Capital Place
Exclusive Office Park located in the Heart of Airport Residential Area.
*
*
Project Overview
*
ProjectDescription
Stand 16 (0,8ha) in Airport City Accra, Ghana at the corner of Ridge Road and Patrice Lumumba Drive is the land earmarked for the Capital Place Office Complex. *This is a new development that will encompass 3 No. stand alone multi-story office buildings which will have the capability of housing a single tenant or of being subdivided for multi-tenant use. Two of the buildings (B & C) will have a joined basement which will allow for basement parking and areas allocated for services and infrastructure. The associated landscaping and external works including the entrance from the street and public transport have all been taken into account into the development.
*
BuildingDescription Basement
The basement is located under office buildings B & C linking the two buildings at this level. Two separate service cores are serving the two office blocks from the basement. The water tanks and equipment is housed in a section behind the core of Block C and will provide non-potable and fire water to the entire office development. A total amount of 55 secured parking bays will be provided in the basement.
*
Parking
The main parking for buildings B & C will be in the basement as stated above and the remainder of the parking will be on-grade and allocated to each building accordingly. The current ration being achieved is 3.5/100 with the intent of reaching the 4/100 level.
*
Office Block A
Block A is a three story (Ground + 2) office block with a central circulation core allowing for multiple tenants to occupy the building. This building does not have access to the basement but will have dedicated shade net parking on grade level. The main structure will be of concrete with a 7.5m span between columns with a masonry block external wall that will be plastered and then painted. The roof will be a mix of concrete surface capable of housing the plant area and soft roof to allow for a cost effective build. The internals of the building will be a white box specification in the tenant areas which will consist of plastered walls, suspended ceilings with lighting to a lux level of 350and concealed air conditioning units that will hold an ambient temperature. The main core areas (lobby, ablutions etc…) will be finished to an A grade standard. The main non-potable water for the building will be supplied via a 5000l jojo tank (2 day supply) situated on the roof. All drinking water will be brought in by the respective tenants in bottled format.
*
Office Block B
Block B is a three story (Ground + 2) office block with a central circulation core allowing for multiple tenants to occupy the building. This main parking will be via the basement but will have dedicated*shade net parking on grade level. The main structure will be of concrete with a 7.5m span between columns with a masonry block external wall that will be plastered and then painted. The roof will be a mix of concrete surface capable of housing the plant area and soft roof to allow for a cost effective build. The internals of the building will be a white box specification in the tenant areas which will consist of plastered walls, suspended ceilings with lighting to a lux level of 350and concealed air conditioning units that will hold an ambient temperature. The main core areas (lobby, ablutions etc…) will be finished to an A grade standard. The main non-potable water for the building will be supplied via a 5000l jojo tank (2 day supply) situated on the roof. All drinking water will be brought in by the respective tenants in bottled format.
*
Office Block C
Block C is a four story (Ground + 3) office block with a central circulation core allowing for multiple tenants to occupy the building. This main parking will be via the basement but will have dedicated shade net parking on grade level. The main structure will be of concrete with a 7.5m span between columns with a masonry block external wall that will be plastered and then painted. The roof will be a mix of concrete surface capable of housing the plant area and soft roof to allow for a cost effective build. The internals of the building will be a white box specification in the tenant areas which will consist of plastered walls, suspended ceilings with lighting to a lux level of 350and concealed air conditioning units that will hold an ambient temperature. The main core areas (lobby, ablutions etc) will be finished to an A grade standard. The main non-potable water for the building will be supplied via a 7000l jojo tank (2 day supply) situated on the roof. All drinking water will be brought in by the respective tenants in bottled format.
*
Infrastructure
The main infrastructure of the site does link all three office blocks to the main systems.**The power will be feed from the main transformer from the street to the transformer room in the basement. From there it will be reticulated to the respective buildings main distribution boards.**The 500kVA generator will be placed in its own housing and will service the 3 office blocks with full standby capabilities. Fiber-optic connection to the main server room in the basement of building