Yapı Merkezi Construction and Industry Inc. - Doppelmayr Tramways Ltd. Consortium has been awarded the Taksim - Kabataş Funicular System Construction and Electrical Works after the negotiation held on May 28th, 2002. The Project was tendered on a turn-key basis by Greater City Municipality of Istanbul Engineering Department on January 22nd, 2002.
The tender award decision was taken June 7th, 2002 by the Council of the Greater City of İstanbul and the approval by the Mayor was received on June 17th, 2002. The Contract was signed and approved by the Notary on July 12th, 2002 and approved by the Court of Accounts on August 5th, 2002. The project will be financed by the Greater City Municipality through its own funds and will be completed in 18 months. Following the completion of the construction and installation works, maintenance and supervision services will be provided for 12 months. Within the Project; design works, construction and finishing works of Kabataş underground station which will be constructed by cut-cover method, construction and finishing works of Taksim underground station which will be constructed partly by deep tunnel method and partly by cut-cover method, 520 meters long deep tunnel construction between the stations, track works, electrical and mechanical works, communication system, supply and installation of escalators and disabled elevators will be undertaken by Yapı Merkezi Construction and Industry Inc.
Supply and installation of two funicular cars, complete drive system, ropes, rope sheaves and tensioning system and related design works will be undertaken by Dopplemayr Tramways Ltd.
A two-storey car-park having a total construction area of 6,640 sqm and capacity of 171 cars is plaanned to be built next to the Kabataş Station.


TEKNİK PARAMETRELER / TECHNICAL PARAMETERS

Güzergah Parametreleri / Alignment Parameters

Kabataş İstasyonu Ray Kotu / Rail Level at Kabataş Station : -11.10 m
Taksim İstasyonu Ray Kotu / Rail Level at Taksim Station : +63.85 m
Kot Farkı / Difference of Levels : 74.95 m
Maksimum Eğim / Maximum Slope : % 22.19
İstasyonlardaki Eğim / Slope at Stations : % 5.00
Toplam Uzunluk / Total Length : 640.45 m
Toplam Derin Tünel Uzunluğu / Total Length of Deep Tunnel : 545.57 m
Çift Hat Tünel Uzunluğu / Length of Double Track Tunnel : 200.00 m
Tek Hat Tünel Uzunluğu / Length of Single Track Tunnel : 294.57 m
Taksim İstasyon Tüneli Uzunluğu / Length of Taksim Station Tunnel : 51.00 m
Toplam Aç-Kapa Tünel Uzunluğu / Total Length of Cut-Cover Tunnel : 97.84 m
Trenin Katedeceği Yol Uzunluğu / Length of Line to be Traveled by the Train : 558.49 m
Peron Boyu / Length of Platform : 40 m
Kabataş İstasyonu Toplam Alanı / Total Area of Kabataş Station : 3,228 m2
Taksim İstasyonu Toplam Alanı / Total Area of Taksim Station : 2,332 m2

İşletme Parametreleri / Operational Parameters

Sistem Kapasitesi / System Capacity : 7500 yolcu / saat / yön

passengers / hour / direction
Maksimum Hız / Maximum Speed : 10 m / saniye m / seconds
Yolculuk Zamanı / Total Travel Time : 110 saniyeseconds
İstasyonlarda Durma Süresi / Stopping Time at Stations : 70 saniyeseconds
Araç Sıklığı / Headway : 180 saniyeseconds

Araç Parametreleri / Vehicle Parameters
Araç Boyu / Length of Vehicle : 34.52 m
Araç Genişliği / Width of Vehicle : 2.90 m
Araç Yüksekliği / Height of Vehicle : 3.50 m
Araç Yolcu Kapasitesi / Passenger Capacity of Vehicle : 375 yolcu (48 oturan, 327 ayakta)

passengers (48 seated, 327 standing)

Araç Ağırlığı (boş) / Weight of Vehicle (empty) : 40 ton
Araç Ağırlığı (AW2 - 7 yolcu/m2) / : 75.4 ton
Weight of Vehicle (AW2 - 7 passengers/sqm)
 

·
re re re ra ra ra
Joined
·
4,521 Posts
Are there any construction updates? (pics, info etc..)
 

·
Super Member
Joined
·
5,274 Posts


pic:funimag.com

Taksim-4'üncü Levent Metro Hattı'nı Kabataş'ta deniz ve raylı sisteme bağlayacak olan Taksim-Kabataş tramvayı, 29 haziranda devreye girecek.

Kabataş İDO iskelesi önünde yapılacak törenle hizmete alınacak sistem sayesinde Taksim-Kabataş arası 110 saniyeye inecek.

Taksim-4'üncü Levent Metro Hattı'nı Kabataş'ta deniz ve raylı sisteme bağlayan Taksim-Kabataş tramvayı (füniküler sistemi), İstiklal caddesi ile Karaköy arasında 131 yıl önce hizmete giren tarihi tünelin ardından İstanbul ve Türkiye'deki ikinci füniküler sistem olma özelliğini taşıyor.

Test sürüşü geçtiğimiz ocak ayında İstanbul Büyükşehir Belediye Başkanı Kadir Topbaş'ın katılımıyla gerçekleştirilen füniküler sistem hizmete alındığında, İstanbul Metrosu'nu (Taksim-4'üncü Levent Metrosu) kullanan yolcular istasyon dışına çıkmadan füniküler sisteme aktarma yapabilecek.

Ayrıca deniz yolu veya tramvay ile Kabataş'a gelen yolcular, buradan Taksim'e, Taksim'den de metro ağı ile Ayazağa veya Otogar ile Atatürk Havalimanı istikametine ulaşabilecek.

Taksim ve Kabataş olmak üzere 2 istasyondan oluşan sistemde, karşılıklı olarak halatlarla hareket eden 375 kişi kapasiteli çift vagonlu 2 araç yer alıyor.

En ekonomik sistem

Sistemin hizmete girmesiyle 544 metrelik tünelde 3 dakika sıklıklasaatte tek yönde 7 bin 500 kişi taşınacak. Yolculuk sadece 110 saniye sürecek. Yüzde 22 eğimle inşa edilen Taksim-Kabataş füniküler sistemi, bu kadar yüksek bir eğimde çalışabilecek en güvenli, yatırım ve bakım açısından en ekonomik sistem olma özelliğini taşıyor.

Yapı Merkezi-Garaventa Konsorsiyumu tarafından inşa edilen sistem için 87 bin 300 metreküp tünel kazısı yapıldı, 25 bin 400 metreküp beton ile 34 bin metrekare püskürtme beton döküldü.

Ayrıca, 4 bin 740 ton demir kullanıldı, 4 bin 550 metre fore kazık çakıldı ve 26 bin 590 metrekare su yalıtımı yapıldı. Sistemin hizmete girmesi nedeniyle düzenlenecek törene, Başbakan Recep Tayyip Erdoğan'ın da katılması bekleniyor
haberturk

Opening soon June 29th
Taksim to Kabatas will be only 110 seconds now.
 

·
re re re ra ra ra
Joined
·
4,521 Posts
I was about to comment on the small number of seats, but I suppose you don't need to sit for a few second journey. :D
 

·
Strange User
Joined
·
16,106 Posts
Discussion Starter · #17 ·
I used it today... :D I am the first civilian to get on it, believe or not believe. After the offical openning ceremony, Prime Minister came to Taksim from Kabataş when he were leaving, I entered the station there was no one else. I and my friend got on and went to Kabataş. When we arrived Kabataş, people were waiting out to enter the station but there was a security zone. hahahaha, they were so amazed to see some civilians getting out :rofl:

Stations are wonderful, nice deoctation with nice white lighting sytstem. Trains are wonderful, soooo large and aesthetic, and very comfortable. When outside was buring like hell because of the weather, stations and trains are so cool and comfortable... It is really wonderful... :eek:kay:
 

·
Registered
Joined
·
2,875 Posts
hahhha

so maybe they were thinking the prime minister would come back
then you showed up!:)
 

·
re re re ra ra ra
Joined
·
4,521 Posts
Haha Kuvvaci, nice one! :D Get any pics?
 