Joined
·
2,886 Posts
The land was owned by someone else when the original block was designed and approved. I think they finalised the sale of the plot after construction had commenced.Such a strange extension and set of circumstances. Was the land owned by someone else but designed by the same architect as its bound to be a lot more expensive to build the extension than just build it all in one go.