ADDIS ABABA Projects & Construction Thread
--------------------------------------------------------------------------
--------------------------------------------------------------------------
In this thread, projects from all over Addis will be showcased. If you have participated in the East African/West African/Central African/Southern African/Nothern African Development Fact Files in the General Africa section...well, this will work exactly the same way.
I think its a good idea to turn this into a thread solely dedicated to
1.) projects in Addis (these can be roads, buldings, factories, etc.) , as well as such things that affect them, for example
- updated pictures
- their completion status
- funding issues
- construction issues
- change in design or even cancellation
2.) additionally, posting links to projects in Addis that already have threads in this section is a good idea so we can have them access to them all in once place. for example:
link to: ADDIS ABABA | Mexico Square Development Tower | Proposed
I will post most of the links to these projects in the following post and everyone can add on as the thread goes on. After you start a thread for a new project in Addis just come in here and post a link to it so it is easy to find.
- Projects for anyplace outside of Addis can be posted in new threads as usual.
- Projects in Addis can have seperate threads as well as being posted in here.
__
Links to projects in Addis Ababa: Updated: 01/2023
ADDIS ABABA | Commercial Bank of Ethiopia HQ | Office | 42 F | U/C
ADDIS ABABA | Mexico Square Development Tower | Proposed
ADDIS ABABA | Sunshine's Mega Projects | $1.4billion | Proposed
ADDIS ABABA | AU Conference Hall | 99m | $150million | Completed
ADDIS ABABA | Addis Ababa Exhibition Center | Mixed Use | 35 F / 12 F | Proposed
ADDIS ABABA | Goffa Mazzoria Interchange | Br 200million | Completed
KALITY, Addis Ababa | Lifan Motors assembly plant | Operational
ADDIS ABABA | Piazza | Mixed Use | U/C/
MEGENAGNA, Addis Ababa | Revenue, Customs Authority HQ | Completed
ADDIS ABABA | Lideta District Revitalization | U/C
ADDIS ABABA | Referral Hospital | 240 beds | €15million | 4 F x5 | Approved
ADDIS ABABA | Abyssinia Bank Tower | 270m | 60 F | Proposed
ADDIS ABABA | New Hotel / Buildings In Merkato | Completed
ADDIS ABABA | Africa International Trade Centre | Proposal
ADDIS ABABA | PVC Window Frames Factory [China, Ethiopia Joint Venture] | Complete
ADDIS ABABA | Mela Ethiopia SC Hospital | Design Completed
ADDIS ABABA | Radisson Blu Hotel | Completed
ADDIS ABABA | United Nations Economic Commission for Africa (UNECA) expansion | Completed
ADDIS ABABA | 200 apartment buildings? | Cancelled
MEGENAGNA, Addis Ababa | Access Real Estate | U/C
MEXICO SQUARE, Addis Ababa | BH Car Assembly | New plant
ADDIS ABABA | Jemo Condominium Site | Completed
ADDIS ABABA | Africa International Trade Centre | Proposed
ADDIS ABABA | Sheraton Expansion, Sarah Residential Development | U/C
ADDIS ABABA | Hotel & housing from Qatar company | Proposed
ADDIS ABABA - NAZARETH | Six-lane expressway | $612million | Completed
ATKILT TERA, Addis Ababa | Redevelopment | Proposed
BOLE Airport, Addis Ababa | Aviation Fuel Depot | National Oil Company |Completed
ADDIS ABABA | Chuan Hui International Hotel | Hotel | 58 F | Approved
Addis Ababa | Grand Ghion 5 and 4 star hotel | Expansion proposed
ADDIS ABABA | Ethiopian Airlines HQ | Approved
ADDIS ABABA | American Embassy in Ethiopia to be the largest in Africa | Completed
ADDIS ABABA (CBD) | NIB Bank HQ | Land clearance
ADDIS ABEBA | Nani Building | 22 F | Complete
ADDIS ABEBA | National Museum of Natural History | Proposed
ADDIS ABABA | Urban Redevelopment/City Plans Upgrades | Proposal/Planning
ADDIS ABABA | Hyundai Auto Assembly Plant | Proposal/Planning
ADDIS ABABA | Ministry of Foreign Affairs Hq | U/C
ADDIS ABABA | LG TV Assembly Plant | ETB 35 million | Completed
PIAZZA, Addis Ababa | United Insurance HQ | G + 12 | Design chosen
ADDIS ABABA | Hope University College | U/C
ADDIS ABABA | Meskel Square redevelopment | Completed
TEWODROS SQUARE, Addis Ababa | NICE Insurance HQ | 140 million Birr | U/C
BOLE, Addis Ababa | Rosetta Metro Plaza | 16 F | Proposed
ADDIS ABABA | New Federal Parliament Building | Proposed
ADDIS ABABA | Zquala Commercial Center | U/C
ADDIS ABABA | Ayat: Addis' first planned suburb | Phase I Completed
ADDIS ABABA | African Union Grand Hotel | U/C
ADDIS ABABA | The new twin towers of Dembel City Center | Proposed
ADDIS ABABA | Federal Police Comission HQ | 10 F | Completed
ADDIS ABABA | KK Tower | 22 F | U/C
ADDIS ABABA | Africa Capacity Building Institute | U/C
ADDIS ABABA | Tele-Medicine center | Completed
ADDIS ABABA | Lideta Mercato Mall | U/C
ADDIS ABABA | Maritime Transit Services Enterprise HQ | 15 F | U/C
ADDIS ABABA | Future HQ of EEPCO | 34 F | U/C
ADDIS ABABA | Habesha Construction Development | Proposed and U/C
ADDIS ABABA | Wegagen Bank HQ | U/C
ADDIS ABABA | Oya Investment Real Estate Development | 10 F | Proposed
ADDIS ABABA | ETG Designers & Consultants Real Estate Dev. | Proposed
ADDIS ABABA | Information Network Security Agency (INSA) HQ | 13-17 F | Completed
ADDIS ABABA | Greenview Real Estate Dev. | Proposed
BOLE, Addis Ababa | Bole Metro Place | 12 F | U/C
ADDIS ABABA | ORDA HQ | 20 F | Proposed
ADDIS ABABA | ACME engineering & Sisay Shimelese buildings | 8 F&10 F | U/C
ADDIS ABABA | 4-Star Hotel | 10 F | Planned
ADDIS ABABA | Joy Real Estate & GetAs Real Estate Apartments | Proposed
ADDIS ABABA | Grand Lewis Hotel | Proposed
BOLE, Addis Ababa | ALEX Building | 10 F | Completed
BOLE, Addis Ababa | City Plaza | 10 F | Completed
ARAT KILO & WOLLO SEFER, Addis Ababa | Redevelopment | Proposed
MEKANISA, Addis Ababa | YOTEK Real Estate | Proposed
ADDIS ABABA | Noah Samara Hotel | 10 F | Proposed
ADDIS ABABA | Building, Conference Center, and School (Noah Samara) | Proposed
ADDIS ABABA | Midroc City Center Development | U/C
ADDIS ABABA | Millennium Hotel | 12F | Proposed
ADDIS ABABA | Millennium Hall | Renovation | Proposed
ADDIS ABABA | Fisseha Abay Hotel |U/C
ADDIS ABABA | Yemreha Spa, DOS Architects | U/C
ADDIS ABABA | AAWSA Sibilu and Gerbi Dams | 8Billion birr |under study and construction to begin
ADDIS ABABA | Zemen Bank HQ 30-storey | Planned
ADDIS ABABA | Nile Insurance Company HQ | 22 Storey | U/C
ADDIS ABABA, HAWASSA | Awash Bank Branches | Designs Completed
ADDIS ABABA | Hyatt (formerly Novotel & Ibis) | U/C
ADDIS ABABA | Addis Ababa Light Rail Project | U/C
ADDIS ABABA | Addis Ababa Bole Road project | Completed
ADDIS ABABA | Zefmesh Mall | Proposal
ADDIS ABABA | Access Resort hotel (Old Imperial hotel upgrade) | Planning
ADDIS ABABA | Tracon Building | Completed
PIAZZA, Addis Ababa | Country Tower Electronics Mall | 6F | Completed
ADDIS ABABA (CMC) | Theme Park & Recreation | Proposed
PIAZZA, Addis Ababa | Asham Business Plc. | Completed
ADDIS ABABA | AU Peace & Security building | U/C
ADDIS ABABA | TDA Office | 11 F | U/C
ADDIS ABABA | Ethiopian Airlines Grand Skylight Hotel (+ Expansion) | U/C
ADDIS ABABA | Marriott Executive Apartments & Courtyard by Marriott | Completed
ADDIS ABABA | IT park project | U/C
ADDIS ABABA | Stadium | Approved
KIRKOS, Addis Abeba | MULU Promise Plaza & Village| Tech Park | U/C
ADDIS ABABA | United Bank HQ | 30 F | Approved
ADDIS ABABA | Tigat Shopping Center | 10 Floors| Approved
ADDIS ABABA | Meles Zenawi International Centre (fmr. Chuan Hui Hotel) | 448m | 99 floors | Proposal
ADDIS ABABA | Sebastopol Entertainment Cinema | Planned
ADDIS ABABA | ODA Towers | 12 fl | U/C (?)
ADDIS ABABA | Evangelical Theological College | 33m | 10F | Approved
ADDIS ABABA | Capital Hotel and Spa | Completed
ADDIS ABABA | Ethiopian Catholic University of St. Thomas Aquinas | Proposed
PEACOCK PARK, Addis Ababa | Addis Ababa Zoo Project | Proposal
ADDIS ABABA | Kenenisa hotel | Completed
ADDIS ABABA | National Insurance Company HQ | 40 F | Competition
ADDIS ABABA | Samson Hotel | 9 F | 90 Rooms | U/C
ADDIS ABABA | Holiday Inn | 14 F | Proposed
ADDIS ABABA | Best Western Plus Hotel | 160 Rooms | U/C
BOLE, Addis Ababa | Ramada Hotel | 136 Rooms | U/C
Addis Abeba Unpaved roads redevelopment | Ongoing
ADDIS ABABA | Second Generation Housing Development Project | Proposed
ADDIS ABABA | Sanka Multimedia Center | Proposed
CBD, Addis Ababa | Red Cross HQ | 17fl | Approved
LIDETA, Addis Ababa | Crowne Plaza Addis | 11 F | U/C
YEKA, Addis Ababa | Sky View Hotel | U/C
ADDIS ABABA | I HAVE DIED AND GONE TO HEAVEN!! (Jacques' Apartment) | Proposal
ADDIS ABABA | BRT System | Planning
ADDIS ABABA | Ring Road | Partial Completion, U/C
ADDIS ABABA | Sport Academy | U/C
ADDIS ABABA | National Theater Building | Approved
BOLE MEDHANIALEM, Addis Ababa | Saro Maria Hotel | Completed
ADDIS ABABA | Tsehay Real Estate | U/C
ADDIS ABABA | Oromia International Bank Headquarters | Planned
ADDIS ABABA | Ethio Telecom HQ | Proposed
ADDIS ABABA | Human Origin Museum | Approved
ADDIS ABABA | Bole Lemi Industrial Zone | U/C
BOLE, Addis Ababa | Addis Ababa Bole International Airport - Expansion | 25 million pax | Completed
ADDIS ABABA | Commercial Bank of Ethiopia Headquarters | 215m | 48 F | Completed
GOTERA, Addis Ababa | Royal Garden Real Estate | U/C
ADDIS ABABA | National Stadium | Land Clearing
CMC, Addis Ababa | Ethiopian Airlines Employee Housing | U/C
ADDIS ABABA | Buna Building | U/C
ADDIS ABABA | Best Western Noah (Noah Samara) Hotel | 10 F | Proposed
ADDIS ABABA | Cooperative Bank of Oromia| U/C
ADDIS ABABA | Novotel City Centre | 11 F | U/C
AFRICA AVENUE, Addis Ababa | Sheraton Four Points Hotel | 25F | U/C
KAZANCHIS, Addis Ababa | Elilly Hotel | Completed
ADDIS ABABA | Moevenpick Hotel | 13 F | U/C
CMC, Addis Ababa | Addis/Africa International Convention & Exhibition Center | U/C
BOLE, Addis Ababa | Royal Tulip Hotel | G+12 | U/C
ADDIS ABABA | Oromia Insurance Company S.C. | Proposed
CHURCHILL, Addis Ababa | Leghar Hotel by Serdur Group | U/C
PEACOCK PARK, Addis Ababa | Addis Ababa Zoo Project | U/C
PIASSA, Addis Ababa | Adwa Museum | U/C
KAZANCHIS, Addis Ababa | Residential | Crau Real Estate Group | Proposed
AFRICAN UNION, Addis Ababa | Residential| By Crau Real Estate Group | Proposed
ADDIS ABABA | Noah Sky Gate | 14F | T/O
OLD AIRPORT, Addis Ababa | Ethio-China Road|Residential | By Crau Real Estate Group | Proposed
LEGAHAR, Addis Ababa | Noah Real Estate 4 G+36 Office Tower | U/C
KERA, Addis Ababa | Kera Epicenter | High-Density Mixed Used Project | Proposed
LA GARE, Addis Ababa | La Gare Eagle Hills project | U/C
ADDIS ABABA | Ethiopian Standards Agency Training Center | 11k sq.m | U/C
ADDIS ABABA | Sheger River Rehabilitation Project | U/C
LIDETA, Addis Ababa | Lideta Twin Towers|26 Floors | U/C
ADDIS ABABA | Amhara Credit & Saving Institution HQ | 36 Storeys | U/C
ENTOTO, Addis Ababa | Meles Zenawi Memorial Park | U/C
ARAT KILO, Addis Ababa | Abrehot Library | Completed
GOTERA, Addis Ababa | CCCC and AACA JV Housing Project | Proposal
ENTOTO, Addis Ababa | Entoto Park | Completed
MEXICO SQ, Addis Ababa | Awash Bank New HQ | 50 storeys | Proposed
KAZANCHIS,Addis Ababa | Quara Manufacturing plc | 44 and 30 Storey 219 Meter | Planned
MEXICO SQ, Addis Ababa | Debrework Shopping Center | G+32F | U/C
ADDIS ABABA | Transport Programs Management HQ | U/C
ADDIS ABABA | Mesob Tower | 70F | ON HOLD
ARAT KILO | Ethiopia Museum of Art and Science | Completed
ADDIS ABABA | Kegeberew Tower | 115 F | Proposed
NATIONAL PALACE, Addis Ababa | Jubilee Park & Museum Project | U/C
NEFAS-SILK/LAFTO, Addis Ababa | AfricaCDC HQ Building | U/C
PALACE COMPOUND, Addis Ababa | Unity Park | Completed
ARAT KILO | Unity Park Parking and Heritage Center | Completed
*list will be updated periodically