे पडे हुए मलबे को हटाया जाएगा. शहर के पुलां इलाके से करीब 5 किमी तक 40 संस्थाओं की ओर से दो दर्जन से अधिक जेसीबी और डम्पर की मदद से मलबे को चित्रकुटनगर स्थित डम्पिंग यार्ड में डाला जाएगा.

गृहमंत्री कटारिया के आह्वान पर किसी संस्था की ओर से 200 मीटर, तो किसी संस्था द्वारा 400 मीटर तक मलबे को इकट्टा करने और यहां से हटाने का जिम्मा लिया गया है. ये सभी संस्थान 31 अक्टूबर तक सफाई करवाएंगे, उसके बाद बचे हुए हिस्सों को नगर निगम और यूआईटी द्वारा हटवाया जाएगा.

युआईटी के चैयरमैन रवीन्द्र श्रीमाली भी आयड़ नदी के विभिन्न इलाकों में चल रहे सफाई कार्यों का निरीक्षण करने मौके पर पहुंच रहे हैं. (रिपोर्ट- सतीश)


ETV Rajasthan | Updated: October 24, 2017, 5:01 PM IST
अब तक 32 को दिए नोटिस, 4 जगह से हटाया अतिक्रमण, 44 लोगों को करेंगे स्थानांतरित

Dainik Bhaskar

Quote:
अब आयड़ से 40 संस्थान मिलकर हटाएंगे मलबा उदयपुर | आयड़नदी को पूरी तरह से सौंदर्य की मिसाल बनाने के लिए सफाई के...

उदयपुर | आयड़नदी को पूरी तरह से सौंदर्य की मिसाल बनाने के लिए सफाई के साथ-साथ निगम और यूआईटी का नदी में अतिक्रमण का काम भी तेजी से चल रहा है। नवर| पुलिया से सीपीएस तक यूआईटी तो सीपीएस से सेवाश्रम पुलिया तक नगर निगम अतिक्रमण चििह्नत कर रही है। इसी के तहत अबतक 32 लोगों को अतिक्रमण हटाने के लिए नोटिस दिए जा चुके हैं। इसमें 18 लोगों को आयड़ से सीपीएस और 14 लोगों को आयड़ से सेवाश्रम पुलिया तक क्षेत्र में अतिक्रमण हटाने के लिए नोटिस दिए गए हैं। निगम ने इसके अतिरिक्त 44 जरूरतमंद लोगों को भी नोटिस दिया है जो आयड़ क्षेत्र में रह रहे थे। नगर निगम आयुक्त सिद्धार्थ सिहाग ने बताया कि ये 44 लोग जरूरतमंद हैं ऐसे में इन्हें किसी अन्य जगह पर स्थानांतरित किया जाएगा। इसके लिए प्रयास चल रहे हैं। इसके अतिरिक्त सिहाग ने बताया कि निगम अबतक 4 जगहों पर अतिक्रमण हटा चुकी है। मंगलवार को भी सेवाश्रम क्षेत्र से अतिक्रमण हटाया गया। जबकि इससे पहले ओरिएंटल पैलेस के सामने से दो अतिक्रमण हटाए गए। वहीं 1 अतिक्रमण सीपीएस पुलिया पर से हटाया गया।

आयड़ नदी की दूसरे चरण में आलू फैक्ट्री पुलिया के यहां मलबा हटाया गया

आयड़ को साफ-सुथरा बनाने के अभियान के दूसरे चरण में मंगलवार से नदी से मलबा हटाने का काम शुरू हो गया। लगभग 40 संस्थाओं को नदी से मलबा हटाने के लिए चयनित किया गया। पहले दिन महज 4-5 संस्थाओं ने मलबा हटाने के काम में रूचि दिखाई। नवर| पुलिया से अहिंसापुरी के बीच से मलबा हटाने का काम शुरू हुआ है। सभी संस्थान 30 अक्टूबर तक मलबा निकालकर खेलगांव के पीछे मार्बल स्लरी डम्पिंग यार्ड में डाल देंगे। मंगलवार को नवर| पुलिया, अहिंसापुरी, कृष्णपुरा के पास, सीपीएस पुलिया के पास, आयड़ स्कूल के पास और पीपल वाले बाबा की मजार के पास से मलबा हटाया गया। बुधवार से अन्य संस्थान भी जुटेंगे। 40 में से 28 संस्थानों ने मलबा हटाने की सहमति दी है। लगभग 12 संस्थानों के क्षेत्र आवंटन को लेकर चर्चा की जा रही है। निगम एसई अरुण व्यास ने बताया कि अगले एक-दो दिनों में सभी संस्थाएं काम शुरू कर देंगी। गौरतलब है कि नवर| कॉॅम्प्लेक्स से लेकर सेवाश्रम पुलिया तक लगभग 4800 मीटर क्षेत्र से नदी का मलबा हटाया जाना है। अगले चरण में लोगों को आयड़ सफाई अभियान से जोड़कर निश्चित दिन तय कर 2 से 3 हजार लोगों से श्रमदान कराने की योजना है। शहरवासियों का रोड मार्च कराकर उन्हें आयड़ नदी को करीब से दिखाकर इसे साफ-सुथरा रखने के लिए प्रेरित करने का सरकारी उद्देश्य है।

Bhaskar News Network | Last Modified - Oct 25, 2017, 07:45 AM IST
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old October 27th, 2017, 01:17 PM   #69
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

2 over-bridges planned as part of Udaipur-Himmatnagar-Ahmedabad railway track doubling. Don't know if these have been started construction/tender process

Both are near Hiran Magri

1->railway gate connecting Hiran Magri Sector 6 situated between Jadaav Nursery Main road to VIP colony

2->gate of VIP colony at sector 7
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr

Last edited by World8115; October 27th, 2017 at 01:28 PM.
World8115 no está en línea   Reply With Quote
Old October 30th, 2017, 05:38 PM   #70
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Elevated road project needs two years for completion

Udaipur Times - By Monika S on October 30, 2017
Quote:
Elevated road project, the dream project for city traffic is expected to take its final form in another 2 years. Traffic in the city needs to be taken care of. For the betterment of traffic, the project of elevated roads that was stuck for 10 long years will get a final touch in next two years.

Obstructions on the path of this dream project have been taken care of. Tender process has begun under National Highway Board which will take 6 months to complete. Elevated road project will begin after tender process and will complete in the next one and a half year. The estimated budget is around 300 crore rupees for elevated road project. National Highway Board will acquire the lands of Waqf board, LIC and RNT medical College for this purpose with the assistance of administration.

NHAI have completed the formalities for the construction of elevated road from Udiapole to Court Circle. Approximate length of the road is 1 km 600 m. Route survey, rock testing, soil testing, map, design etc.formalities have been done for the elevated road and sent to Delhi office of NHAI Board. It will 6 months to sign contract with the construction company. The construction company will be assigned 18 months to complete the project. It is expected that by December 2019, the elevated road will be ready for transportation.

Lands under acquisition are basically from the government quota. Governments agencies need to tie up with each other to complete the formalities of acquisitions.

The proposal for elevated roads had begun in 2007. Until 2014 it could not be decided whether elevated roads would be feasible or not. In the meanwhile, the elevated road project faced an opposition from the businessmen in the market area. The opposition stands as is even today.

UCCI President along with other businessmen from the proposed area for the elevated road wrote several letters protesting the elevation. As per their statement, the elevated road will prove to be a hindrance in their business.

Reports also say that traffic condition will improve due to elevated roads. During construction people might be forced to face traffic issues. After completion the elevated road will prove to be beneficial for the growing traffic in the city for years to come.
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old November 7th, 2017, 06:05 PM   #71
World8115
Registered User
 
Join Date: Oct 2010
Posts: 10,033

Ajmer division fast tracks Safety works

Udaipur Kiran
Quote:
Udaipur : The Debari railway tunnel at the entry to the City of Lake Udaipur bears testimony to both history and heritage. Debari tunnel 590 m of 2005 vintage had 13m rails with 130 welds inside the tunnel making it vulnerable to Rail fracture inside the tunnel. The 1889-built tunnel, located at Debari, is the longest railway tunnel in the state.

By meticulous planning, replacement done by 6 panels of 260 m each inside tunnel which is in an S curve. Now only 4 welds remain inside the tunnel. This will immensely help in improving Safety of tracks inside the tunnel, said Puneet Chawla DRM Ajmer.

We are also replacing over aged tracks at a fast pace.50 kms of track is targeted for replacement this financial year. This work is currently in progress in Abu Road-Palanpur section, he added. Apart from this there are 15 level crossing gates which will be closed by providing RUBs and 4 will be eliminated by manning. Other 24 unmanned level crossing gates have Home Guards called Gate Mitras to stop road vehicles when train is approaching the gates. These gates will also be eliminated by September 2018.
__________________
F______L______I______C______K______R

Hyderabad Metro Rail (HMR) Latest videos - Youtube | Flickr
World8115 no está en línea   Reply With Quote
Old July 10th, 2019, 02:29 PM   #72
omshivproperties
Registered User
 
Join Date: Jun 2019
Posts: 2
Likes (Received): 0

Property in Alwar

Om Shiv Properties is a highly acknowledge real estate agency in Alwar with a wide range of Residential & Commercial affordable Property in Alwar according to your needs and locality.Contact us https://www.omshivproperties.com/sign-in/
omshivproperties no está en línea   Reply With Quote
Old July 10th, 2019, 02:30 PM   #73
omshivproperties
Registered User
 
Join Date: Jun 2019
Posts: 2
Likes (Received): 0

Om Shiv Properties is a highly acknowledge real estate agency in Alwar with a wide range of Residential & Commercial affordable Property in Alwar according to your needs and locality. Contact us https://www.omshivproperties.com/sign-in/
omshivproperties no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:55 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us