Old May 7th, 2018, 09:24 AM   #9801
pasadia
Registered User
 
pasadia's Avatar
 
Join Date: Jun 2013
Location: Brasov / Kronstadt, RO
Posts: 2,390
Likes (Received): 2068

Quote:
Originally Posted by Le Clerk View Post
What appeals? Against the awards?
We already have appeals against decision taken during tender evaluation period (Tirenna Scavi or PORR disqualification for stupid reasons). So yes, it will take some time before this decision will be final and contracts would be signed (smth like 10 to 15 months).
pasadia no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old May 9th, 2018, 02:22 PM   #9802
Theijs
Registered User
 
Theijs's Avatar
 
Join Date: Aug 2012
Posts: 499
Likes (Received): 152

[RO] Romania | road infrastructure • autostrăzi şi drumuri

I checked the movies of Lugoj-Deva Lot 3 & Lot 4.
I couldn’t trace back in the movies where these lots do connect.

Any realistic moment in sight when a section between two exits will open?
Theijs no está en línea   Reply With Quote
Old May 11th, 2018, 07:58 AM   #9803
pasadia
Registered User
 
pasadia's Avatar
 
Join Date: Jun 2013
Location: Brasov / Kronstadt, RO
Posts: 2,390
Likes (Received): 2068

Quote:
Originally Posted by marty11 View Post

One more video, A1 Lugoj - Deva L3

In this movie, at the very beginning there is a sector with markings done - that sector is the western part of Lot IV (Ilia - Deva / Soimus). After that is the eastern end of Lot III (Holdea - Ilia), without markings. So that is connection point.

Realistic moment - I would say summer of 2019, and that it would be open together, both lots, from Holdea to Soimus. At Holdea is U/C a provisional I/C, then there are 2 I/C at Decea and Ilia, and then there si the current I/C near Deva.
This predictions depends on bureaucratic disput to be solved between CNAIR (our road company) and Comsa (constructor for Lot III) and also on the working progress around Soimus hill (eastern part of Lot IV).
__________________

wkiehl101 liked this post
pasadia no está en línea   Reply With Quote
Sponsored Links
Advertisement
 
Old May 13th, 2018, 10:18 PM   #9804
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A3 Gilău Bridge

__________________

lampsakos21, AlexisMD liked this post
marty11 no está en línea   Reply With Quote
Old May 15th, 2018, 05:23 PM   #9805
belerophon
Registered User
 
Join Date: Nov 2014
Location: next to Chemnitz
Posts: 240
Likes (Received): 76

Quote:
Originally Posted by marty11 View Post
A3 Gilău Bridge

Finally !!!
__________________
Been in: A, AL, BG, BIH, CGO, CH, CZ, D, DK, (F), FL, H, HR, I, IL, JOR, LT, LV, MK, N, PL, RO, SK, SLO, SRB.

Drove my car everywhere except: IL, JOR
belerophon no está en línea   Reply With Quote
Old May 17th, 2018, 05:52 PM   #9806
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A10 L1









Credit: Alba County local newspaper "Unirea"

Last edited by marty11; May 18th, 2018 at 07:38 PM.
marty11 no está en línea   Reply With Quote
Old May 17th, 2018, 06:07 PM   #9807
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030









And another cool video by "Ziarul Unirea"

__________________

Luki_SL liked this post

Last edited by marty11; May 17th, 2018 at 10:00 PM.
marty11 no está en línea   Reply With Quote
Old May 17th, 2018, 08:00 PM   #9808
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A10 L2









__________________

Luki_SL liked this post
marty11 no está en línea   Reply With Quote
Old May 23rd, 2018, 03:35 PM   #9809
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A33 Gilau Bridge

__________________

simondanut liked this post
marty11 no está en línea   Reply With Quote
Old June 2nd, 2018, 07:42 PM   #9810
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A1 Lugoj - Deva L4



A10 L1

__________________

gr_kanev, simondanut liked this post
marty11 no está en línea   Reply With Quote
Old June 6th, 2018, 11:37 PM   #9811
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A3 Campia Turzii - Targu Mures Airport



Credit: API
marty11 no está en línea   Reply With Quote
Old June 10th, 2018, 06:18 PM   #9812
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A3 Gilau Bridge



Credit: Alexandruduma @ forum.peundemerg.ro.
marty11 no está en línea   Reply With Quote
Old June 10th, 2018, 06:50 PM   #9813
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

A1 Lugoj - Deva L3. New section of DN68A (overpass, roundabout) is now open to traffic, so the old section can now be demolished, in order to continue motorway work.



Credit: gruiarew @ forum.peundemerg.ro/.

It's this area right here (older photos):



__________________

simondanut, Robertkc, SRC_100 liked this post

Last edited by marty11; June 10th, 2018 at 09:46 PM.
marty11 no está en línea   Reply With Quote
Old June 25th, 2018, 08:38 PM   #9814
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 5,427
Likes (Received): 2606

Quote:
Originally Posted by MichiH View Post
A10: Turda (A3) – Decea 16.8km (July 2014 to >= May2018) – ? – map
A10: Decea – Aiud 8.5km (July 2014 to >= May 2018) – ? – map
A1: Holdea – Ilia ~21km (2013 to Mid 2018) – ? – map
A3: Bucharest Ring Road – Voluntari-Popasului Street 4.5km (April 2012 to 2018) – ? – map
A3: Voluntari-Popasului Street – Bucharest-Gherghitei Street 2.0km (April 2012 to 2018) – ? – map
A3: Nadaselu – Gilau 9.5km (July 2014 to Late 2018) – ? – map
The opening of both A10 sections is now postponed to July 2018. Both A3 sections north of Bucharest and the A3 section west of Cluj are expected to be opened in August 2018.

https://adevarul.ro/locale/alba-iuli...636/index.html

I'm not sure about the A1 section. Is there any reliable estimate? The article also reports about possible A3 section completions b/n Turda and Targu Mures in 2018...
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **


Been/driven: A, AND, B, BIH, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, HR, I, IRL, L, LV, LT, M, N, NL, P, PL, RO, RSM, S, SK, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old June 26th, 2018, 12:00 PM   #9815
pasadia
Registered User
 
pasadia's Avatar
 
Join Date: Jun 2013
Location: Brasov / Kronstadt, RO
Posts: 2,390
Likes (Received): 2068

Quote:
A10: Decea – Aiud 8.5km
Work on this segment ended in november 2017. Since there the only work done were to exchange some 200m of asphalt on southern edge (where there will be no traffic in next years. Atm, our state entity, CNAIR, says that there are quality problems and they still have to do some testing, but all of us thinks that this is BS. Opening was said to be done in november 2017, then in January, March, May, June and now, maybe, July 2018. But none knows for sure.

Quote:
A10: Turda (A3) – Decea 16.8km
Also works pretty much over since winter. See a new video here:



No reason is given, but opening depends on previous segment as Decea I/C is on that segment.

Quote:
A3: Bucharest Ring Road – Voluntari-Popasului Street 4.5km (April 2012 to 2018) – ? – map
A3: Voluntari-Popasului Street – Bucharest-Gherghitei Street 2.0km (April 2012 to 2018) – ? – map
Well, here works are going quite slow. I would say that there is no chance for an opening in 2018.

Quote:
A1: Holdea – Ilia ~21km (2013 to Mid 2018)
Also, very, very slim chances to have an opening in 2018 as there is a slow pace and some bereucratic problems with aditional works sorrounding Holdea I/C.
Opening this segment probably will be on the same date with segment form Ilia to Soimus, in 2019.

And between Campia Turzii and Targu Mures, on A3, there are some segment with some chances to be ready in 2018, but opening them depends on works for Iernut I/C (works which started only in february 2018). If they will be done around this I/C, then there are some chances for an opening from Iernut to Ungheni (Targu Mures airport). Very slim chances, I must add.

Also, please keep in mind that formally, on December 1st, there will be anniversary of 100 years since "Great Union", national holiday of Romania. Some speculate that some segment opening is postponed on porpose until then (make a big splash / public event for our politicians). These could be true for:
- A10, Aiud - Decea and Decea - Turda
- A3, Iernut - Ungheni, Bucharest - Bucharest ring and Gilau - Nadaselu (including bridge over Somes at Gilau)
- A1, Holdea - Soimus (very slim chances, probably with U/C solutions around Soimus area)
__________________

MichiH liked this post

Last edited by pasadia; June 26th, 2018 at 01:34 PM.
pasadia no está en línea   Reply With Quote
Old June 29th, 2018, 08:39 AM   #9816
Theijs
Registered User
 
Theijs's Avatar
 
Join Date: Aug 2012
Posts: 499
Likes (Received): 152

Quote:
Originally Posted by pasadia View Post
works pretty much over since winter...

Also, please keep in mind that formally, on December 1st, there will be anniversary of 100 years since "Great Union", national holiday of Romania. Some speculate that some segment opening is postponed on porpose until then (make a big splash / public event for our politicians). These could be true for:
- A10, Aiud - Decea and Decea - Turda
- A3, Iernut - Ungheni, Bucharest - Bucharest ring and Gilau - Nadaselu (including bridge over Somes at Gilau)
- A1, Holdea - Soimus (very slim chances, probably with U/C solutions around Soimus area)

Well, we all know how incompetent the current PSD elite is when it comes to economy & infrastructure.

It took me a while to understand the ratio behind this quote from the minister of Transport:


PSD politicians blame western companies for everything the own government is incompetent, so they want the companies to leave. Than you get this quote:
"When we'll have highways will have bigger pay checks and the multnational companies will leave".

So besides 100 years of Romania, elections in 2019 you have the fact that the government doesn’t want to open highways.

Or do I get something wrong here?
__________________

anitzei, marty11 liked this post
Theijs no está en línea   Reply With Quote
Old June 30th, 2018, 01:25 AM   #9817
sponge_bob
Registered User
 
Join Date: Aug 2013
Posts: 5,458
Likes (Received): 3318

So Dacia (and Ford) say they need proper roads or they might have to relocate as just in time supplies are problematic in Romania and the Minister of Transport then says that proper roads lead to higher salaries and they will leave anyway.

Crazy crazy shite that.
__________________
sponge_bob no está en línea   Reply With Quote
Old July 4th, 2018, 11:39 AM   #9818
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030

Quote:
Originally Posted by pasadia View Post
Also works pretty much over since winter. See a new video here:

And a road level video. Looks good and ready. They should open it at once ffs.

__________________

gr_kanev, PascalPascal2010 liked this post
marty11 no está en línea   Reply With Quote
Old July 4th, 2018, 12:22 PM   #9819
marty11
Registered User
 
Join Date: Jan 2018
Location: București, RO
Posts: 202
Likes (Received): 1030



LOT 3, same exact situation. Maybe they just don't want to open it to traffic in fear that the multinational corporations would then leave the country. And they would no longer get that tax money needed to finance those ridiculous wage&pension raises promised during the last electoral campaign (which got them to win the elections, in the first place).

From above:



Road-level:



Credit: Alexandru Duma
__________________

gr_kanev liked this post

Last edited by marty11; July 4th, 2018 at 12:34 PM.
marty11 no está en línea   Reply With Quote
Old July 5th, 2018, 10:24 PM   #9820
rudiwien
Registered User
 
Join Date: Jan 2015
Posts: 1,437
Likes (Received): 1695

A3 Gilău Bridge is almost fully paved (source: API)

__________________

gr_kanev, AlexisMD liked this post
rudiwien no está en línea   Reply With Quote
Sponsored Links
Advertisement
 


Reply

Tags
highways, infrastructure, motorways, romania

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
[PK] Pakistan | road infrastructure Edwardes Highways & Autobahns 881 January 14th, 2019 07:21 AM
The Romanian Athenaeum | Bucharest, Romania Raine Industrial Ages 40 March 20th, 2015 06:28 PM
Polish Highways and Motorways <New Topic> DJRexxx Eastern Europe / Balkans 81 July 20th, 2007 01:32 AM


All times are GMT +2. The time now is 03:03 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2019, vBulletin Solutions Inc.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us