Skyscraper City Forum banner
1 - 9 of 9 Posts

·
Registered
Joined
·
86 Posts
I thought the design was a bit bland at first. However looking at the designs it looks much better from a distance despite lacking a real 'grand entrance'. Its good to see the college producing degrees and helping regenerate the city like Bradford University has done in the past decade.

Is there any chance the university could brake from the college (obviously in a lot of years time) as Bradford as a low student population, especially under 25s living away from home & large quantities of them can bring many benefits. Just look at Leeds and Manchester.
 

·
Registered
Joined
·
2,945 Posts
I thought the design was a bit bland at first. However looking at the designs it looks much better from a distance despite lacking a real 'grand entrance'. Its good to see the college producing degrees and helping regenerate the city like Bradford University has done in the past decade.

Is there any chance the university could brake from the college (obviously in a lot of years time) as Bradford as a low student population, especially under 25s living away from home & large quantities of them can bring many benefits. Just look at Leeds and Manchester.
Renders/drawings??? Could you either post them here or link me to them?
 

·
BAND
Joined
·
3,239 Posts
Long time no update:





A few other links with older construction photos:

http://www.thetelegraphandargus.co.uk/news/10967031.Dementia_recognition_for_Bradford_College/

https://www.flickr.com/photos/gooda...NRF-fq15TJ-9QuH4Q-4CMnyJ-4CMn5j-hRabxt-i48X6D

And a timelapse video here:

www.bradfordcollege.ac.uk/about/new-building


Apparently they're moving out of the Old Building as well according to the FAQ:

www.bradfordcollege.ac.uk/about/new-building/faqs

No idea what that will become now.

On the whole though the architecture for this project is looking really nice, imagine it could be up for some local building awards once it's completed, which doesn't seem far away.
 

·
BAND
Joined
·
3,239 Posts


www.thetelegraphandargus.co.uk/resources/images/3050386

Building work on the new Bradford College will finish ahead of schedule and on budget

VIDEO: £50m college will be ready ahead of schedule

7:30am Thursday 29th May 2014 in News

A new £50 million building at Bradford College will be finished two weeks ahead of schedule and ready to welcome students in September.

Many of the current college classes and facilities will be moving into The David Hockney Building over the summer after contractor BAM finishes in July.

Workers are currently fitting out classrooms and laboratories and adding the decorative features to the 23,000 square metre project, which has been funded through college reserves and a government loan.

The state-of-the-art building, on Great Horton Road, was named after Bradford artist David Hockney and a competition is currently under way for students to create artwork to adorn the six-storey building.

The college is currently spread out over several blocks and when the new building opens some of the existing structures, including the Westbrook building, will be demolished.

The towering structure, next to the new build, will come down in September and turned into a multi-tiered open green space by the end of March.

The McMillan and Appleton buildings will be sold for non-college use.

However because of the move to fewer buildings, the college has announced job cuts in cleaners and maintenance staff. Talks are currently ongoing with staff and unions.


The Lister Building, Bolton Royd and Trinity Green Campus will remain and the Old Building will now house the Bradford College Film School. The college has planned a £2.8m refurbishment and extension of the Lister Building which will accommodate a library, cafe and exhibition area.

Up to 5,000 people can be accommodated in the new building and the college hopes the state-of-the- art facility attracts more people to choose Bradford College to study.

With completion just weeks away the building, which will be delivered within budget, is starting to take shape.

Project manager for BAM Jason Pink said the building would be handed over in early July, adding: “We are intending to hand the building over two weeks earlier than contracted. The project is all on budget, it has been really well controlled.”

The building will feature open plan libraries, a cavernous atrium and solar panels on the roof. It also features a rooftop terrace that doubles as a classroom where pupils can work on a roof top garden as well as see up close how a solar panel works.

There will be campus wide WiFi, with students able to use technology in every part of the building.

Many of the college’s classes focus on vocational training and the new build will include training kitchens to give pupils hands on experience not previously available in the college’s current buildings.

Some of the building’s new classrooms have even been designed to look like commercial shop fronts, including hair and beauty salons and a restaurant and café, which are all open to the public and accessible from Carlton Street.

By the time the Hockney Building is complete, around 3,000 people will have worked on it and BAM says that 85 per cent of those live within a 50 mile radius.

Much of the stone for the building came from a quarry in Brighouse.
www.thetelegraphandargus.co.uk/news/11241507.VIDEO____50m_college_will_be_ready_ahead_of_schedule/
 

·
Moderator
Joined
·
6,984 Posts
Looking good!

Looks like another big step in the right direction for Bradford - not just the building but the high quality education service it will bring and will provide in the future years.
 
1 - 9 of 9 Posts
Top