
IRT route to the top, Rail Station to the south.
Its just a possibility but nothing planned or proposed.Some questions:
I've never seen any passenger trains on that line where they're planning to add the Sable Way station. It's not on any of the Metro passenger rail maps I've seen & it looks like it ends somewhere around the container docks with no other stations on the way. Are they going to running trains in both directions from that station? And if that is the case, then are they planning to add any more stations? Or extending/linking the line to the Waterfront?
Prob budgetary issues. This station was planned many years ago and its easier to add a station here than on the other line near Ratanga which I assume is not in use. This station also provides a crucial link to the suburbs on the other side of the N1.why wouldent the transport interchange not be in close proximity or part of the mall as apposed to other side of century way?
Also with Cape Towns incliment weather in Winter, Why is the pedestrianised connection between Station and mall not covered at least?
i think its about killing two birds with one stone. a train station for workers and a link to century city for those across the N1.the station location makes sense (apart from not covering the N1 walkway) but then the transport interchange should be much closer and not on the other side of the precinct.