SkyscraperCity Forum banner

#CANCELLED: "Sabah Al Ahmad International Finance Center", 40F, ?M, Offices & Hotel

15217 Views 91 Replies 28 Participants Last post by  Skoulikimou
Project Name : SIFC - Sabah Al Ahmad International Financial Center
Client: Al-Shaab Real Estate Co.
Project Type: Office
Engineering Consultants: KEO International Consultants
Status: Approved
Location: Kuwait city
Area: 6000 m²/19685 ft²
Hight/Floors: Unknown / 40
Start/Complete: Unknown / Unknown


www.alqabas.com



OLD DESIGN BY Bernard Khoury
61 - 80 of 92 Posts
hmmm....dont wanna sound out of touch ...but is the building design shown on page one of this thread scrapped or is it a different development?
Bernard Khoury design was one of the first proposed designs ,which is no longer valid
hmmm....dont wanna sound out of touch ...but is the building design shown on page one of this thread scrapped or is it a different development?
^^thanks skouli...
14 May 2008





KEO International Consultants has been notified by the U.S. Green Building Council that the 1.2 million sq ft project, Sabah Al Ahmad International Financial Center, has been officially registered with the U.S. Green Building Council (USGBC) and is now pre-certified to get Kuwait’s first LEED certification.

The client, Securities House for Real Estate Co., and the developer AlShaab Real Estate Co., gave KEO the incentive to pursue a sustainable design using guidelines and tools outlined in the Green Building Rating System in late 2007. In addition to creating an iconic 40 storey tower consisting primarily of high end offices and a hotel, KEO was given the task of achieving a LEED® Gold from the USGBC. As well as meeting or exceeding a series of green requirements, the tower employees a series of wind turbines and PV panels to provide a renewable source of energy.

The design solution translates the client’s brief for various programs into 4 stacked courtyard atriums ranging from 8 floors to 13 floors each. Three of these accommodate office floors while one accommodates a 4-star Business Hotel with 200 rooms. A separate 800 sq m Trading Hall on the ground floor will accommodate 24-hour trading for the facility and there will also be an Antiques Auction Centre. The sculptural shape of the tower induces wind at the top of the building where wind turbines are specially positioned to generate power for the building.

www.worldarchitecturenews.com
^^ very interesting glad to see that kuwait is starting to have more sustainable buildings... it's also good to know that it will also house a hotel, that will help to revitalize that area regarding that aspect... more hotels :D
this render looks slightly different
yeah it does look different! especially the hall thing at the bottom
They finished from digging the site



:)
thx for the pic faisal
wow this one is also underconstruction now...kuwait is now getting good towers

thnx for the update
the project is not under construction they are carrying out soil test hopefully the project will go full steam ahead in few months although the mean tender has not been issued yet
رئيس مجلس الادارة والعضو المنتدب في شركة بيت الاوراق ايمن عبدالله بودي
29/05/2009
ذكر بودي ان الشركة حصلت على كافة التراخيص الخاصة بتنفيذ مشروع مركز صباح الأحمد المالي عبر شركة تابعة لـ »البيت« وسيتم تخصيص أكثر من 700 مكتب علما بأن التكلفة انخفضت بنسبة %30 في عمليات البناء نظرا لرخص أسعار مواد البناء.


www.alwatan.com.kw
so will they start constructing soon?
Are there any news of this big project?!
isn't that burj mubarak's reflection on the first pic?
كشف رئيس مجلس الإدارة والعضو المنتدب لشركة الشعب العقارية، المملوكة لشركة بيت الأوراق العقارية، بدر الحميدي أن الشركة سوف تتسلم في غضون أيام كافة التراخيص النهائية الخاصة بمشروع مركز صباح الأحمد المالي العالمي من البلدية على أن تباشر الشركة أعمال الحفر في المشروع نهاية العام الجاري ومن المتوقع أن تبدأ عمليات التشييد والبناء نهاية العام 2010.
وقال الحميدي لـ «الدار» ان الشركة بدأت بالفعل في تسويق وبيع وحدات المركز المالي، وتلقت طلبات حجز عديدة من شركات محلية، كما ابدى عدد من المؤسسات المالية العالمية رغبة جدية في استئجار وحدات للتواجد، مشيرا إلى أن وفداً من الشركة عاد أخيرا من هونغ كونغ, حيث تفقد مراكز مالية هناك للوقوف على السلبيات القائمة في هذه المراكز لأجل تلافيها في هذا المركز والوصول إلى أفضل صورة ممكنة لمركز مالي عالمي.
كما ستوقع خلال الأيام القليلة المقبلة عقد تأجير كراج السيارات الملحق بالمشروع لصالح احدي الشركات المتخصصة.
وأشار الحميدي الى ان تراجع أسعار مواد البناء جاء لصالح الشركة حيث انخفضت التكلفة من نحو 100 مليون دينار قبل الأزمة المالية لتصل الى 70 مليون دينار حاليا ما شجع الشركة على المضي قدما في تنفيذ المشروع والاستفادة من انخفاض التكلفة واكد الحميدي عدم وجود اية مديونيات على الشركة وتتوافر وسائل التمويل اللازم للمشروع سواء بطريقة مباشرة او غير مباشرة.​
جريدة الدار - 18/10/2009
finally something official i thought this project was DEAD
61 - 80 of 92 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top