Ministry of Construction is nearing completion on the ministry building in Baghdad at a cost of up to twenty billion dinars



Investigated Al-Mansour Contracting Construction one of the formations and the Ministry of Construction and Housing completion rates advanced more than eighty percent of the project of constructing a building of the Ministry of Construction and Housing, which is located in the heart of the capital Baghdad, specifically in the Alawi area.
The general director of the company's engineer thanksgiving that the design of building of the Department of modern designs, which depends for the first time in Iraq and called the building green or eco-friendly with the adoption of international standards and specifications in the creation of this building in terms of exterior and interior design, which reduces the use of electric power the adoption of the plate glass and aluminum in the packaging building from the outside in addition to non adoption of the building completely on cooling or heating the central fact that the sun penetrates the building from all sides in addition to the fact that the glass of the type color, which helps to maintain the temperature and cold inside the building, which reduces the use of electrical energy.
He explained that the building of ten floors with a cellar and a multipurpose hall and accessories, which include rooms for the translation and presentation in addition to the stores, adding that the hall can accommodate three hundred people with a total area of two hundred and fifty square meters.
He added that the basic design of the building focused on the exploitation of the site in terms of function and use of the administrative system is open to create an atmosphere of harmony and enjoy the scenery of Foreign Affairs to create a functional and beautiful environment.
He said the building was designed on the modern use of substances of high technologies from the technical point of using packaging full glass double and aluminum together, stressing that the total cost of the project up for about two billion dinars, and that work is continuing and rapidly rising to shorten the time and the completion of the building before the scheduled date.



 

·
Registered
Joined
·
487 Posts
if only we could get some pictures, their website is messed up with no good shots!
 

·
Registered
Joined
·
1,371 Posts
^^ Is that the completed project? It doesn't look finished to me lol
 

·
Registered
Joined
·
1,371 Posts
I though so since its still scaffolded and cranes are up.
 

·
dreams of Babylon rising
Joined
·
13,685 Posts
Discussion Starter · #8 ·
i believe in that last pic, the scaffolding was gone and the cladding was complete.
 

·
Registered
Joined
·
2,325 Posts
the CABLES are just spoiling everything in the pic above !
this is suppose to be an important area !
Baghdad Council , Baghdad Governorate Buidling , Ministry of Construction Headquarters , Iraqi Media Network Building , and other main government buildings . and the Area still looks like that !
 

·
dreams of Babylon rising
Joined
·
13,685 Posts
Discussion Starter · #13 ·
looks like its done.

 

·
dreams of Babylon rising
Joined
·
13,685 Posts
Discussion Starter · #15 ·
time to move it to the "completed projects" subforum?
 

·
Registered
Joined
·
1,371 Posts
It looks good, Baghdad is slowly starting to look like a capital thank gosh.
 

·
Banned
Joined
·
218 Posts
It looks good, Baghdad is slowly starting to look like a capital thank gosh.
it always was the capital, it always looked like a capital, it'll always be the capital, and best city.
 