An EBRD loan was recently provided for two sections of A1, including a portion south of Mostar: https://balkaneu.com/new-ebrd-loan-for-corridor-vc/
Contract for construction of the part between Počitelj exit and Kvanj tunnel was awarded to Hering in late May http://hering.ba/novosti_vise.php?id_novost=68, tender for construction of Zvirovići (marked as Međugorje on the map)-Počitelj part had to be recalled twice and is now open for the third time if I am not mistakenAny news on this?
![]()
Highway to Doboj nears completion. Except that on the last photo the state flag is missing as usual.
![]()
![]()
![]()
Do this part have a connection to the new bridge at the HR-border?
This segment (Banja Luka - Doboj) is connected to the existing segment (Banja Luka - Gradiska), where the bridge construction is expected to start next year.
The bridge currently under construction is located in Svilaj, which is not connected to this highway segment.
Bosanska Gradiška is meant to be the entrance to Bosnia for people traveling from Western Europe, while Svilaj will be the entrance for Central and Eastern Europe. In other words, the two bridges gravitates to two completely separate regions.Now when you get the Gradiška bridge done, the bridge near Svilaj will be empty, because nobody will pay expensive Croatian A3 on the way from SLO to Sarajevo.
Only question is how much will toll cost now from Gradiška to Doboj?
Sure? I paid 4 BAM for Doboj - Prnjavor three weeks ago and another 2.50 BAM for Drugovic - Mahovljani.Mahovljani interchange-Doboj costs 4 BAM.
green - in service
Yes, thanks. But I must be insistent that the red section in the south is NOT yet u/c. Only the contract was awarded and signed.We have an updated map of highways in Bosnia and Herzegovina, thank you ww87![]()
The deadline is 18 months (May 2018 + 18 months = November 2019, right?) but I cannot believe that it will be fulfilled when we do not yet have any construction works being started. Is there any info about groundbreaking?Contract for construction of the part between Počitelj exit and Kvanj tunnel was awarded to Hering in late May http://hering.ba/novosti_vise.php?id_novost=68
You are absolutely right. We haven't had any news or photos of groundbreaking but that does not mean the works hadn't started. Though I must point out this is only a personal speculation, hence the lack of informationIt's only a sub-section of 7.2km in the middle of the Buna - Počitelj section (15km?) and if memory serves, it cannot be opened without the neighboring northern and southern sub-sections. These contracts have not yet been signed.
I thought Zenica is under construction?It is pretty sad that so crucial parts like around Počitelj and Zenica north bypass are still in procedures after so many years.