List of new motorway or expressway sections with actual or expected opening dates - SkyscraperCity
 

forums map | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility


Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 14th, 2015, 03:19 PM   #1
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

List of new motorway or expressway sections with actual or expected opening dates

The list should contain all under construction new motorway and expressway sections in Europe which have been opened for traffic since 1st January 2014.
The list is divided into several posts sorted by the English country names. The data is frequently updated.
The modifications are always specified in a new post with a reference to the source. The edit list is a modification summary.


All information without engagement

*** The author gladly takes notes for completion / correction ***
*** Please post regular updates only in the respective country thread of the project. Thank you. ***


History:

Summary of 2014 openings (by date/by country/km per country)
Summary of 2015 openings (by date)
Summary of 2016 openings (by date)
Summary of 2017 openings (by date)
Summary of 2018 openings (by date)

Project lists of countries which have been dropped in 2017

External lists:
- Recent motorway openings
- Motorway opening calender


Definition:

The definition of motorway and expressway status is country-specific. The subsequent definition describes the pre-conditions which must be fulfilled to add new projects:

New motorways and expressways are projects which are currently under construction or have been opened since 1st January 2014.

The pre-conditions to be added to the list are based on the Convention on road traffic done at Vienna on 8th November 1968.

The future road:
- must feature 2 carriageways with each 2 lanes
- must be grade-separated
- should be access-controlled
- does not have U turns to travel in reverse

It doesn't matter if the future road will feature hard shoulders.
A median is not mandatory but there must be a fixed barrier between the carriageways, for instance guard railing.
If a 2nd carriageway is planned but not yet u/c, the project is added if the other pre-conditions - except barrier - are already fulfilled.
Projects which were under construction but are suspended now, are added too, if the completion is still planned by the countries' demand plan.
In addition, roads will be added which will be rededicated to motorway or expressway status of the respective country.
The opening date does not refer to the completion of the works but to the official opening of the road.
Widening projects are not included.


Legend:

<Numbering>: <section from ... to ...> <Length> km (<start of construction> to <estimated opening>/<actual opening>) [optionally: <comment>] - project pagemap

c/w = carriageway, i/c = interchange, AS/AD/AK = interchange (German version)


Collaboration:

The list comprises European countries only and will not be expanded anymore because it didn't work, see here.
Edit December 30th, 2017: The list is currently not comprising all countries of the world which depends on many reasons like incomplete data or different road standards.
If you want to add your country's project list, please post all required and known information within the country's thread. Please refer to the legend for required data.


Please post regular updates only in the respective country thread of the project.

Why? Because I think that any kind of info about projects under construction is a nice info related to the country. I'm quite sure that there are many people reading the thread of their country only. These people usually have most accurate info about the projects of their country and I think they would post updates and corrections when they see that others have already posted anything about these projects, e.g. pics showing the progress et cetera.....
__________________

Last edited by MichiH; January 6th, 2019 at 09:36 AM.
MichiH no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old November 14th, 2015, 03:20 PM   #2
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Table of content

Introduction / History / Definition / Legend / Collaboration

Table of content

Recent openings

Upcoming openings (Expected 2019 openings (January 13th, 2019 version))

Edit list / Modifications 2014

Edit list / Modifications 2015

Edit list / Modifications 2016

Edit list / Modifications 2017

Edit list / Modifications 2018

Edit list / Modifications 2019


Lists sorted by country

Albania
Austria


Belarus
Belgium
Bosnia and Herzegovina


Bulgaria


Croatia
Cyprus


Czechia


Denmark
Estonia


Finland


France


Germany


Greece


Hungary


Iceland
Ireland


Italy


Kosovo


Latvia
Lithuania
Luxembourg


Moldova
Montenegro


The Netherlands


North Macedonia
Norway


Poland


Portugal


Romania


Serbia


Slovakia
Slovenia


Spain


Sweden
Switzerland


Ukraine
United Kingdom


Last edited by MichiH; February 17th, 2019 at 09:17 AM.
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:20 PM   #3
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Recent openings

May 2019:
Poland S17: Trojanow – Ruda 3km (March 2017 to 1st May 2019) [1st c/w] – projectmap
Poland S6: Glewice – Osina 7.1km (December 2016 to 8th May 2019) – projectmap
France D924: Durcet – east of Durcet 2km (? to 17th May 2019) – ? – map
Serbia A1: Grdelica – south of Vladicin han 26.1km (September 2013 to 18th May 2019) – projectmap
Bulgaria A3: Blagoevgrad – Blagoevgrad-South 6.8km (August 2017 to 23rd May 2019) – projectmap
Spain A11: Venta Nueva – La Mallona 6km (2009/10 to 24th May 2019) – ? – map
Spain A54: Lavacolla – Arzua-West 18.5km (? to 24th May 2019) – ? – map
Kosovo R6: Doganaj – Hani i Elezit 18.2km (October 2014 to 29th May 2019) – projectmap

June 2019:
Italy SPV: Thiene (A31) – Breganze-West 5km (November 2011 to 3rd June 2019) – projectmap
Albania A3: south of Berzhite – Mushqeta 5km (April 2011 to 4th June 2019) [2nd c/w] – ? – map
North Macedonia A4: Miladinovci (A1) – Kadrifakovo (A3) 40km (February 2014 to 5th June 2019) – projectmap
Germany A30: AS Gohfeld – east of AS Gohfeld 1.5km (September 2008 to Early June 2019) [2nd c/w] [discontinuation: 1.4km]projectmap
Germany A33: AS Belm (B51) – south of AS Osnabrück-Schinkel 2.2km (February 2015 to 12th June 2019) – projectmap
Germany B51: AS Belm-Icker – AS Belm (A33) 1.5km (February 2015 to 12th June 2019) – projectmap
Poland S17: Skrudki – Kurow-West (S12) 13.2km (December 2016 to 19th June 2019) – projectmap
France N10: south of Touverac – north of Chevanceaux 4.7km (2014 to 20th June 2019) – projectmap
Spain AG46: Cangas – Meira 3.9km (August 2017 to 21st June 2019) [2nd c/w] – ? – map
Czechia D3: Bosilec – Sevetin 8.1km (September 2015 to 24th June 2019) – projectmap

July 2019:
France N70: north of Palinges – south of Palinges 1km (April 2017 to 1st July 2019) [2nd c/w] – ? – map
Poland S51: Olsztyn-Jaroty – Olsztyn-South (DK16) 6.1km (July 2016 to 1st July 2019) – projectmap
Norway E18: Arendal-West – Tvedestrand 22.8km (March 2017 to 2nd July 2019) – projectmap
Poland S17: Garwolin-South – Trojanow 22km (March 2017 to 4th July 2019) – projectmap
Poland S17: Trojanow – Ruda 3km (March 2017 to 4th July 2019) [2nd c/w] – projectmap
Poland S17: Ruda – Ryki-North 4km (March 2017 to 4th July 2019) – projectmap
Italy SS96 Barese: Altamura-South (SS99) – north of Altamura 3.4km (October 2015 to 5th July 2019) [2nd c/w] – ? – map
Italy SS99 Barese: Altamura-South (SS96) – south of Altamura-South 1.0km (October 2015 to 5th July 2019) – ? – map
Serbia A4: Stanicenje – west of Sopot tunnel 1km (June 2013 to 9th July 2019) – projectmap
Serbia A4: north of Sarleh tunnel – south of Sarlah tunnel 1.4km (June 2013 to 9th July 2019) [2nd c/w] – projectmap
Spain A21: Santa Cilia – Jaca-West 9.0km (? to 11th July 2019) – ? – map

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; July 14th, 2019 at 10:29 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old November 14th, 2015, 03:21 PM   #4
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Upcoming openings

July 2019:
Ireland M11: Clough – Enniscorthy-South 27km (October 2015 to 18th July 2019) – projectmap
Spain N-II: Terradelles – Vilafreser (AP7) 3.3km (June 2015 to Mid July 2019) – ? – map
Poland S8: Radziejowice – west of Siestrzen 8.4km (February 2017 to July 2019) – projectmap

Mid 2019:
Croatia D14: Bedekovcina – Zlatar Bistrica 6.5km (2017 to Mid 2019) [1st c/w]– ? – map
Germany B33: Waldsiedlung – AS Reichenau 0.9km (June 2014 to Mid 2019) – projectmap
Spain B24: Vallirana-West – Vallirana-East 2.1km (2005 to Mid 2019) – projectmap
Spain FV2: south of Costa Calma – north of El Salmo 4.4km (? to Mid 2019?) – ? – map

August 2019:
United Kingdom A6: Toome – Randalstown-West 7km (June 2017 to 13th August 2019) [1st c/w] – projectmap
Germany A72: AS Borna-North – AS Rötha 8.5km (July 2013 to August 2019) [direction Chemnitz]projectmap
Greece EO65: Nea Santa – Assiros (A25) 11.4km (2014 to August 2019) – ? – map
Poland A1: Czestochowa-Blachownia – Czestochowa-South 4.7km (July 2016 to August 2019) – projectmap
Poland A1: Czestochowa-South – Wozniki 16.7km (March 2016 to August 2019) – projectmap
Poland A1: Wozniki – Pyrzowice (S1) 15.2km (September 2015 to August 2019) – projectmap
Poland S7: Skomielna Biala – Zabornia (DK47) 5.2km (April 2016 to August 2019) – projectmap
Poland DK47: Zabornia (S7) – Chabowka 0.9km (April 2016 to August 2019) [2nd c/w] – projectmap
Serbia A2: Obrenovac – Ub 26.2km (August 2014 to August 2019) – projectmap
Serbia A2: Ub – Lajkovac 12.5km (Mid 2010 to August 2019) [completed November 2014; to be opened with neighboring section]projectmap
Serbia A2: Lajkovac – Ljig 20km (August 2014 to August 2019) – projectmap
Serbia A2: Ljig – south of Ljig 4.6km (August 2014 to August 2019) – projectmap
Serbia A4: Prosek – Crvena Reka 22.5km (March 2012 to August 2019) [1st c/w] – projectmap
Romania A1: Holdea – Ilia ~21km (2013 to August 2019?) – ? – map
Romania A1: Ilia – Deva/Soimus 22.1km (2013 to August 2019?) – ? – map

Summer 2019:
Albania A2: Mbrostar Ura – Levan 22km (2013 to Summer 2019) [1st c/w] – ? – map
Germany A30: east of AS Gohfeld – AS Bad Oeynhausen-North 3.8km (September 2008 to Summer 2019) [2nd c/w] – projectmap
Hungary M44: Tiszakürt – Kondoros 62km (December 2016 to Summer 2019) – ? – map
Poland S6: north of Ploty-North – Kielpino 14.2km (December 2016 to Summer 2019) – projectmap
Poland S17: Ryki-North – Skrudki 16km (March 2017 to Summer 2019) – projectmap
Poland DW631: Warsaw-Powstancow – Warsaw-Marsa 3.8km (April 2016 to Summer 2019) – projectmap
Poland DW631: Warsaw-Zolnierska – Warsaw-Chelmzynska 0.9km (April 2016 to Summer 2019) [direction Zielonka]projectmap
Poland DW669: Bialystok-Aleja Jana Pawla II – Bialystok-Wiadukt 6.3km (February 2017 to Summer 2019) – projectmap
Spain N124: Arminon (A1) – Zambrana 3km (April 2017 to Summer 2019) – ? – map

September 2019:
Belgium N5: Couvin-South – B/F border (Bruly) 9km (August 2015 to Early September 2019) – projectmap
France A406: west of Macau-Loche – Macau-South 4.5km (July 2017 to September 2019) – projectmap
France N19: Boissy-Saint-Leger-East – south of Boissy-Saint-Leger ~2km (March 2014 to September 2019) – ? – map
Italy SP103 Milan: Segrate (A51) – Segrate 1.3km (October 2017 to September 2019) – projectmap
Spain A11: Langa de Duero – San Esteban de Gormaz 11.4km (2009/10 to September 2019) – ? – map
Spain SG20: east of Segovia-South (AP61) – Segovia-West (N110) 7.1km (May 2016 to September 2019) – ? – map
Denmark PR53: Dalby – Frederikssund-South (PR17) 9.3km (April 2016 to Late September 2019) – projectmap
Germany A72: AS Borna-North – AS Rötha 8.5km (July 2013 to Late September 2019) [direction Leipzig]projectmap

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; July 14th, 2019 at 10:33 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:22 PM   #5
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Lists sorted by country

Albania

2014 opening:

A3: Mushqeta – Elbasan ~14km (April 2011 to 31st July 2014) – ? – map
SH4: Kavaje – Rrogozhine ~20km (2010 to August 2014) – ? – map

2017:

A3: Tirana – south of Berzhite 8km (April 2011 to June 2017?) [1st c/w] – ? – map

2019:

A3: Tirana – south of Berzhite 8km (April 2011 to Mid March 2019) [2nd c/w] – ? – map
A3: south of Berzhite – Mushqeta 5km (April 2011 to Mid March 2019) [1st c/w] – ? – map
A3: south of Berzhite – Mushqeta 5km (April 2011 to 4th June 2019) [2nd c/w] – ? – map
A2: Mbrostar Ura – Levan 22km (2013 to Summer 2019) [1st c/w] – ? – map
A2: Mbrostar Ura – Levan 22km (2013 to 2019?) [2nd c/w] – ? – map


Austria

2014 opening:

S10: Freistadt-North – Freistadt-South 5.9km (Summer 2011 to 16th November 2014) – projectmap

2015 opening:

A9: Bosrucktunnel 7.3km (2007 to 19th October 2015) [2nd c/w] – projectmap
S36: west of Sankt Georgen – east of Sankt Georgen ~1.5km (April 2013 to 1st December 2015) – projectmap
S10: Freistadt-South – Unterweitersdorf 13.6km (Spring 2012 to 20th December 2015) – projectmap

2017 opening:

A9: Gleinalmtunnel 8.3km (September 2013 to 21st July 2017) [2nd c/w] – projectmap
A5: Poysbrunn – Schrick 25km (April 2015 to 8th December 2017) – projectmap

2018 opening:

A9: Tunnelkette Klaus 8km (September 2013 to 19th December 2018) [2nd c/w] – projectmap

2019 opening:

A5: Drasenhofen-North – south of Drasenhofen 5.5km (April 2018 to Late 2019) [1st c/w] – projectmap

2020 opening:

S16: Landeck-West – east of Perjen tunnel ~4km (Spring 2015 to March 2020) [2nd c/w] – projectmap
S36: rededication north of Unzmarkt – west of Sankt Georgen ~3.5km (1st October 2020) – projectmap
S36: north of Unzmarkt – south of Unzmarkt ~2.5km (March 2017 to 1st October 2020) – projectmap

2023 opening:

A11: north of Karawanks tunnel – AT/SLO border 4.9km (September 2015 to Summer 2023) [2nd c/w] – projectmap
S7: Riegersdorf (A2) – Dobersdorf 14.8km (May 2015 to Late 2023) – projectmap
A26: Linz-Danube-North – Linz-Danube-South 0.9km (January 2019 to December 2023) – projectmap

__________________

Last edited by MichiH; June 15th, 2019 at 01:13 PM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:23 PM   #6
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Belarus

2014 opening:

M6: Dubraulyany – Plianty 8km (2011 to 2014) – ? – map

2015 opening:

M14: Haroski (P28) – Ostroshitskij Gorodok (M3) 28km (Early 2014 to 6th October 2015) – ? – map
M14: Rakaw (M6) – Haroski (P28) 18km (Early 2014 to Late December 2015) – ? – map

2016 opening:

M14: Boroviki (M1) – Rakaw (M6) 42km (2014 to 22nd December 2016) – ? – map


Belgium

2017 opening:

A11: Brugge (N31) – Westkapelle 12km (March 2014 to 1st September 2017) – projectmap
N5: Couvon-North – Couvin-South 4km (October 2011 to 17th October 2017) – projectmap

2018 opening:

A11: rededication Westkapelle – Zelzate-West 38km (Mid 2018) [not fully grade-separated] – ? – map

2019 opening:

N5: Couvin-South – B/F border (Bruly) 9km (August 2015 to Early September 2019) – projectmap


Bosnia and Herzegovina (map and summary)

2014 opening:

A1: Josanica – Butila 5.7km (October 2007 to 26th June 2014) – projectmap
A1: Butila – Vlakovo 3.9km (July 2013 to 26th June 2014) – projectmap
A1: Zenica-South – Biljesevo 6.5km (August 2010 to 25th August 2014) – projectmap
A1: Medugorje - Zvirovici 9.1km (October 2010 to 17th September 2014) – projectmap
A1: Vlakovo – Lepenica 10.2km (January 2013 to 7th October 2014) – projectmap
A1: Lepenica – Tarcin 10.1km (June 2012 to 7th October 2014) – projectmap

2015 opening:

?: Butila (A1) – Brijesce 3.5km (October 2010 to 24th November 2015) – projectmap

2016 opening:

"BaDoHwy": Prnjavor – Johovac 34.5km (May 2013 to 11th September 2016) – projectmap

2017 opening:

"BaDoHwy": Mahovljani – Drugovic 10km (October 2014 to 1st October 2017) – projectmap
?: Brijesce – Boljakov Potok 1.5km (May 2016 to 22nd November 2017) – ? – map
A1: Svilaj – Odzak 9km (November 2013 to 11th December 2017) – projectmap

2018 opening:

"BaDoHwy": Drugovic – Prnjavor 24km (October 2014 to 2nd October 2018) – projectmap

2019 opening:

A1: HR/BIH border (Svilaj) – Svilaj 2km (November 2013 to December 2019) – projectmap

2020 opening:

A1: Mostar-South – Pocitelj 20km (October 2018 to >= 2020) – ? – map

2021 opening:

A1: Johovac – Doboj-North 6km (June 2019 to June 2021) – projectmap
"BaDoHwy": Johovac – Johovac (A1) 3km (Summer 2012 to June 2021) – projectmap
A1: Zenica-North - Zenica-South 12.2km (October 2014 to September 2021) – projectmap

2022 opening:

E661: HR/BIH border – Gradiska ~4.5km (September 2004 to Spring 2022) [border bridge not yet u/c] – ? – map

__________________

Last edited by MichiH; July 14th, 2019 at 10:34 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:23 PM   #7
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Bulgaria

2014 opening:

A4: Generalovo – Kapitan Andreevo 5.4km (November 2011 to 14th August 2014) – ? – map

2015 opening:

A4: Dimitrovgrad – Harmanli 31.5km (July 2011 to 28th May 2015) – projectmap
A4: Kapitan Petko Voyvoda – east of Svilengrad 8.9km (Spring 2011 to 7th June 2015) [2nd c/w] – ? – map
A3: Marino pole – Kulata 3.2km (April 2012 to 16th July 2015) [1st c/w] – projectmap
A3: Marino pole – Kulata 3.2km (April 2012 to 31st July 2015) [2nd c/w] – projectmap
A3: south of Sandanski – Marino pole 11.5km (April 2012 to 31st July 2015) – projectmap
A2: Belokopitovo – Panayot Volovo 4.9km (August 2013 to 3rd August 2015) – ? – map
A3: Dupnitsa – Blagoevgrad ~40km (July 2013 to 22nd October 2015) – projectmap
II18: Kakach river – Lyulin (A3) 3.0km (September 2012 to 22nd October 2015) – projectmap
A4: Chirpan – Dimitrovgrad 33.8km (October 2011 to 29th October 2015) – projectmap
I1: Montana bypass 12.5km (September 2013 to 29th December 2015) – projectmap
A6: Trebich (II18) – Iliyantsi-Rozhen Boulevard 2.5km (February 2015 to 30th December 2015) – projectmap
A6: Benkovski-Lazar Mihailov Boulevard – Sofia-East (A2) 10.1km (February 2015 to 30th December 2015) – projectmap

2016 opening:

A6: Iliyantsi-Rozhen Boulevard – Benkovski-Lazar Mihailov Boulevard 3.0km (February 2015 to 28th April 2016) – projectmap
II18: Trebich (A6) – Kakach river 5.5km (October 2015 to 13th September 2016) – ? – map
A6: Mramor – Trebich (SNST/II18) ~1km (2015 to 13th September 2016) – ? – map
II18: north of Kazichane bridge – south of Kazichane bridge 0.6km (August 2016 to 9th December 2016) [2nd c/w] – ? – map

2018 opening:

A3: Kresna – south of Sandanski 23.6km (August 2016 to 17th December 2018) – projectmap

2019 opening:

A3: Blagoevgrad – Blagoevgrad-South 6.8km (August 2017 to 23rd May 2019) – projectmap
A2: Yablanitsa – Boaza 9.3km (Early 2018 to Early Fall 2019) – ? – map

2021 opening:

A6: Dragoman – Herakovo 16.9km (May 2019 to Mid 2021) – ? – map
A2: Buhovtsi – Belokopitovo 16.3km (August 2018 to Summer 2021) – ? – map

2022 opening:

A3: Zheleznitsa – Krupnik 5.8km (February 2019 to Early 2022) – projectmap
A2: Boaza – Dermantzi (I307) 15.3km (April 2019 to 2022) – ? – map


Last edited by MichiH; June 15th, 2019 at 01:24 PM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:24 PM   #8
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Croatia

2014 opening:

D1: Split-Dracevac – Klis (near Klis Kosa) 3km (? to 23rd June 2014) [2nd c/w] – ? – map
D2: Osijek (A5) – Osijek (Z4085) 7.5km (September 2011 to 28th November 2014) [2nd c/w] – ? – map
D1: Split-Dracevac – Klis (near Ozrna) 1.5km (? to 30th November 2014) [2nd c/w] – ? – map

2015 opening:

A5: Sredanci (A3) – Zoljani 3.2km (September 2011 to 2nd March 2015) – ? – map
A11: Busevec – Lekenik 11.2km (April 2010 to 22nd April 2015) – ? – map
D14: Mokrice (A2) – Andrasevec 4.5km (2012 to 7th October 2015) [1st c/w]– ? – map
A11: Jakusevec (A3) – Velika Gorica 8.5km (April 2006 to 3rd November 2015) – ? – map
D2: Osijek (Z4085) – Osijek (Z4091) 4.6km (September 2011 to 5th November 2015) [2nd c/w] – ? – map

2016 opening:

D10: south of Gradec – Gradec 1.0km (2011 to 15th June 2016) – ? – map
D10: Gradec – Krizevci 11.0km (? to 2nd September 2016) – ? – map

2017 opening:

D14: Andrasevec – Bedekovcina 5.0km (March 2015 to 6th February 2017) [1st c/w]– ? – map
D538: Virovitica (D5) – Suhopolje 9.1km (September 2014 to 4th December 2017) [1st c/w]– ? – map

2019 opening:

D12: Vrbovec (D10) – Farkasevac 10.5km (? to 16th April 2019) – ? – map
D14: Bedekovcina – Zlatar Bistrica 6.5km (2017 to Mid 2019) [1st c/w]– ? – map
A5: Zoljani – HR/BIH border 2.0km (September 2011 to December 2019) – ? – map

2020 opening:

A5: Beli Manastir – north of Drava bridge ~18km (August 2018 to Late 2020) – ? – map
A5: north of Drava bridge – Osijek ~6km (July 2011 to Late 2020) – ? – map

2021 opening:

A8: Vranja – Rogovici 28km (November 2018 to Late 2021) [2nd c/w] – ? – map


Cyprus

No new motorway or expressway currently u/c

__________________

belerophon, keokiracer, EasySeven, Luki_SL liked this post

Last edited by MichiH; July 14th, 2019 at 10:35 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:24 PM   #9
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Czechia

2014 opening:

I44: Zvole – Vlachov 2.9km (April 2009 to 31st July 2014) – projectmap
I35: Lesna – Priluky 1.7km (November 2009 to 8th September 2014) – projectmap

2015 opening:

MO: Prague-Malovanka – Prague-Troja 5.5km (2007 to 19th September 2015) – projectmap
I11: Mokre Lazce – Ostrava-Krasne Pole 9.8km (January 2009 to 13th October 2015) – projectmap
D6: Bosov – Lubenec 4.1km (May 2010 to 10th November 2015) – projectmap

2016 opening:

Since 1st January 2016, R road classification has been abandoned. Former R roads are dedicated as D or I roads now, the actual dedication is as follows:map
D8: Rehlovice – Bilinka 12.4km (November 2007 to 17th December 2016) – projectmap

2017 opening:

D11: Praskacka – Hradec Kralove ~4km (July 2014 to 21st August 2017) – projectmap
I35: Priluky – Mstenovice 0.7km (November 2009 to 11th September 2017) – projectmap
D3: Borek – Usilne ~2.5km (April 2015 to 27th September 2017) – projectmap
D4: Pribram/Skalka – Haje 4.8km (April 2015 to 4th October 2017) – projectmap
D3: Veseli nad Luznici – Bosilec 5.1km (April 2015 to 12th October 2017) – projectmap
I11: Nebory – Oldrichovice 4.9km (August 2014 to 17th October 2017) – projectmap
I11: Oldrichovice – south of Bystrice 6.2km (August 2014 to 17th October 2017) – projectmap

2018 opening:

D7: Bitozeves – Postoloprty-West 3.8km (July 2016 to 30th August 2018) – projectmap

2019 opening:

D3: Bosilec – Sevetin 8.1km (September 2015 to 24th June 2019) – projectmap
I13: Trebusice-North – east of Trebusice-East 1.4km (November 2017 to October 2019) – projectmap
D1: Prerov-North (D55) – Lipnik nad Becvou (D35) 14.3km (July 2015 to November 2019) – projectmap

2020 opening:

D3: Sevetin – Borek 10.7km (March 2017 to March 2020) [2nd c/w] – projectmap
D6: Krusovice – Revnicov 4.2km (December 2017 to November 2020) – projectmap
D6: Revnicov – Nove Straseci 5.6km (December 2017 to November 2020) – projectmap
I11: Ostrava-Krasne Pole – Ostrava-Poruba 6.7km (November 2012 to 2020) – projectmap
D48: Rybi – Rychaltice 11.5km (May 2017 to December 2020) – projectmap

2021 opening:

D6: west of Lubenec – east of Lubenec 4.9km (March 2018 to March 2021) – projectmap
D55: Otrokovice-East – Otrokovice-South 3.1km (October 2018 to October 2021) – projectmap
D11: north of Smirice – Jaromer-North 7.4km (May 2018 to December 2021) – projectmap

2022 opening:

D35: Opatovice – Casy 12.6km (March 2019 to January 2022) – projectmap
D48: west of Frydek-Mistek-West (D56) – Frydek-Mistek-South 3.6km (May 2018 to February 2022) – projectmap
D56: Frydek-Mistek-Sviadnov – Frydek-Mistek-West (D48) 2.3km (May 2018 to February 2022) – projectmap
D11: Hradec Kralove – north of Smirice 15.5km (October 2018 to June 2022) – projectmap
D3: Usilne – Hodejovice 7.5km (April 2019 to September 2022) – projectmap
D3: Hodejovice – Trebonin 12.5km (March 2019 to September 2022) – projectmap
D35: Casy – Ostrov 14.7km (December 2018 to 2022) – projectmap
D49: Hulin (D1/D55) – Frystak 16.4km (September 2008 to 2022/23) – projectmap

Unknown opening date:

D48: Frydek-Mistek-South – Frydek-Mistek-East 5.0km (May 2018 to ?) – projectmap

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; June 30th, 2019 at 12:37 PM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:25 PM   #10
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Denmark

2014 opening:

PR18: Brande-North – Brande-South 7km (2012 to 27th May 2014) [2nd c/w] – projectmap
PR15: Harup – Lasby 11.7km (2010 to 1st December 2014) – projectmap

2015 opening:

PR17: Tvaervej – Ballerup 5km (Fall 2012 to 13th July 2015) – projectmap

2016 opening:

PR15: Funder – Harup 17.5km (2010 to 11th September 2016) – projectmap

2017 opening:

SR502: Tjorring – Herning-Snejbjerg 10km (February 2015 to 28th May 2017) – projectmap
PR18: Tvis – Tjorring 18km (May 2015 to 27th November 2017) – projectmap

2018 opening:

PR18: Holstebro-North – Tvis 22km (May 2015 to 30th September 2018) – projectmap

2019 opening:

PR53: Dalby – Frederikssund-South (PR17) 9.3km (April 2016 to Late September 2019) – projectmap
PR23: Knabstrup – Kvanlose 6.5km (September 2017 to Late 2019) – projectmap


Estonia

2014 opening:

T11: east of Luige – west of Kurna 1.6km (October 2013 to Fall 2014) – ? – map

2015 opening:

T11: west of Kurna – Jüri (T2) 4.4km (April 2014 to October 2015) – ? – map

2017 opening:

T11: Jüri (T2) – east of Porguvälja 1km (September 2015 to January 2017) – ? – map
T11: Kanama (T4) – Saku 5.5km (May 2016 to September 2017) – ? – map

2018 opening:

T11: south of Lagedi – north of Veneküla 3.2km (August 2016 to October 2018) – ? – map
T11: north of Porguvalja – south of Lagedi 3.7km (Fall 2017 to November 2018) – ? – map

2019 opening:

T11: north of Veneküla – Tallin-East (T1) 3.0km (August 2017 to Late 2019) – ? – map

2020 opening:

T2: Kose – Ardu 12.7km (September 2017 to December 2020) – ? – map
T2: Ardu – Voobu 11.5km (February 2018 to December 2020) – ? – map

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; May 5th, 2019 at 10:47 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:25 PM   #11
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Finland

2014 opening:

Vt7: Pyhtää – Kotko-West 14km (November 2011 to 12th August 2014) – projectmap
Vt7: Loviisa – Ahvenkoski 15km (November 2011 to 1st September 2014) – projectmap
Vt5: Vuorela – Palvaranta 5km (October 2009 to September 2014) – projectmap
Vt7: Hamina-Lankamalmi – Hamina-East 15.7km (Early 2012 to 17th December 2014) – projectmap

2015 opening:

Vt8: Masku – Raisio-North 9km (February 2014 to 27th November 2015) – projectmap

2016 opening:

Vt6: Luumäki (Vt26) – Jurvala-East 17km (October 2015 to 23rd November 2016) – projectmap
Vt8: Nousianinen – Masku 3km (February 2014 to 22nd December 2016) – projectmap

2017 opening:

Vt7: Hamina-East – Kattilainen 5km (June 2015 to 10th February 2017) – projectmap
Vt4: Myllyntaus – Rannankylä 3.5km (Late 2016 to 13th October 2017) – projectmap
Vt6: Jurvala-East – west of Selkäharju (Vt13) 9km (October 2015 to 31st October 2017) – projectmap

2018 opening:

Vt7: Kattilainen – Virojoki 19.5km (June 2015 to 14th February 2018) – projectmap
Vt7: Virojoki – Vaalimaan 7.5km (June 2015 to 1st March 2018) – projectmap

2019 opening:

Vt4: Äänekoski – Myllyntaus 4km (August 2017 to 11th January 2019) – projectmap

2021 opening:

Vt4: south of Asemakylä – north of Kello 8km (May 2017 to 2021) – projectmap
Vt12: Okeroinen – Kujala (Vt4) 6km (Spring 2017 to 2021) – projectmap
Kt40: Pukkilan – Kirismäen (Vt1) 3km (March 2019 to 2021) – projectmap

__________________

Last edited by MichiH; April 7th, 2019 at 10:32 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:26 PM   #12
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

France

2014 opening:

D222: Tregueux-Le Creach – Tregueux-La Croix Gibat 2km (? to 27th January 2014) – projectmap
A50: Tunnel de Toulon 3.2km (September 2007 to 19th March 2014) [2nd c/w] – ? – map
N7: Saint-Prix – Saint-Martin-Estreaux 9.5km (2007 to 19th March 2014) – ? – map
A75: rededication Pezenas-North – Pezenas-South ~4km (1st July 2014) – ? – map
D177: Guichen-South – Guignen ~5km (? to 22nd May 2014) – ? – map
D642: Hazebrouck-East – east of Strazeele 6km (? to 30th June 2014) – ? – map
N249: Montourneau – Bressuire-West 11km (April 2012 to 3rd October 2014) – ? – map
N88: Albi-Le Lude – Albi-Stadium 1.5km (? to 15th October 2014) [2nd c/w] – projectmap
N7: Moiry – Maison-Rouge 3.5km (? to 30th October 2014) – ? – map
D767: south of Colpo – Locmaria-Grand-Champ 6km (? to 6th November 2014) – ? – map
D1206: north of Machilly – Annemasse-East ~7km (? to 24th November 2014) – ? – map
N249: Cholet (D160) – Cholet (A87) 3.3km (March 2011 to 4th December 2014) [2nd c/w] – ? – map
D924: West of Ecouche – Argentan-West (A88) ~7km (2011 to 12th December 2014) – ? – map

2015 opening:

A719: Gannat-East – Vichy 13.8km (August 2011 to 12th January 2015) – projectmap
A89: Brive-North – Saint-Germain-les-Vergnes 4km (? to 7th February 2015) [2nd c/w] – ? – map
A150: Yvetot – Barentin 18km (March 2013 to 9th February 2015) – projectmap
N88: Albi-Stadium – north of Albi-Caussels 2.3km (? to 20th February 2015) [2nd c/w] – projectmap
N79: Verosvres – Col des Vaux ~2km (? to 23rd June 2015) – projectmap
N88: La Baraque St-Jean – La Mothe 13.7km (December 2010 to 2nd July 2015) – projectmap
A466: Quincieux (A46) – Les Cheres (A6) 4km (? to 4th July 2015) – projectmap
D177: Guignen – Le Tertre ~2km (? to 22nd July 2015) – ? – map
D170: Bonneuil-en-France – Gonesse 3km (? to 6th October 2015) [direction Bonneuil-en-France] – ? – map
D177: north of Loheac – south of Loheac ~3km (2013 to 12th November 2015) – ? – map
N164: west of Loudeac – Loudeac-North (D700) 4.1km (? to 10th December 2015) [2nd c/w] – ? – map
D170: Bonneuil-en-France – Gonesse 3km (? to 17th December 2015) [direction Gonesse] – ? – map
N79: Bresnay – Chemilly 6.3km (July 2013 to 18th December 2015) [2nd c/w] – projectmap
D177: Renac – Sainte-Marie 2.0km (? to 23rd December 2015) – ? – map
D498: Bonson-West – Bonson-East 3.1km (? to 23rd December 2015) – ? – map

2016 opening:

N7: Maison-Rouge – Saint-Pierre-le-Moutier-North 2.1km (? to 29th June 2016) – ? – map
D177: Le Tertre – north of Loheac 3.5km (2013 to 9th November 2016) – ? – map
D177: Courbouton - Pipriac ~4.5km (? to 9th November 2016) – ? – map
A507: Frais Vallon – Marseille-East (A50) 5.2km (1993 to 29th November 2016) – projectmap
D16: L/F border (Belval) – Audun-le-Tiche 3km (? to 16th December 2016) – ? – map
N7: Varennes-sur-Allier-North – south of Varennes-sur-Allier 4.8km (2009 to 20th December 2016) – ? – map

2017 opening:

D222: Tregueux-La Croix Gibat – Yffiniac 1.8km (? to 30th January 2017) – projectmap
D700: Bel Air – La Fourchette 3km (? to 30th January 2017) – ? – map
D173: Retiers-South – La Noe Jollys 6.8km (? to 31st January 2017) – ? – map
N70: Paray-le-Monial (N79) - Saint-Vincent-Bragny 5.2km (? to 22nd March 2017) – ? – map
D173: Saint-Morand – Le Moulin 3.5km (Late 2015 to Late April 2017) – ? – map
D775: Le Lion-d'Angers-South – Grez-Neuville ~3km (? to 15th May 2017) – ? – map
D1032: Noyon – Ribecourt 7.5km (2012 to 22nd May 2017) – ? – map
A9: Saint-Jean-de-Vedas – Saint Aunes ~12km (October 2014 to 30th May 2017) [eastbound]projectmap
A9: Saint-Jean-de-Vedas – Saint Aunes ~12km (October 2014 to 31st May 2017) [westbound; existing A9 was renumbered to A709]projectmap
N10: south of Reignac – south of Touverac 6.6km (2014 to 1st June 2017) [1st c/w] – ? – map
D924: Landigou – Durcet 3km (February 2016 to 15th June 2017) – ? – map
N10: south of Reignac – south of Touverac 6.6km (2014 to 26th June 2017) [2nd c/w] – ? – map
N19: Amblans – Lure-West 3km (Summer 2013 to 11th July 2017) – projectmap
D775: Grez-Neuville - La Membrolle-North ~3km (? to 13th July 2017) – ? – map
N164: east of Saint-Meen-le-Grand – Montauban-de-Bretagne (N12) 5.4km (January 2014 to 6th October 2017) [1st c/w] – projectmap
N70: Blanzy – Saint-Eusebe 4km (Fall 2015 to 23rd October 2017) [2nd c/w] – ? – map
D222: Yffiniac – Yffiniac (N12) 0.7km (? to 27th November 2017) – projectmap
D949?: east of Bournezeau – west of Chantonnay 5.5km (? to 11th December 2017) – ? – map
N57: Breurey – Voray-sur-l'Ognon 4.8km (January 2015 to 20th December 2017) – ? – map
A304: Rocroi – Rimogne 8km (July 2011 to 21st December 2017) – projectmap
N164: east of Saint-Meen-le-Grand – Montauban-de-Bretagne (N12) 5.4km (January 2014 to 22nd December 2017) [2nd c/w] – projectmap

2018 opening:

A89: east of Lentilly – Limonest (A6) 5.5km (Mid 2015 to 3rd March 2018) – projectmap
D9: Gare d'Aix-en-Provence-TGV-East – Calas 3km (? to 17th April 2018) – ? – map
D177: Pipriac – Saint-Just 2.7km (? to 31st May 2018) – ? – map
A85: Sauldre viaduct Romorantin-Lanthenay 1km (November 2016 to June 2018) [2nd c/w] – projectmap
N2: Crepy-en-Valois – east of Gondreville 3.5km (2013 to 6th July 2018) [1st c/w] – ? – map
N82: Neulise – Balbigny 5.2km (2014 to 6th July 2018) – ? – map
N88: Malpas – Brive-Charensac-West 8.7km (Spring 2010 to 16th July 2018) – projectmap
N70: north of Palinges – Genelard 6km (April 2017 to 19th July 2018) [2nd c/w] – ? – map
A304: Rimogne – Charleville-Mezieres (A34) 23km (July 2011 to 31st July 2018) – projectmap
N2: Crepy-en-Valois – east of Gondreville 3.5km (2013 to September 2018) [2nd c/w] – ? – map
N2: east of Gondreville – Vaumoise/Vauciennes 3.5km (2013 to September 2018) – ? – map
A507: Les Arnavaux (A7) – Sainte-Marthe 3km (August 2014 to 17th October 2018) [northbound]projectmap
D902: Beauzelle (4) – Beauzelle (5) 0.6km (? to 19th October 2018) – ? – map
A507: Les Arnavaux (A7) – Sainte-Marthe 3km (August 2014 to 25th October 2018) [southbound]projectmap
N44: Moncetz-Longevas – St-Germain-la-Ville 4.2km (October 2016 to 30th October 2018) [northbound] – ? – map
N44: Moncetz-Longevas – St-Germain-la-Ville 4.2km (October 2016 to 12th November 2018) [southbound] – ? – map
D173: Martigne-Ferchaud-South – Saint-Morand ~5km (? to 13th December 2018) – ? – map
N70: Saint-Eusebe – Montchanin-East 4km (Fall 2015 to Mid December 2018) [2nd c/w] – ? – map

2019 opening:

A85: west of Cher viaduct – Saint Aignan 2km (November 2016 to 1st March 2019) [2nd c/w] – projectmap
D924: Durcet – east of Durcet 2km (? to 17th May 2019) – ? – map
N10: south of Touverac – north of Chevanceaux 4.7km (2014 to 20th June 2019) – projectmap
N70: north of Palinges – south of Palinges 1km (April 2017 to 1st July 2019) [2nd c/w] – ? – map
A406: west of Macau-Loche – Macau-South 4.5km (July 2017 to September 2019) – projectmap
N19: Boissy-Saint-Leger-East – south of Boissy-Saint-Leger ~2km (March 2014 to September 2019) – ? – map
N7: south of Villeneuve-sur-Allier – Trevol 2km (2017 to 2019) – ? – map
N57: Devecey – north of Ecole-Valentin (A36) 4.5km (March 2015 to 2019) – ? – map
N141: La Vigerie – Saint-Yrieix 5.5km (? to 2019) – ? – map
D173: La Noe Jollys – Martigne-Ferchaud-North ~2km (? to 2019) – ? – map
A16: L'Isle-Adam (N184) – La Croix Verte (N104) 8km (2016 to Late 2019) – projectmap
N7: north of Villeneuve-sur-Allier – south of Villeneuve-sur-Allier ~7km (Late 2010 to Late 2019) – ? – map
N79: Paray-le-Monial-East – Charolles-West 8km (February 2017 to Late 2019) – ? – map
N88: La Mothe – Baraqueville 7km (Spring 2017 to Late 2019) – ? – map
N88: Baraqueville – Les Molinieres 7km (September 2014 to Late 2019) – ? – map
D973: Marcey-les-Greves – Les Martellieres (A84) 4.8km (February 2016 to Late 2019) – ? – map
N1: La Possession-North – Saint-Denis-West 12.5km (December 2013 to >= 2019) – projectmap
N27: Arques-la-Bataille – Manehouville 7.7km (July 2012 to 2019/20) – ? – map

2020 opening:

A79: Montmarault (A71) – north of Montmarault 4km (Early 2018 to April 2020) – projectmap
A85: Perree viaduct 1km (November 2017 to Mid 2020) [2nd c/w] – projectmap
A85: La Roumer viaduct 2km (November 2017 to Mid 2020) [2nd c/w] – projectmap
A85: west of Langeais – Langeais 1km (November 2017 to Mid 2020) [2nd c/w] – projectmap
N19: Port-sur-Saone-West – Charmoille 7.9km (2016 to Mid 2020) – ? – map
N4: Saint-Georges – Hertzing 3km (? to 2018) – ? – map
N19: Botans – Moval 3.5km (March 2017 to 2020) – ? – map
N353: Entzheim (A35) – Fegersheim (N83) 3.5km (October 2015 to 2020) – projectmap
D173: Martigne-Ferchaud-North – Martigne-Ferchaud-South ~2km (? to 2020) [2nd c/w] – ? – map
N164: Lennon – Landeleau 12.5km (July 2017 to Late 2020) – projectmap
D177: Saint-Just – Renac 7km (Mid 2018 to Late 2020) – ? – map

2021 opening:

A355: Vendenheim (A4/A35) – Duppigheim (A35/A352) 24km (September 2018 to 2021) – projectmap
N124: Aubiet-East – Gimont-East 11.5km (January 2015 to 2021) – ? – map

2022 opening:

N1013: Parville-East – Fayeux 7.3km (2014 to 2022) – projectmap

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; July 7th, 2019 at 09:23 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:26 PM   #13
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Germany (map)

2014 opening:

A30: AS Bad Oeynhausen-North – AS Dehme 1.6km (September 2008 to 12th March 2014) – projectmap
A524: west of AK Duisburg-South – west of AS Duisburg-Rahm 1.9km (February 2010 to Early July 2014) – ? – map
A44: AS Hessisch Lichtenau-West – AS Hessisch Lichtenau-Center 2.2km (April 2008 to 24th July 2014) – projectmap
B243: AS Bad Lauterberg – AS Bad Sachsa 8.6km (October 2008 to 5th September 2014) – projectmap
A66: AS Neuhof-South – AS Neuhof-North 3.7km (October 2005 to 13th September 2014) – projectmap
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 17th September 2014) [direction Cologne]projectmap
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 20th September 2014) [direction Aachen; discontinuation: 12.8km]projectmap
A281: AS Bremen-Seehausen – AS Bremen-Strom 4.1km (April 2009 to 29th September 2014) – projectmap
A62: south of AS Weselberg – Schwarzbach viaduct 3.6km (September 2013 to Late September 2014) [2nd c/w] – ? – map
A14: AS Colbitz – AS Wolmirstedt 5.7km (November 2011 to 29th October 2014) – projectmap
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 30th October 2014) [direction Erfurt]projectmap
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 18th November 2014) [direction Dresden; discontinuation: 12.6km]projectmap
A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 28th November 2014) [direction Stade]projectmap
A21: south of Nettelsee – Stolpe 2km (February 2012 to 2nd December 2014) – projectmap
B2: AS Roth-Otto-Lilienthal-Kaserne – south of Untersteinbach 3.3km (October 2012 to 5th December 2014) – projectmap
B50: AK Wittlich – AS Platten 5.4km (May 2003 to 15th December 2014) – projectmap

2015 opening:

A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 17th July 2015) [direction Hamburg]projectmap
A71: Etzleben – AS Sömmerda-East 11.4km (June 2010 to 3rd September 2015) – projectmap
A23: AS Itzehoe-Center – south of Stör bridge 2.5km (January 2007 to 26th October 2015) – projectmap
B10: Walmersbach – AS Hinterweidenthal 2.5km (June 2010 to 30th October 2015) – projectmap
A14: AK Schwerin – AS Grabow 14.4km (November 2012 to 21st December 2015) – ? – map
A14: AS Groß Warnow – AS Karstädt 10.8km (October 2013 to 21st December 2015) – projectmap

2016 opening:

A23: south of Stör bridge – AS Itzehoe-South 2.0km (2010 to 14th June 2016) – projectmap
B535: AS Mannheim-Friedrichsfeld – AS Schwetzingen-Center 1.9km (December 2010 to 4th August 2016) [2nd c/w] – projectmap
B33: AS Offenburg-Zunsweier – AS Gengenbach-North 2.8km (October 2010 to 25th October 2016) – ? – map
B85: Piendling – Untertraubenbach 3.2km (March 2014 to 28th October 2016) – projectmap

2017 opening:

A448: rededication AD Bochum-West – AS Bochum-Wiemelhausen 5.9km (1st January 2017) – projectmap
B47: AS Worms (A61) – AS Worms-West 2.1km (May 2016 to Mid 2017) [2nd c/w] – projectmap
B300: AS Gallenbach – AS Aichach-West 2.7km (October 2014 to 11th October 2017) – projectmap
A8: east of Walbrücke – AS Merzig-Schwemlingen 2.0km (April 2015 to October 2017) [2nd c/w] – projectmap
B33: AS Offenburg-Elgersweier (B3) – AS Offenburg-Zunsweier 2.4km (October 2010 to 30th October 2017) – ? – map
A21: north of AS Nettelsee – south of Nettelsee 2.1km (February 2012 to 9th December 2017) – projectmap
A14: AS Grabow – AS Groß Warnow 11.5km (June 2015 to 20th December 2017) – ? – map

2018 opening:

A33: AS Halle-Künsebeck – AS Bielefeld-Center 7.9km (September 2009 to 4th April 2018) – projectmap
A44: AS Hessisch Lichtenau-East – Hasselbach 4.3km (September 2010 to 13th April 2018) – projectmap
A44: Hasselbach – AS Waldkappel 6.9km (March 2011 to 13th April 2018) – projectmap
A44: AS Heiligenhaus – AS Heiligenhaus-Hetterscheidt 4.9km (April 2010 to 14th April 2018) – projectmap
A72: south of AS Borna-North – AS Borna-North 1.0km (July 2013 to 30th June 2018) – projectmap
A44: west of AK Jackerath – AK Holz 10.2km (May 2012 to 1st July 2018) [direction Mönchengladbach]projectmap
B33: AS Allensbach-West – east of AS Allensbach-West 1.2km (November 2015 to 2nd July 2018) [1st c/w] – projectmap
B85: AS Schafhof – AS Freihölz 2.5km (June 2017 to Mid July 2018) – projectmap
A8: east of AS Merzig-Wellingen – east of Walbrücke 1.5km (April 2015 to August 2018) [2nd c/w] – projectmap
B49: Landfill site Beselich – Beselich/Merenberg 3.4km (May 2011 to 20th August 2018) [direction Wetzlar]projectmap
A448: AS Altenbochum (East) – AK Bochum/Witten 1.4km (October 2012 to 24th August 2018) – projectmap
A44: west of AK Jackerath – AK Holz 10.2km (May 2012 to 2nd September 2018) [direction Aachen; discontinuation: 7.5km]projectmap
B49: Landfill site Beselich – Beselich/Merenberg 3.4km (May 2011 to 5th September 2018) [direction Limburg]projectmap
B300: AS Dasing (A8) – AS Gallenbach 1.5km (21st September 2014 to 21st September 2018) – projectmap
B14: south of AS Waldrems – north of AS Nellmersbach 1.0km (June 2016 to 26th September 2018) – ? – map
B266: AS Bad Neuenahr (A573) – AS Bad Neuenahr-East 1.8km (February 2009 to 12th October 2018) – projectmap
B175: north of AS Mosel (B93) – AS Mosel-VW 1km (May 2016 to 9th November 2018) – ? – map
B85: AS Neubäu-West – AS Neubäu-East 4.0km (November 2015 to 16th November 2018) [1st c/w] – projectmap
A30: AS Gohfeld – AS Bad Oeynhausen-North 5.3km (September 2008 to 9th December 2018) [1st c/w; direction Osnabrück]projectmap
A30: AS Dehme – AS Bad Oeynhausen-East 1.9km (September 2008 to 9th December 2018) – projectmap
B33: AS Allensbach-West – east of AS Allensbach-West 1.2km (November 2015 to 11th December 2018) [2nd c/w] – projectmap
A30: AS Gohfeld – AS Bad Oeynhausen-North 5.3km (September 2008 to 13th December 2018) [1st c/w; direction Hannover]projectmap
B101: AS Thyrow – AS Trebbin-North 5.0km (May 2015 to 14th December 2018) – projectmap

2019 opening:

A36: rededication AD Vienenburg (A369) – AK Bernburg (A14) 84.5km (1st January 2019) – ? – map
A369: rededication AD Vienenburg (A36) – Bad Harzburger Dreieck (B6) 4.3km (1st January 2019) – ? – map
A33: north of AS Halle – Halle-Künsebeck 4.9km (December 2012 to 11th January 2019) – projectmap
B29: east of Böbingen – west of Essingen 6.9km (July 2015 to 28th April 2019) – projectmap
A30: AS Gohfeld – east of AS Gohfeld 1.5km (September 2008 to Early June 2019) [2nd c/w] [discontinuation: 1.4km]projectmap
A33: AS Belm (B51) – south of AS Osnabrück-Schinkel 2.2km (February 2015 to 12th June 2019) – projectmap
B51: AS Belm-Icker – AS Belm (A33) 1.5km (February 2015 to 12th June 2019) – projectmap
B33: Waldsiedlung – AS Reichenau 0.9km (June 2014 to Mid 2019) – projectmap
A72: AS Borna-North – AS Rötha 8.5km (July 2013 to August 2019) [direction Chemnitz]projectmap
A30: east of AS Gohfeld – AS Bad Oeynhausen-North 3.8km (September 2008 to Summer 2019) [2nd c/w] – projectmap
A72: AS Borna-North – AS Rötha 8.5km (July 2013 to Late September 2019) [direction Leipzig]projectmap
A94: AS Pastetten – AS Dorfen 17.4km (April 2012 to October 2019) – projectmap
A94: AS Dorfen – AS Heldenstein 14.9km (July 2013 to October 2019) – projectmap
B50: AS Platten – east of AS Lösnich 19.9km (July 2009 to Early November 2019) – projectmap
B75: AS Hamburg-Georgswerder – AS Hamburg-Wilhelmsburg-South (A26) 4.8km (October 2016 to November 2019) [rededication of A252/A253: 6.0km]projectmap
A46: AS Bestwig – AS Nuttlar 5.6km (September 2009 to Late 2019) – ? – map
B10: AS Hinterweidenthal – east of Hinterweidenthal 1.3km (September 2013 to Late 2019) – projectmap
B15n: AS Ergoldsbach – AS Essenbach (A92) 9.0km (August 2013 to Late 2019) – projectmap
B30: AS Ravensburg-South – AS Karrer 3.4km (July 2013 to Late 2019) – projectmap
B47: AS Worms-West – AS Worms-Horchheimer Straße 1.1km (August 2016 to Late 2019) – projectmap
B51: AS Belm-Vehrte – AS Belm-Icker 2.0km (February 2015 to Late 2019) – projectmap
B318: AS Holzkirchen (A8) – AS Holzkirchen 1.5km (June 2017 to Late 2019) – projectmap
A33: AS Borgholzhausen – north of AS Halle 7.9km (December 2012 to >= Late December 2019) – projectmap

2020 opening:

B2: south of Untersteinach – AS Mauk 4.1km (December 2016 to Spring 2020) – projectmap
B47: east of Rosengarten – east of AS Bürstadt (B44) 2.6km (December 2018 to August 2020) [2nd c/w] – projectmap
A14: AS Tangerhütte – AS Colbitz 8.5km (August 2017 to November 2020) – projectmap
B286: AS Schweinfurt-Center (A70) – AS Schwebheim 3.1km (July 2017 to 2020) [2nd c/w] – projectmap
B236: Dortmund-Aplerbecker Mark – AS Dortmund/Schwerte (A1) 1.7km (August 2018 to Fall 2020) – projectmap
A98: AD Hochrhein – AS Rheinfelden-Karsau 2.5km (March 2009 to Late 2020) – projectmap
A524: west of AS Duisburg-Huckingen – west of AK Duisburg-South (A59) 1.2km (June 2017 to Late 2020) – ? – map
B31: Immenstaad – Friedrichshafen/Waggershausen 7.1km (November 2014 to Late 2020) – projectmap
B33: east of AS Allensbach-West – AS Allensbach-Center 2.4km (November 2015 to Late 2020) – projectmap
B85: east of Regen bridge – Piendling 1.7km (July 2017 to Late 2020) – projectmap
B303: east of AS Schirnding-West – west of AS Schirnding-East 2.5km (July 2017 to Late 2020) [2nd c/w] – projectmap
B51: AS Münster-Warendorfer Straße (B481) – AS Münster-Wolbecker Straße 2.7km (June 2015 to >= 2020?) – projectmap

2021 opening:

B27: AS Donaueschingen – AS Hüfingen (B31) 4.1km (June 2016 to Spring 2021) – projectmap
A14: AS Lüderitz – AS Tangerhütte 14.8km (August 2018 to 2021) – projectmap
A44: AK Ratingen-East (A3) – AS Heiligenhaus 4.0km (September 2016 to 2021) – projectmap
A44: AS Waldkappel – AS Ringgau 7.9km (July 2016 to 2021) – projectmap
B49: AS Tiefenbach – AS Leun 2.1km (August 2016 to 2021) – projectmap
B66: AS Leopoldshöhe-Rollkrug – AS Leopoldshöhe-Asemissen 2.1km (August 2017 to 2021) – ? – map
A448: rededication AS Bochum-Wiemelhausen – AS Altenbochum (West) 0.9km (Late 2021) – projectmap
A448: AS Altenbochum (West) – AS Altenbochum (East) 1.9km (October 2012 to Late 2021) – projectmap
B2: AS Oberau-North – AS Oberau-South 4.2km (September 2015 to Late 2021) – projectmap
B49: AS Solms – AS Oberbiel-East 3.2km (May 2010 to >= Late 2021) [~300m/~1000m in service since 2014/15]projectmap

2022 opening:

A26: AS Jork – AS Buxtehude 4.5km (Summer 2006 to Early 2022) – projectmap
A26: AS Buxtehude – AS Neu Wulmstorf 4.1km (September 2013 to Early 2022) – projectmap
A44: AS Helsa-East – AS Hessisch Lichtenau-West 6.1km (May 2010 to Early 2022) – projectmap
A49: AS Neuental – AS Schwalmstadt 11.8km (March 2011 to Mid 2022) – projectmap
A100: AD Neukölln – AS Am Treptower Park 3.2km (May 2013 to 2022) – projectmap
A21: Klein Barkau – north of Nettelsee 6.2km (September 2018 to 2022) – projectmap
A21: north of Nettelsee – north of AS Nettelsee ~2km (Early 2018 to 2022) – projectmap
A44: AS Sontra-East – AD Wommen (A4) ~7.5km (August 2017 to 2022) – projectmap
A94: north of AS Malching – north of AS Kirchham 6.0km (June 2016 to 2022) – projectmap
B47: AS Worms-Horchheimer Straße – AS Worms-South 1.2km (February 2018 to 2022) – projectmap
B85: east of Altenkreith – east of Regen bridge 1.7km (July 2017 to 2022) – projectmap
B33: Hegne – Waldsiedlung 1.2km (Januar 2019 to Late 2022) – projectmap

2023 opening:

B10: west of AS Neu-Ulm-Finningen – east of AS Nersingen (A7) 5.5km (May 2018 to Early 2023) [2nd c/w] – projectmap
A40: rededication AS Dortmund-East (B236) – AK Dortmund/Unna (A1/A44) 9.5km (Spring 2023) – projectmap
A661: AS Frankfurt-Friedberger Landstraße – AS Frankfurt-East 2.2km (November 2007 to 2023) [2nd c/w] – projectmap

2024 opening:

A44: AS Ringgau – AS Sontra-West ~4km (Early 2017 to 2024) – projectmap
A44: AS Sontra-West – AS Sontra-East ~9km (June 2018 to 2024) – projectmap
A281: AS Bremen-Gröpelingen – AS Bremen-Seehausen 4.9km (January 2019 to Late 2024) – projectmap

2025 opening:

B58: east of Rhine bridge – Wesel-Schepersfeld (B70) 3.7km (July 2019 to 2025) – ? – map

2026 opening:

B10: AS Godramstein – AS Landau-North (A65) 4.1km (November 2018 to 2026) [2nd c/w] – projectmap
A72: AS Rötha – AK Leipzig (A38) 7.2km (November 2018 to Late 2026) – projectmap

__________________

Last edited by MichiH; July 14th, 2019 at 10:36 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:27 PM   #14
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Greece

2015 opening:

A1: Roditsa – Anthili (A3) 4km (2006 to 16th February 2015) – ? – map
A1: Raches – Agia Marina 19.2km (2007 to 16th March 2015) [direction Lamia] – ? – map
A1: Raches – Agia Marina 19.2km (2007 to 19th March 2015) [direction Larissa] – ? – map
A25: Provatas – Strymoniko ~10km (? to Late November 2015) – projectmap
A25: Neo Petritsi – Kamaroto ~10km (? to ~23rd December 2015) – projectmap

2016 opening:

A71: Leuktro (A7) – Sparti 46km (? to 18th April 2016) – projectmap
A27: Niki – Florina 14.5km (2011 to 20th May 2016) – projectmap
?: south of Nea Poteidaia – Kassandria 17.5km (2010 to 13th June 2016) – projectmap
A8: Kiato – Korinthos (A7) 25km (2008 to Early August 2016) – projectmap
A7: Thouria – Kalamata-Artemida 7.5km (? to 19th November 2016) – ? – map
A8: Xylokastro – Kiato 12km (2008 to 22nd December 2016) [1st c/w] – projectmap
A7: Kalamata-Artemida – Kalamata-East 1.2km (? to 23rd December 2016) – ? – map
A5: Amfilochia – Kouvaras 26km (2008 to 27th December 2016) – projectmap

2017 opening:

?: Naousa – Patrida 7.7km (2009 to 7th February 2017) – ? – map
A5: Avgo – Filippiada 38km (2008 to 22nd February 2017) – projectmap
A1: Skotina – Aegani 10km (2008 to 7th April 2017) – projectmap
A1: Pyrgetos – Evangelismos 14km (2008 to 7th April 2017) – projectmap
A8: Patra-Rio (A5/A9) – Xylokatro ~93km (2008 to 11th April 2017) – projectmap
A8: Xylokastro – Kiato 12km (2008 to 11th April 2017) [2nd c/w] – projectmap
A5: Kefalovryso – Klokova 37km (2008 to 12th April 2017) – projectmap
A5: Klokova – Antirrio 6.5km (2008 to 1st June 2017) – projectmap
A25: Kato Christos – Provatas ~11km (? to 2nd June 2017) – projectmap
?: Nea Moudania – north of Portes 4.2km (? to 2nd June 2017) – ? – map
A29: Krystalopigi – Koromilia 15km (2012 to 14th July 2017) – projectmap
A5: Sellades – Amfilochia 27km (2008 to 26th July 2017) – projectmap
A5: Ioannina (A2) – Avgo 12km (2008 to 3rd August 2017) – projectmap
A3: Trikala – Xyniada 79km (2008 to 22nd December 2017) – projectmap

2018 opening:

A90: Gournes – Chersonissos 9.5km (2014 to 4th April 2018) [2nd c/w] – ? – map

2019 opening:

A52: Aktio-Airport – Vonitsa-South 13km (2009 to 24th April 2019) – ? – map
EO65: Nea Santa – Assiros (A25) 11.4km (? to August 2019) – ? – map

2020 opening:

A3: Stavos – Anthili (A1) 14km (2008 to Late 2020) – ? – map

2021 opening:

A52: Prevazo Aktio Toll station – Aktio-Airport 2km (2009 to 2021) – ? – map
A52: Vonitsa-South – Ambraktia (A5) 35km (2009 to 2021) – ? – map
A3: Xyniada – Stavos 18km (2008 to Late 2021) – ? – map

2022 opening:

A5: Patra-Mintilogli – Varda 37.5km (2008 to Early 2022) – ? – map

Unknown opening date:

A3: Panagia (A2) – Trikala ~60km (2008 to suspended) – projectmap
A5: Varda – Pyrgos 37.5km (2008 to suspended) – ? – map

__________________

belerophon, EasySeven liked this post

Last edited by MichiH; May 5th, 2019 at 10:51 AM.
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:27 PM   #15
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Hungary

2014 opening:

M86: Szombathely – Vat 9.2km (September 2009 to 28th June 2014) – ? – map
M3: Vaja/Mateszalka – Vasarosnameny 11.9km (May 2013 to 10th October 2014) – projectmap

2015 opening:

M85: Kony – Enese 2.3km (June 2013 to 16th June 2015) – ? – map
M85: Rabapatona – Györ (M1) 6.8km (June 2013 to 16th June 2015) – ? – map
M43: Mako – HU/RO border (Nagylak) 23.1km (October 2012 to 11th July 2015) – projectmap
M60: Keszü – Pecs 1.8km (January 2014 to 31st July 2015) [1st c/w] – projectmap
M85: Csorna-East (M86) – Kony 5.8km (June 2013 to 9th September 2015) – ? – map
M86: Szilsarkany – north of Csorna-East (M85) 9.3km (June 2013 to 9th September 2015) – ? – map
M86: north of Csorna-East (M85) – north of Csorna 1.1km (June 2013 to 9th September 2015) [1st c/w] – ? – map
M86: Szeleste – Hegyfalu 7.5km (October 2013 to 18th September 2015) – ? – map

2016 opening:

M86: Hegyfalu – Szilsarkany 33.4km (October 2013 to 25th October 2016) – ? – map

2017 opening:

M35: Debrecen-South – Debrecen-Airport 5.4km (July 2016 to 13th December 2017) – ? – map
M85: Farad – Csorna-South (M86) 4.4km (Fall 2016 to 15th December 2017) – ? – map

2018 opening:

M30: SK/HU border (Tornyosnemeti) – Tornyosnemeti 1.7km (June 2016 to 16th January 2018) – ? – map
F8: Varpalota-West – Varpalota-East 9.4km (2014 to 9th March 2018) – ? – map
M4: Cegledbercel – Cegled 8.1km (April 2017 to 16th August 2018) – ? – map
M25: Eger-South – Andornaktalya 4km (June 2017 to 7th November 2018) – ? – map
M4: Berettyoujfalu (M35) – Berettyoujfalu-North 4km (July 2016 to 20th December 2018) – ? – map
M35: Debrecen-Airport – Berettyoujfalu (M4) 20.2km (July 2016 to 20th December 2018) – ? – map

2019 opening:

M44: Tiszakürt – Kondoros 62km (December 2016 to Summer 2019) – ? – map
M2: north of Vac-South – north of Dunakeszi/Fot 16km (May 2017 to 2019) [2nd c/w] – ? – map
M70: east of Tornyiszentmiklos – north of Csörnyeföld 5.0km (Fall 2017 to Fall 2019) [2nd c/w] – ? – map
M70: south of Csörnyeföld – north of Letenye 5.5km (Fall 2017 to Fall 2019) [2nd c/w] – ? – map
R67: south of Somogybabod – north of Kaposfüred 33.2km (Fall 2017 to Fall 2019) – ? – map
M4: Üllo – Cegledbercel 36.3km (April 2017 to December 2019) – ? – map

2020 opening:

M15: SK/HU border (Rajka) – Level (M1) 14km (February 2018 to March 2020) [2nd c/w] – ? – map
M4: Berettyoujfalu – HU/RO border (Nagykereki) 26.5km (July 2017 to Early 2020) – ? – map
M4: Abony-West – Abony-East 11.2km (March 2018 to Summer 2020) – ? – map
M25: Andornaktalya – Füzesabony 15km (March 2018 to Summer 2020) – ? – map
M76: Keszthely – Hollad (M7) 8.6km (February 2018 to 2020) – ? – map
M85: Sopron-North – Farad 57.5km (March 2018 to December 2020) – ? – map

2021 opening:

M44: Kondoros – Bekescsaba 18km (Early 2018 to January 2021) – ? – map
M8: AT/HU border (Szentgotthard) – Körmend-North 29km (March 2018 to Early 2021) [1st c/w] – ? – map
M30: Tornyosnemeti – Miskolc-East 56.7km (March 2018 to August 2021) – ? – map
M44: Lakitelek – Tiszakürt 9.9km (July 2018 to August 2021) – ? – map

2022 opening:

M4: Abony-East – Törökszentmiklos 24.9km (October 2013 to Early 2022) – ? – map

__________________

Last edited by MichiH; June 30th, 2019 at 12:46 PM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:28 PM   #16
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Iceland

No new motorway or expressway currently u/c


Ireland

2015 opening:

M11: Rathnew – Arklow-North 16.5km (June 2013 to 13th July 2015) – projectmap

2017 opening:

N17: Tuam-North – Tuam-West 4.2km (May 2014 to 27th September 2017) – projectmap
M17: Tuam-West – Rathmorrissy (M6) 25.5km (May 2014 to 27th September 2017) – projectmap
M18: Rathmorrissy (M6) – Gort 27.7km (May 2014 to 27th September 2017) – projectmap

2019 opening:

M11: Clough – Enniscorthy-South 27km (October 2015 to 18th July 2019) – projectmap

__________________

belerophon, keokiracer, EasySeven liked this post

Last edited by MichiH; July 14th, 2019 at 10:37 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:28 PM   #17
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Italy

2014 opening:

SS727: Forli (A14) – Forli-Zona Industriale 4.4km (June 2012 to 26th June 2014) – projectmap
A31: Albettone/Barbarano – Agugliaro 6.6km (September 2005 to 1st July 2014) – projectmap
A35: Melzo (A58) – Rovato (SP19) 49.8km (Summer 2009 to 23rd July 2014) – projectmap
A35: Rovato (SP19) – east of Brescia-West (A4) 6km (Summer 2009 to 23rd July 2014) [1st c/w; w/o A4 i/c] – projectmap
A58: Pozzuolo Martesana (SP103) – Comazzo 7km (June 2012 to 23rd July 2014) – projectmap
SP14 Milan: Segrate – Vignate 6.7km (2010 to 23rd July 2014) – projectmap
SP14 Milan: Vignate – Liscate (A58) 5.2km (2010 to 23rd July 2014) – projectmap
SP103 Milan: Pioltello - Pozzuolo Martesana (A58) 6.8km (2008 to 23rd July 2014) – projectmap
SS106: Nova Siri Scalo bypass 5km (September 2011 to 5th November 2014) – projectmap
A31: Santa Margherita d'Adige – Badia Polesine (SS434) 18km (September 2005 to 15th December 2014) – projectmap

2015 opening:

SS77: Colfiorito – Bavareto 9km (November 2009 to 16th January 2015) – projectmap
A60: Azzate Buguggiate (A8) – Ponte di Vedano (SS712) 4.5km (2010 to 25th January 2015) – projectmap
A36: Cassano Magnago (A8) – Lomazzo (A9) 15km (February 2010 to 26th January 2015) – projectmap
Strada a Mare Guido Rossa: Genoa-Cornigliano – Genoa-Sampierdarena 1.6km (February 2011 to 7th February 2015) – ? – map
A31: Noventa Vicentina – Santa Margherita d'Adige 7km (September 2005 to 23rd March 2015) – projectmap
A52: Fiera di Milano (A8) – Novate Milanese ~2km (April 2014 to 27th April 2015) – projectmap
A58: Ornate (A4) – Pozzuolo Martesana (SP103) 9km (2012 to 16th May 2015) – projectmap
A58: Comazzo – Cerro al Lambro (A1) 17km (2012 to 16th May 2015) – projectmap
A59: Grandate (A9) – Albate 3km (2010 to 23rd May 2015) – projectmap
SP415 Lodi: Spino d'Adda – Dovera 6.5km (July 2013 to 22nd June 2015) – projectmap
SS106: Roccella Jonica-Canne – Gioiosa-East 8km (May 2013 to 9th July 2015) – projectmap
SS106: Gioiosa-East – Gioiosa Jonica 4km (September 2011 to 9th July 2015) – projectmap
A12: south of Mignone bridge – Civitavecchia-Aurelia 4km (October 2011 to 17th July 2015) – projectmap
A12: Tarquinia-Tuscania-Viterbo – south of Mignone bridge 10.5km (October 2011 to 31st July 2015) – projectmap
A31: Agugliaro – Noventa Vicentina 6km (September 2005 to 31st August 2015) – projectmap
A36: Lomazzo (A9) – Lentate sul Seveso (SS35) 7.5km (October 2012 to 5th November 2015) – projectmap
A1: Aglio – Barberino 6.1km (2004 to 5th December 2015) [2nd c/w] – projectmap
A1var: La Quercia – Aglio 37km (2004 to 23rd December 2015) – projectmap

2016 opening:

SS729: Codrongianos (SS131) – Ardara 11.8km (September 2013 to 23rd June 2016) – projectmap
SS729: Monti/Telti – west of Olbia-South (SS131DCN) 15.5km (December 2013 to 23rd June 2016) – projectmap
SS640: east of Caltanissetta-Xirbi – west of Caltanissetta (SS626) 5km (April 2012 to 8th July 2016) – projectmap
SS223: north of Palazzo Lama – Palazzo Lama ~3km (2013 to 14th July 2016) – projectmap
SS77: Foligno (SS3) – Colfiorito 19km (November 2009 to 28th July 2016) – projectmap
SS77: Bavareto – Pontelatrave 8km (November 2009 to 28th July 2016) – projectmap
SS318: Casacastalda – Valfabbrica 6.8km (< 2007 to 28th July 2016) [~4km 1st c/w only] – projectmap
SS318: Valfabbrica – Pianello 8.5km (2009 to 28th July 2016) – projectmap
SS16: Maglie – west of Otranto 12.7km (June 2013 to 5th August 2016) – ? – map
SS16: west of Otranto – Otranto 1.4km (June 2013 to 17th November 2016) – ? – map
SS223: Palazzo Lama – south of Palazzo Lama ~1km (2013 to 22nd November 2016) – projectmap

2017 opening:

SS223: Casale di Pari – Lampugnano 3.7km (2013 to 1st March 2017) – projectmap
SS640: Agrigento – Canicatti 32.2km (March 2009 to 28th March 2017) [partially opened in 2015] – projectmap
SS729: east of Martis – west of Ozieri 2.8km (August 2014 to 29th April 2017) – projectmap
SS729: west of Olbia-South (SS131DCN) – Olbia-Airport 2.5km (June 2012 to 31st July 2017) – projectmap
SS534: Spezzano Albanese-Terme – east of Doria 7.5km (March 2014 to 4th August 2017) [2nd c/w] – ? – map
SS76: Fossato di Vico – Cancelli di Fabriano 7.5km (Early 2009 to 7th August 2017) [1st c/w] – projectmap
SS195: Sarroch-North – Sarroch 2km (? to 12th August 2017) – ? – map
SS223: south of Palazzo Lama – north of Casale di Pari 1.8km (2013 to 24th August 2017) – projectmap
SS96 Barese: north of Altamura – Mellitto 10km (December 2013 to 8th September 2017) – ? – map
SS640: east of Cannemaschi – Caltanissetta-Favarella 8.5km (April 2012 to 25th September 2017) – projectmap
A35: Rovato (SP19) – west of Brescia-West (A4) 5.6km (January 2017 to 13th November 2017) [2nd c/w] – projectmap
SS729: Martis (SS132) – east of Martis ~2km (August 2014 to 20th December 2017) – projectmap
SS729: west of Ozieri – west of Oschiri ~7km (August 2014 to 20th December 2017) – projectmap

2018 opening:

SS640: east of Caltanissetta-Favarella – Caltanissetta-Sanatorio 2.7km (April 2012 to 20th January 2018) – projectmap
SS223: north of Casale di Pari – Casale di Pari 2.5km (2013 to 29th March 2018) – projectmap
SS534: east of Sibari (A2) – Spezzano Albanese-Terme 5.6km (March 2014 to 8th August 2018) – ? – map
SS534: Sibari (A2) – east of Sibari (A2) 0.9km (March 2014 to 5th December 2018) – ? – map
SS675: Monte Romano-East – Cinelli 6.4km (July 2015 to 13th December 2018) – projectmap

2019 opening:

SS96 Barese: Toritto – Modungo/Bitetto 9km (December 2013 to Early April 2019) – ? – map
SPV: Thiene (A31) – Breganze-West 5km (November 2011 to 3rd June 2019) – projectmap
SS96 Barese: Altamura-South (SS99) – north of Altamura 3.4km (October 2015 to 5th July 2019) [2nd c/w] – ? – map
SS99 Barese: Altamura-South (SS96) – south of Altamura-South 1.0km (October 2015 to 5th July 2019) – ? – map
SP103 Milan: Segrate (A51) – Segrate 1.3km (October 2017 to September 2019) – projectmap
SPV: Mussolente/Loria – Riese 3.5km (October 2014 to October 2019) – projectmap
A52: rededication Novate Milanese – Paderno Dugnano (SS35) ~6km (2019) – projectmap
SS729: Berchidda – Monti-West 9.4km (June 2014 to 2019) – projectmap
SS729: Monti-West – Monti/Telti 6.4km (February 2015 to 2019) – projectmap
SS106: west of Palizzi Marina – east of Palizzi Marina 3.8km (August 2006 to 2019?) – projectmap
SS195: Sarroch – Pula 4km (December 2011 to 2019?) – ? – map
SS640: Caltanissetta-Favarella – east of Caltanissetta-Favarella 1km (April 2012 to 2019?) – projectmap
SS640: Caltanissetta-Sanatorio – east of Caltanissetta-Xirbi 9km (April 2012 to 2019?) – projectmap
SS640: west of Caltanissetta (SS626) – Caltanissetta (A19) 3km (April 2012 to 2019?) – projectmap

2020 opening:

A15: Trecasali – Parma (A1) 9.5km (September 2016 to February 2020) – ? – map
SR8: Taranto-North – Taranto-South 4.5km (? to March 2020) – ? – map
SS96 Barese: Mellitto – Toritto 5.4km (March 2010 to Early 2020) – ? – map
SS729: Ardara – Martis 12.4km (Spring 2017 to Mid 2020) – ? – map
SS729: west of Oschiri – Berchidda 9.5km (Spring 2017 to Mid 2020) – ? – map
SPV: Montecchio/Arzignano – Castelgomberto 9.8km (April 2014 to Summer 2020) – projectmap
SPV: Breganze-West – Marostica 9km (April 2014 to September 2020) – projectmap
SPV: Marostica – Bassano-East (SS47) 8.5km (February 2013 to September 2020) – projectmap
SPV: Bassano-East (SS47) – Mussolente/Loria 5km (April 2014 to September 2020) – projectmap
SPV: Riese – Montebelluna-East 20.2km (October 2014 to September 2020) – projectmap
SPV: Montebelluna-East – Spresiano 13.6km (? to Late 2020) – projectmap
SPV: Malo – Thiene (A31) ~7km (April 2014 to 2020/21) – projectmap
SPV: Montecchio Maggiore (A4) – Montecchio Maggiore (SR11) 1.0km (April 2014 to 2020/22) – projectmap

2021 opening:

SPV: Spresiano – Spresiano (A27) 2.5km (? to May 2021) – projectmap
SS172: San Paolo – Orimini 4.5km (July 2018 to August 2021) – ? – map
SPV: Castelgomberto – Malo 9.1km (October 2014 to Fall 2021) – projectmap

2022 opening:

A18: Rosolini – Ispica/Pozzallo 8km (June 2014 to Early 2022) – projectmap
A18: Ispica/Pozzallo – Modica 11km (June 2014 to Early 2022) – projectmap

Unknown opening date:

SP1 BT: Andria-North-East – Trani-North (SS16bis) 7.5km (January 2014 to ?) – ? – map
SS76: Fossato di Vico – Cancelli di Fabriano 7.5km (Early 2009 to suspended) [2nd c/w] – projectmap
SS76: Albacina – Serra San Quirico 11km (Early 2009 to suspended) [2nd c/w] – projectmap

__________________

Last edited by MichiH; July 7th, 2019 at 09:33 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:29 PM   #18
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Kosovo

2015 opening:

?: Prishtina (R6/R7) – Prishtina-South (N2) 3km (October 2014 to 25th October 2015) – ? – map

2016 opening:

N9: Kijeve – Gjergjice 6.7km (June 2014 to Mid 2016) – ? – map
R6: Prishtina (R7) – Babush 20.4km (October 2014 to 31st December 2016) – projectmap

2017 opening:

R6: Babush – Ferizaj 11.1km (October 2014 to 22nd December 2017) – projectmap

2018 opening:

R6: Ferizaj – Doganaj 10.5km (October 2014 to 14th June 2018) – projectmap

2019 opening:

R6: Doganaj – Hani i Elezit 18.2km (October 2014 to 29th May 2019) – projectmap

2020 opening:

N2: Smrekonice – Vushtrri-East 4.6km (May 2018 to 2020) – ? – map
R7.1: Banuelle – Bresalc 22.3km (April 2018 to Late 2020) – ? – map

__________________

belerophon, keokiracer, EasySeven, ntom liked this post

Last edited by MichiH; June 15th, 2019 at 01:37 PM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:29 PM   #19
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Latvia

2014 opening:

A12: Ludza – Nirza 17.8km (2008 to 1st October 2014) [1st c/w] – projectmap


Lithuania

2016 opening:

A2: Pasilaiciai – Pilaite 5.4km (July 2015 to 20th December 2016) – ? – map

2017 opening:

A5: Sasnava – Gudeliai 9.8km (May 2016 to August 2017) – ? – map

2018 opening:

A5: Sasnava-South – Sasnava 8km (September 2017 to September 2018) – ? – map
A5: Pietariai – Sasnava-South 4km (September 2017 to October 2018) – ? – map
A5: Gudeliai – Mauruciai 12km (Early 2018 to Late October 2018) – ? – map


Luxembourg

2015 opening:

A7: Lorentzweiler – Waldhaff 8.5km (2003 to 23rd September 2015) – projectmap

2016 opening:

A13: west of Hellange – east of Hellange 1.4km (October 2014 to 5th September 2016) [1st c/w] – ? – map
B40: Belval – L/F border (Belval) 1.4km (2006 to 16th December 2016) – ? – map
A13: west of Hellange – east of Hellange 1.4km (October 2014 to 17th December 2016) [2nd c/w] – ? – map

2022 opening:

B40: Esch (A4) – Belval 1.4km (? to 2022) – ? – map

__________________

belerophon, EasySeven liked this post

Last edited by MichiH; November 4th, 2018 at 11:01 AM.
MichiH no está en línea   Reply With Quote
Old November 14th, 2015, 03:30 PM   #20
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,854
Likes (Received): 2856

Moldova

No new motorway or expressway currently u/c


Montenegro

2020 opening:

A1: Matesevo – Podgorica-North (M2) 41.0km (May 2015 to Spring 2020) – projectmap

__________________

Last edited by MichiH; February 17th, 2019 at 09:15 AM. Reason: Please refer to the edit list
MichiH no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:50 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us