This is a new thread for Skopje's road infrastructure.
Since the forum is restarted I will post some current pictures of the projects going U/C
Boulevard Ilinden would be a parallel boulevard with the current 3+3 Partizanski Odredi.
1. Boulevard Ilinden
The first part (with yellow line) is 2+2 line boulevard with median while the second part is 2+2 line boulevard without median. Total lenght of the project is app. 2km. The project is sheduled to be open in the end of September.
2. Boulevard Srbija
Boulevard Srbija connects suburbs of Novo Lisice, Aerodrom with the south suburbs of Kisela Voda. It continues to the north by bridge on the vardar River and goes to the suburb of Avtokomanda where connects with the North Boulevard (Aleksandar Makedonski).
The last part has been upgraded with 2+3 and median. The project is sheduled to be open in October.
Since the forum is restarted I will post some current pictures of the projects going U/C
Boulevard Ilinden would be a parallel boulevard with the current 3+3 Partizanski Odredi.
1. Boulevard Ilinden
The first part (with yellow line) is 2+2 line boulevard with median while the second part is 2+2 line boulevard without median. Total lenght of the project is app. 2km. The project is sheduled to be open in the end of September.





2. Boulevard Srbija
Boulevard Srbija connects suburbs of Novo Lisice, Aerodrom with the south suburbs of Kisela Voda. It continues to the north by bridge on the vardar River and goes to the suburb of Avtokomanda where connects with the North Boulevard (Aleksandar Makedonski).
The last part has been upgraded with 2+3 and median. The project is sheduled to be open in October.



