Old April 8th, 2019, 05:15 PM   #2421
agang
Registered User
 
Join Date: Mar 2019
Posts: 58
Likes (Received): 14

Quote:
Originally Posted by Bmrprojects View Post
There is a huge excavation of the hills and road construction work that is happening near My Home Bhooja. A road is being laid from behind the biodiversity park to connect to the Old Mumbai highway. Can anyone share the master plan to have an idea as to where exactly this road is connecting the highway?
Initially it was planned to connect road behind Bhooja to old mumbai highway as shown in this video (at time 5:40)

https://www.youtube.com/watch?v=kVbTJ6CeJlI

but this plan doesnt have that. so i thought they arent connecting. (page 11)
https://tsiic.telangana.gov.in/wp-co...02/39_2017.pdf

can you send pics of the work. the video seems more recent than the pdf. so maybe they are connecting it.
__________________

tharun232 liked this post

Last edited by agang; April 8th, 2019 at 05:21 PM.
agang no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old April 15th, 2019, 07:52 AM   #2422
Skamma
Registered User
 
Join Date: Mar 2018
Posts: 3
Likes (Received): 3

బేగంపేట విమానాశ్రయం కింద.. సొరంగ మార్గం!
తాడ్*బండ్* వరకు కొత్తగా రోడ్డు నిర్మాణం
ఈనాడు, హైదరాబాద్*

Last edited by Skamma; April 15th, 2019 at 08:02 AM.
Skamma no está en línea   Reply With Quote
Old April 15th, 2019, 07:55 AM   #2423
Skamma
Registered User
 
Join Date: Mar 2018
Posts: 3
Likes (Received): 3

http://www.eenadu.net/archivespage/d...9/d/14-04-2019

NEW ROADS/ROUTES ARE PLANNED FOR DEVELOPMENT IN HYDERABAD

The tunnel route is coming up at Begumpet Airport. The GHMC has begun working on the road to reduce the distance between Begumpeta-Tadbund. A private agency has recently studied and made proposals for Baltia. The tunnel starts at Begumpet Airport Gate. Going out of the runway and ending at the edge of the campus.


Proposed tunnel length 1.1 km From there it is 1.5 km away from Tadbund Road to the airport. A wide road is constructed. If the path is available, people travelling from Tadbund, Cantonment, Tirumalgiri and other areas can get relief. About 5 km Travel distance will be reduced. Traffic jams can be avoided at crosses. The proposal has been developed as part of a project to be made available for new roadways across the city.


The GHMC also revealed that the study organization has proposed to construct 8 more roadways.
__________________

Last edited by Skamma; April 15th, 2019 at 08:13 AM.
Skamma no está en línea   Reply With Quote
Old April 15th, 2019, 12:14 PM   #2424
Sandy4005
❤️ Hyd..‼
 
Sandy4005's Avatar
 
Join Date: Feb 2017
Location: Hyderabad
Posts: 283
Likes (Received): 645

New corridors to ease traffic congestion in city


A surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun to be taken up

The Greater Hyderabad Municipal Corporation (GHMC) is set to embark on the task of developing new roads on some identified stretches to reduce pressure on the existing roads in the city.

A majority of these roads have been planned in the Serilingampally and Kukatpally zones, which have become traffic nightmares following rapid development over the past couple of decades.

The civic body has identified seven new corridors — Narsingi to Ramachandrapuram; Infotech junction to Madhapur main road; Nacharam junction to Lalapet; Necklace Road to Begumpet; Begumpet airport to Tadbun; Banjara Hills to Kukatpally; and Madhapur to Kaitalapur.

On majority of these stretches, roads already exist to certain extent and the GHMC is planning to cover the remaining stretches to develop the routes as new corridors.

The roads envisaged to be laid add up to a total of 42.4 km, an official informed. The longest stretch among these would be between Narsingi and Tellapur, which would be part of the corridor to be developed between Shaikpet and Ramachandrapuram. “Two road stretches already exist between Shaikpet and Narsingi, and between Tellapur and Ramachandrapuarm respectively. All we have to do is to connect Narsingi with Tellapur so that a full-fledged corridor is available for road users,” said the official.

The distance between Narsingi and Ramachandrapuram is calculated to be 22.3 km, of which 7-8 km is available. Another important stretch is being planned between Begumpet MMTS railway station and Necklace Road, along the railway line. The two-kilometre corridor is to be laid in entirety, to ease the traffic on the Raj Bhavan-Somajiguda road.

The Infotech junction exists before Mindspace junction at Madhapur, from where another corridor of 1.1 km is being planned up to Madhapur main road. Of this, a 600-metre piece is missing, and would be laid anew, said the official.

Of the 1.3-km stretch between Nacharam junction to Lalapet, 800-metre road exists and 500 metre road is to be laid.

On the corridor between Road No.2, Banjara Hills up to IDL Lake Junction, Kukatpally, already road exists in bits and pieces, and the new stretch of 2.5 km is being planned between Borabanda and Kaitalapur. The total corridor is of 8.2 km length.

On the road of 3.3 km between Madhapur and Kaitalapur, only 200 metre bit is missing, which needs to be developed. Also, a road-over-bridge needs to be constructed across the railway track as part of the project.

Another proposal for a surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun would be taken up subject to clearance by the Airports Authority of India (AAI), officials informed.

More roads would be taken up as suggested by the comprehensive traffic study conducted by LEE Associates jointly with the traffic police, as short-term measures to address traffic issues. They include development of 109 km intermediate ring road between Outer and Inner Ring Roads, and radial roads of 128 km, for which the proposals are still on the drawing board, the officials said.

-The Hindu
__________________
❤️ Hyderabad..‼
Sandy4005 no está en línea   Reply With Quote
Old April 15th, 2019, 06:46 PM   #2425
evo123
Registered User
 
Join Date: Feb 2016
Posts: 429
Likes (Received): 117

Quote:
Originally Posted by Sandy4005 View Post
New corridors to ease traffic congestion in city


A surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun to be taken up

The Greater Hyderabad Municipal Corporation (GHMC) is set to embark on the task of developing new roads on some identified stretches to reduce pressure on the existing roads in the city.

A majority of these roads have been planned in the Serilingampally and Kukatpally zones, which have become traffic nightmares following rapid development over the past couple of decades.

The civic body has identified seven new corridors — Narsingi to Ramachandrapuram; Infotech junction to Madhapur main road; Nacharam junction to Lalapet; Necklace Road to Begumpet; Begumpet airport to Tadbun; Banjara Hills to Kukatpally; and Madhapur to Kaitalapur.

On majority of these stretches, roads already exist to certain extent and the GHMC is planning to cover the remaining stretches to develop the routes as new corridors.

The roads envisaged to be laid add up to a total of 42.4 km, an official informed. The longest stretch among these would be between Narsingi and Tellapur, which would be part of the corridor to be developed between Shaikpet and Ramachandrapuram. “Two road stretches already exist between Shaikpet and Narsingi, and between Tellapur and Ramachandrapuarm respectively. All we have to do is to connect Narsingi with Tellapur so that a full-fledged corridor is available for road users,” said the official.

The distance between Narsingi and Ramachandrapuram is calculated to be 22.3 km, of which 7-8 km is available. Another important stretch is being planned between Begumpet MMTS railway station and Necklace Road, along the railway line. The two-kilometre corridor is to be laid in entirety, to ease the traffic on the Raj Bhavan-Somajiguda road.

The Infotech junction exists before Mindspace junction at Madhapur, from where another corridor of 1.1 km is being planned up to Madhapur main road. Of this, a 600-metre piece is missing, and would be laid anew, said the official.

Of the 1.3-km stretch between Nacharam junction to Lalapet, 800-metre road exists and 500 metre road is to be laid.

On the corridor between Road No.2, Banjara Hills up to IDL Lake Junction, Kukatpally, already road exists in bits and pieces, and the new stretch of 2.5 km is being planned between Borabanda and Kaitalapur. The total corridor is of 8.2 km length.

On the road of 3.3 km between Madhapur and Kaitalapur, only 200 metre bit is missing, which needs to be developed. Also, a road-over-bridge needs to be constructed across the railway track as part of the project.

Another proposal for a surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun would be taken up subject to clearance by the Airports Authority of India (AAI), officials informed.

More roads would be taken up as suggested by the comprehensive traffic study conducted by LEE Associates jointly with the traffic police, as short-term measures to address traffic issues. They include development of 109 km intermediate ring road between Outer and Inner Ring Roads, and radial roads of 128 km, for which the proposals are still on the drawing board, the officials said.

-The Hindu
I believe the airport to tadbund road is primarily aimed to detour traffic from the proposed assembly and secretariat at Bison polo grounds?
evo123 no está en línea   Reply With Quote
Old April 16th, 2019, 02:37 AM   #2426
cvrohit
Capt. Rohit
 
cvrohit's Avatar
 
Join Date: Nov 2012
Location: Hyderabad
Posts: 80
Likes (Received): 115

Quote:
Originally Posted by Sandy4005 View Post
New corridors to ease traffic congestion in city


A surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun to be taken up

The Greater Hyderabad Municipal Corporation (GHMC) is set to embark on the task of developing new roads on some identified stretches to reduce pressure on the existing roads in the city.

A majority of these roads have been planned in the Serilingampally and Kukatpally zones, which have become traffic nightmares following rapid development over the past couple of decades.

The civic body has identified seven new corridors — Narsingi to Ramachandrapuram; Infotech junction to Madhapur main road; Nacharam junction to Lalapet; Necklace Road to Begumpet; Begumpet airport to Tadbun; Banjara Hills to Kukatpally; and Madhapur to Kaitalapur.

On majority of these stretches, roads already exist to certain extent and the GHMC is planning to cover the remaining stretches to develop the routes as new corridors.

The roads envisaged to be laid add up to a total of 42.4 km, an official informed. The longest stretch among these would be between Narsingi and Tellapur, which would be part of the corridor to be developed between Shaikpet and Ramachandrapuram. “Two road stretches already exist between Shaikpet and Narsingi, and between Tellapur and Ramachandrapuarm respectively. All we have to do is to connect Narsingi with Tellapur so that a full-fledged corridor is available for road users,” said the official.

The distance between Narsingi and Ramachandrapuram is calculated to be 22.3 km, of which 7-8 km is available. Another important stretch is being planned between Begumpet MMTS railway station and Necklace Road, along the railway line. The two-kilometre corridor is to be laid in entirety, to ease the traffic on the Raj Bhavan-Somajiguda road.

The Infotech junction exists before Mindspace junction at Madhapur, from where another corridor of 1.1 km is being planned up to Madhapur main road. Of this, a 600-metre piece is missing, and would be laid anew, said the official.

Of the 1.3-km stretch between Nacharam junction to Lalapet, 800-metre road exists and 500 metre road is to be laid.

On the corridor between Road No.2, Banjara Hills up to IDL Lake Junction, Kukatpally, already road exists in bits and pieces, and the new stretch of 2.5 km is being planned between Borabanda and Kaitalapur. The total corridor is of 8.2 km length.

On the road of 3.3 km between Madhapur and Kaitalapur, only 200 metre bit is missing, which needs to be developed. Also, a road-over-bridge needs to be constructed across the railway track as part of the project.

Another proposal for a surface-cum-tunnel road of 2.5 km between Begumpet Airport and Tadbun would be taken up subject to clearance by the Airports Authority of India (AAI), officials informed.

More roads would be taken up as suggested by the comprehensive traffic study conducted by LEE Associates jointly with the traffic police, as short-term measures to address traffic issues. They include development of 109 km intermediate ring road between Outer and Inner Ring Roads, and radial roads of 128 km, for which the proposals are still on the drawing board, the officials said.

-The Hindu

Image from Eenadu
cvrohit no está en línea   Reply With Quote
Old April 17th, 2019, 05:23 PM   #2427
raghussc
Registered User
 
Join Date: Oct 2007
Posts: 3,444
Likes (Received): 1465

JNTU to Malaysian Township .. silently inaugurated by GHMC owing to poll code .. no fanfare opening .. good job Hyd !

__________________
-----------------------------------------------------

agang, Sandy4005, vin_hyd liked this post
raghussc no está en línea   Reply With Quote
Old April 22nd, 2019, 10:30 AM   #2428
indian21r
Registered User
 
Join Date: Apr 2011
Posts: 30
Likes (Received): 13

Today I observed that we have flyovers (Completed / Under Construction) approximately every Km from JNTU to Bio Diversity Junction. Same case from Secunderabad to Banjara hills. I have a question here.

Did the flyovers really aid the traffic or did they just change the choke points?

I feel the way flyovers merge with the existing roads is not scientific which is causing jams at the entry/exit. We always seem to have this concept of multiple lanes merging into 2 or 3 lanes in a very small distance. What is the solution for the choke points?
indian21r no está en línea   Reply With Quote
Old April 23rd, 2019, 03:22 PM   #2429
Sandy4005
❤️ Hyd..‼
 
Sandy4005's Avatar
 
Join Date: Feb 2017
Location: Hyderabad
Posts: 283
Likes (Received): 645

Bio Diversity Flyover

seen from The SkyView..
__________________
❤️ Hyderabad..‼
Sandy4005 no está en línea   Reply With Quote
Old April 23rd, 2019, 06:57 PM   #2430
great india
Jana Gana Mana
 
great india's Avatar
 
Join Date: Feb 2009
Location: Portland,OR; Hyderabad.
Posts: 363
Likes (Received): 55

What's U/C on the other side of the flyover?
great india no está en línea   Reply With Quote
Old April 24th, 2019, 05:46 AM   #2431
HydSkyScraper
Registered User
 
Join Date: May 2011
Posts: 98
Likes (Received): 36

Quote:
Originally Posted by great india View Post
What's U/C on the other side of the flyover?
That's "DSR First" - Residential Community.
HydSkyScraper no está en línea   Reply With Quote
Old April 24th, 2019, 08:22 PM   #2432
agang
Registered User
 
Join Date: Mar 2019
Posts: 58
Likes (Received): 14

Quote:
Originally Posted by HydSkyScraper View Post
That's "DSR First" - Residential Community.
Does anyone know whats coming up to the left on that
agang no está en línea   Reply With Quote
Old April 24th, 2019, 09:06 PM   #2433
saikumar118
Registered User
 
Join Date: May 2015
Posts: 205
Likes (Received): 88

Quote:
Originally Posted by agang View Post
Does anyone know whats coming up to the left on that
I think Shahgouse should come up with a 15 floor restaurant building to cater to the needs of the public here. The current one is too small and causing inconvenience to the general public - Sarcastic comment!
__________________

sunilkumar1729, Sandy4005 liked this post
saikumar118 no está en línea   Reply With Quote
Old April 25th, 2019, 05:26 AM   #2434
HydSkyScraper
Registered User
 
Join Date: May 2011
Posts: 98
Likes (Received): 36

Quote:
Originally Posted by agang View Post
Does anyone know whats coming up to the left on that
Office space/IT Park is coming up next to it.
HydSkyScraper no está en línea   Reply With Quote
Old April 25th, 2019, 05:35 AM   #2435
HydSkyScraper
Registered User
 
Join Date: May 2011
Posts: 98
Likes (Received): 36

Quote:
Originally Posted by saikumar118 View Post
I think Shahgouse should come up with a 15 floor restaurant building to cater to the needs of the public here. The current one is too small and causing inconvenience to the general public - Sarcastic comment!
The inconvenience they are causing to the public on this road, is absolutely true. And I always see dedicated traffic police with a towing van for Shahgouse customers .
So probably they need to think on those lines, at least for the public & their customer's sake.
HydSkyScraper no está en línea   Reply With Quote
Old April 25th, 2019, 06:44 AM   #2436
vikranthsanka
Registered User
 
Join Date: Jan 2018
Posts: 57
Likes (Received): 24

Quote:
Originally Posted by HydSkyScraper View Post
The inconvenience they are causing to the public on this road, is absolutely true. And I always see dedicated traffic police with a towing van for Shahgouse customers .
So probably they need to think on those lines, at least for the public & their customer's sake.

Haleem season's gonna start in couple of weeks.. there will be huge traffic mess around shah ghouse area
__________________

great india liked this post
vikranthsanka no está en línea   Reply With Quote
Old April 26th, 2019, 04:51 PM   #2437
Sandy4005
❤️ Hyd..‼
 
Sandy4005's Avatar
 
Join Date: Feb 2017
Location: Hyderabad
Posts: 283
Likes (Received): 645

Hyderabad: SRDP-1 to be completed by year-end

GHMC to release Rs 600 crore required for various works


Hyderabad: Indicating that there is no dearth of funds for the development of city infrastructure, the Greater Hyderabad Municipal Corporation (GHMC) on Thursday reiterated its commitment to complete projects planned under Strategic Road Development Programme (SRDP) phase I by the year-end.

To this effect, Rs 600 crore required to complete the works pertaining to different structures under phase I will be released, said GHMC Commissioner M Dana Kishore.

During a review meeting here on Thursday, the GHMC Commissioner said the civic body had arranged for Rs 3,000 crore under Rupee term loan and these funds would be credited into the GHMC accounts soon after the election code is lifted.

“All the ongoing works pertaining to underpass, flyovers and other structures should be completed by December this year,” he instructed the officials.

Directions were issued to them to set targets for completion of each project and execute the works accordingly. Land acquisition, which is a major challenge for executing SRDP works, should be completed on a war footing, he said.

The officials were asked to conduct special awareness programmes on the benefits of Transferable Development Rights (TDR) to facilitate building and land owners part with their land without any apprehensions.

Amberpet flyover land acquisition works are at an advanced stage. Nearly 280 properties need to be acquired for the construction of 1.60 km flyover at Amberpet of which, 171 building owners have agreed to part with their properties and 175 cheques have also been issued. Already, 129 structures have been demolished, officials said.



Execution gains pace

GHMC is taking up a series of projects in different areas of the city under SRDP and aims to complete them by this year-end.

The State government has launched SRDP as a means to minimise travel time, increase average journey speed and reduce air pollution levels in the city.

Since 2018, seven projects, including three underpasses and four flyovers, have been completed and are operational. Of these, five were launched in 2018 and two early this year.

Similarly, the municipal corporation is taking up projects such as LB Nagar underpass, Biodiversity flyover, Bahadurpura flyover, cable stay bridge at Durgam Cheruvu, and an elevated corridor from OU Colony and Shaikpet to Road No.45, Jubilee Hills.

All these works are being taken up at a brisk pace. The GHMC officials said LB Nagar underpass, Bairamalguda flyover, cable stay bridge and Kamineni RHS flyover would be completed this year.

- Telangana Today
__________________
❤️ Hyderabad..‼

-Krish-, Achu02 liked this post
Sandy4005 no está en línea   Reply With Quote
Old April 26th, 2019, 07:07 PM   #2438
-Krish-
Registered User
 
Join Date: Apr 2013
Location: Hyderabad
Posts: 19
Likes (Received): 14

Quote:
Originally Posted by Sandy4005 View Post
Hyderabad: SRDP-1 to be completed by year-end

GHMC to release Rs 600 crore required for various works


Hyderabad: Indicating that there is no dearth of funds for the development of city infrastructure, the Greater Hyderabad Municipal Corporation (GHMC) on Thursday reiterated its commitment to complete projects planned under Strategic Road Development Programme (SRDP) phase I by the year-end.

To this effect, Rs 600 crore required to complete the works pertaining to different structures under phase I will be released, said GHMC Commissioner M Dana Kishore.

During a review meeting here on Thursday, the GHMC Commissioner said the civic body had arranged for Rs 3,000 crore under Rupee term loan and these funds would be credited into the GHMC accounts soon after the election code is lifted.

“All the ongoing works pertaining to underpass, flyovers and other structures should be completed by December this year,” he instructed the officials.

Directions were issued to them to set targets for completion of each project and execute the works accordingly. Land acquisition, which is a major challenge for executing SRDP works, should be completed on a war footing, he said.

The officials were asked to conduct special awareness programmes on the benefits of Transferable Development Rights (TDR) to facilitate building and land owners part with their land without any apprehensions.

Amberpet flyover land acquisition works are at an advanced stage. Nearly 280 properties need to be acquired for the construction of 1.60 km flyover at Amberpet of which, 171 building owners have agreed to part with their properties and 175 cheques have also been issued. Already, 129 structures have been demolished, officials said.



Execution gains pace

GHMC is taking up a series of projects in different areas of the city under SRDP and aims to complete them by this year-end.

The State government has launched SRDP as a means to minimise travel time, increase average journey speed and reduce air pollution levels in the city.

Since 2018, seven projects, including three underpasses and four flyovers, have been completed and are operational. Of these, five were launched in 2018 and two early this year.

Similarly, the municipal corporation is taking up projects such as LB Nagar underpass, Biodiversity flyover, Bahadurpura flyover, cable stay bridge at Durgam Cheruvu, and an elevated corridor from OU Colony and Shaikpet to Road No.45, Jubilee Hills.

All these works are being taken up at a brisk pace. The GHMC officials said LB Nagar underpass, Bairamalguda flyover, cable stay bridge and Kamineni RHS flyover would be completed this year.

- Telangana Today
great news indeed! BTW, what exactly is the elevated corridor from OU Colony and Shaikpet to Road No. 45? never read about it
-Krish- no está en línea   Reply With Quote
Old April 29th, 2019, 06:32 AM   #2439
Sandy4005
❤️ Hyd..‼
 
Sandy4005's Avatar
 
Join Date: Feb 2017
Location: Hyderabad
Posts: 283
Likes (Received): 645

Nagole Flyover works

__________________
❤️ Hyderabad..‼
Sandy4005 no está en línea   Reply With Quote
Old April 29th, 2019, 07:55 AM   #2440
wasu
Registered User
 
Join Date: Jan 2007
Posts: 67
Likes (Received): 62

Quote:
Originally Posted by -Krish- View Post
great news indeed! BTW, what exactly is the elevated corridor from OU Colony and Shaikpet to Road No. 45? never read about it
Old Mumbai road..from Toli Chowki to Dargah Junction..most of the pillars are already up..looks like a 6 lane.
__________________

-Krish- liked this post
wasu no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
hyderabad, orr

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:03 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us