SkyscraperCity Forum banner

Discussions Showcase Albums Media Media Comments Tags

1-2 of 205 Results
  1. Highways & Bridges
    Alignment: Details: Length: 62.764 Kms. ROW: 35-90m (90m throughout on greenfield section). Design Speed: 100 on brownfield section. 120 km/h on greenfield section. Configuration: 6 lanes(greenfield portion expandable to 8 lanes). Paved carriageway specifications: 15m with 3.75m lanes and a...
  2. Subways and Urban Transport
    The Lucknow Metro (Hindi: लखनऊ मेट्रो) is an under construction rapid transit system in the city of Lucknow, India. Construction on the first phase began on 27 September 2014. Lucknow Metro Rail Corporation Limited or LMRC is responsible to build and operate this network. The metro project will...
1-2 of 205 Results
Top