Leudimin
No 41, not good
Joined
·
9,033 Posts
Somehow there are two ghost posts. Now the new page should be accesible.

I was able to confirm line 9, also known as the Konggang (Airport) line and previously known as line S1, is under construction, and in fact it has been so even before it was approved. Now I hope they start the Eastern extension of line 2 soon, otherwise line 9 would end in the middle of nowhere to the East of the city.
 

·
Leudimin
No 41, not good
Joined
·
9,033 Posts
That line started construction on the year end wave. In the last month another line, line 7, also started construction. And yet another line, line 5, is about to start construction as well if not already. Changchun is really hitting the throttle when it comes to metro construction.
 

·
PC LOAD LETTER
Joined
·
7,890 Posts
western extension of Line 2 opens 2021.10.08.

There are 3 stations, and it's 4.36 km long.



Jieda Avenue station:




Now Line 2 is 24.9 km.

What else can I say? To paraphrase Jack Hues, "Everybody Changchun Tonight!!!"
 