I dunno why you guys closed the last topic but who cares.
New one here....

A picture taken today from work being done at KORIDORI 8

 

·
Registered
Joined
·
713 Posts
highway to start construction this year:

The construction of major highways.
A. Levan-Tepelene worth 70 million euro.
B. Levan-Vlore worth 50 million euro.

C. Sarande-Konispol worth 30 million euro

D. Shkoder-Han i Hotit
 

·
Registered
Joined
·
713 Posts
milot-rreshen (u/c)



This section is divided into three subsections.

Milot-Skuraj - 9km 10.5m width 11.7 million dollars 24 months
Skuraj-Rubik - 9km 18 months work starts April
Rubik-Rrëshen - 8km 8 months work starts May

there is already an excellent two laned road from milot to rreshen. only the second carriageway needs to be build

it will have 3 bridges 18m length.

there is also envisioned 4 bridges of 30m in length and the construction of an overpass near Milot to link the city with the new highway.
 

·
Registered
Joined
·
713 Posts
some roads to be built:

rruga e arberit

150 kilometers and a national road.
the road will start from milot and end at peshkpoi and the macedonian-albanian border. it will be one lane in each direction but it will be a first class national road. it diverges from the durres-kukes highway near milot.

it is divided into these sections for construction:
Milot-Ulëz
Ulëz-Burrel
Burrel-Klos
Klos-Bulqizë
Bulqizë-Peshkopi

construction had started in late 2006 in all sections except for the Klos-Bulqize section due to weather.

 

·
Registered
Joined
·
713 Posts
9. The construction and reconstruction of roads this year:
A. Bajram Curri-Margegaj worth 3 million dollars

B. The construction of the "trans-balkan" road that links vlora with corridor 8 and the adriatic-ionian highway worth 2.56 million dollars

C. The construction of dhermi-vuno worth 400,000 dollars

D. The construction of Himare-Qeparo worth 240,000 dollars

E. The construction of Orikum-Llogara worth 300,000 dollars

F. The construction of the road Vlore-Orikum worth 300,000 dollars

G. The construction of the road to the beach of spille worth 140,000 dollars

H. The construction of the road to velipoje worth 75,000 dollars

I. The construction of an overpass over the road Viroit-Gjiroakster worth 300,000 dollars

J. The construction of the road Curila-Porto romano worth 300,000 dollars

K. The re-construction of the road Hotel Butrniti-Kanali Cukes worth 100,000 dollars.

L. The re-construction of rruga Gjiri i Lalzit worth 2 million dollars

M. The re-construction of rruga e Dardhes worth 400,000 dollars

N. The re-construction of the road Lac-Patok worth 357,000 dollars

O. The re-construction of the road Lin-Pogradec worth 10,050 dollars

P. The re-construction of rruga e Liqenasit worth 300,000 dollars.
 

·
Registered
Joined
·
713 Posts
Corridor 8





june 06 pics of Lushnje-Fier Section u/c.







Korca-Greek Border u/c a while ago






Rrogozhine-Lushnje










the last two sets thanks to dewrob

Both pics were taken nearby the macedonian border.


 

·
Registered
Joined
·
713 Posts
Adriatic-Ionian Highway (U/C)



gjirokaster-tepelene u/c


Sarande-Konispol worth 30 million euro starts this year



Levan-Tepelene worth 70 million euro starts this year



Shkoder-Han i Hotit starts this year

 

·
Moderator
Joined
·
52,840 Posts
Great to see some pics from this very poor country, as it is seen by the west. I hope things will improve there fast.