Discussion Starter · #3 ·
Over 900 HTV go to Goa via NH4A
Oct 26, 2015

After the district administration failed to implement the Ban on Heavy vehicles within city limits even for a limited time, now the Traffic department has conducted a survey at various points to know the exact amount of traffic of vehicles using the NH4A.

According to sources about 900+ vehicles were counted on each side coming towards Belagavi and leaving from Belagavi in a span of 24 hours.

Now the amount of heavy traffic plying on this road is huge and hence even if the ban on HTV is implemented there would be chaos on the highway as one side of the road would be blocked as there is no arrangement for parking.
This is the main reason why the Ban was not effectively implemented.

Now the traffic department will make a plan on the basis of this survey and also an alternate route is being suggested for HTV to use to reach NH4A at Khanapur which is MK Hubli – Itagi Cross to Khanapur. But the said road is very small and now first it will have to be widened and then some amount of HTV traffic can be diverted on the route.
http://allaboutbelgaum.com/news/over-900-htv-go-to-goa-via-nh4a/
 

·
0821- City of Palaces!
Joined
·
35,149 Posts
Discussion Starter · #4 ·
Mayor surveys Bhave circle to Kapileshwar road for widening

The road from Nargundkar Bhave circle to Kapileshwar was taken up for widening in 1994 and was widened to 40 feet.


But the widening was not completed and even today there are some structures which are in the line of the road. A few of the residents then had approached the court also.


Sources said some property owners were alloted shops at the Corporation complex at Basveshwar circle then.
The Mayor spoke to the shop owners and sought their support for the widening of the road.
 

·
0821- City of Palaces!
Joined
·
35,149 Posts
Discussion Starter · #5 ·
KPWD/2015-16/RD/WORK_INDENT40712 Construction of 6 Lane Belagavi Panji NH-4 A from Km. 2.20 to 3.40 (from RPD Cross to 3rd Railway Gate) at Belagavi under 5054- SH (Improvements ) 2014-15 OPEN WORKS Roads 41585005.46 01/09/2015 16:25:31 27/11/2015 16:00:00
 

·
0821- City of Palaces!
Joined
·
35,149 Posts
Discussion Starter · #9 ·
KPWD-BELG-DIV KPWD/2015-16/RD/WORK_INDENT40734 Construction of 6 Lane Belagavi Panji NH 4A Vajpayee Marg from Km. 2.20 to 3.40 (3rd Railway Gate to RPD Cross) at Belagavi OPEN WORKS Roads 59602577.89 20/11/2015 16:17:55 21/12/2015 16:00:00 View Notice Inviting Tender details Download Tender Documents
30
KPWD-BELG-DIV KPWD/2015-16/RD/WORK_INDENT40959 Construction of 6 Lane Belagavi Panaji Road from Km. 3.40 to 6.60 at Belagavi (from 3rd Railway Gate to Perranawadi Cross) under H/A: 5054- SH Improvements (2014-15)
 

·
******
Joined
·
10,453 Posts
Continuing its focus on State Highways, the State Government will transform State Highway between Belagavi and Yeragatti to world class standards by implementing 63-km "safe corridor" worth Rs 91 crore in association with the World Bank

To ensure the safety of road-users (pedestrians, cyclists, motor drivers) on its highways, Karnataka, for the first time, will implement the 'safe corridor' project with assistance from the World Bank.

By the end of 2016, the 63 kilometre state highway stretch between Belagavi and Yeragatti, passing through Sambra airport, is likely to be the model for safe corridor. As per the project, the entire 62 kilometers two-lane stretch will be engineered on par with international standards to ensure constant patrolling supported by latest technologies, round-the-clock health facilities, and sensitisation of the public and road users by agencies.

The entire stretch has already been subjected to high ramp analysis and correction points have been taken note of. Accordingly, works have been carried out on the ground. The stretch has 45 junctions and all the junctions will be refurbished as per international standards recommended by international road safety experts. The works include widening of roads, lane marking, junction upgradation, creation of signages, cycle tracks and asphalting. These correctional works will be completed by November-December, 2016.
(Image in the post is representational denoting a "Safe Corridor" design)



GoK FB
 

·
0821- City of Palaces!
Joined
·
35,149 Posts
Discussion Starter · #19 ·
KPWD-BELG-DIV KPWD/2015-16/LS/FLYOVER/KRISHNADEVARAY CONSULTANCY SERVICES FOR CONSTRUCTION OF FLYOVER AT KRISHNADEVARAY CIRCLE IN BELAGAVI CITY OPEN SERVICES ---- 08/01/2016 15:58:14 20/02/2016 16:00:00 View Notice Inviting Tender details Download Tender Documents View Corrigendum for this tender
126
KPWD-BELG-DIV KPWD/2015-16/LS/FLYOVER/BOGARWAYS CONSULTANCY SERVICES FOR CONSTRUCTION OF FLYOVER AT BHOGARWAYS IN BELAGAVI CITY OPEN SERVICES ---- 08/01/2016 15:56:36 20/02/2016 16:00:00 View Notice Inviting Tender details Download Tender Documents View Corrigendum for this tender
127
KPWD-BELG-DIV KPWD/2015-16/LS/FLYOVER/CHANNAMMA CRICLE CONSULTANCY SERVICES FOR CONSTRUCTION OF FLYOVER/UNDERPASS AT RANI CHANNAMMA CIRCLE IN BELAGAVI CITY OPEN SERVICES ---- 08/01/2016 15:54:43 20/02/2016 16:00:00 View Notice Inviting Tender details Download Tender Documents View Corrigendum for this tender
128
KPWD-BELG-DIV KPWD/2015-16/LS/FLYOVER/ASHOSK CRICLE CONSULTANCY SERVICES FOR CONSTRUCTION OF FLYOVER FROM NH-4 TO CBT RAICHUR BACHI ROAD IN BELAGAVI CITY OPEN SERVICES ---- 08/01/2016 15:53:17 20/02/2016 16:00:00 View Notice Inviting Tender details
 