Discussion Starter · #1 · (Edited)
Took me ages to dig this out! Goes to the committee 5 Jul 18. Might want to rename it as you want AJD.

Number of floors: 2x3 storeys, 2x4 storeys, 2x5 storeys
Number of apartments: 299
Developer: Countryside Living

Broughton's renaissance continues

18/71546/FUL | The construction of 299 apartments together with raised car park, flood mitigation measures, hard and soft landscaping, and other associated works | Land At Clarence Street Lower Broughton Salford
6 new blocks - 2x5 storey, 2x4 storey and 2x3 storeys in height.







:cheers:
 

·
Registered
Joined
·
922 Posts
As regards "typical materials" they do not show the render, on some of the larger houses and blocks of flats, that was cream and is now dirty, rain stained grey....Pass every day and they look tired and a bit run down already...As regards the area, there is litter all over where the common parts join the pavement in and around the bushes..Every blue moon is perhaps picked up by their side..The Council, not being responsible, just ignore it of course...
 

·
Read Only
Joined
·
2 Posts
Salix and Countryside secure Salford consents

Plans by the two developers that will bring a combined 400-plus homes to Salfod have been approved at July’s planning committee.

At Canon Green Drive, Salix is to re-clad former council tower blocks Westminster House and Canon Green Court off Blackfriars Road, and construct a new building of 108 apartments, part nine storeys and part 11 storeys, in a scheme designed by Corstorphine + Wright.

The scheme is a rent-to-buy project, where households are able to rent a home at 80% of market rent and purchase the property at year five if they wished.

The application was deferred at June’s committee, since which time an objection lodged by the adjacent Stay Inn has been withdrawn following the relocation of the new building’s proposed substation.

The new build element comprises 18 one-bedroom and 90 two-bedroom apartments and three commercial units at ground floor.

Salix committed to improvements on both existing buildings as part of a 2015 stock transfer, pledging to bring them up to Decent Homes Standard by 2020 with both internal and external refurbishment.

The planning officers’ report said: “This is not a PRS project where significant numbers of three-bedroom apartments are generally let to professional sharers, but is instead an affordable housing scheme aimed at working single persons or co-habiting couples who can neither afford private market rent accommodation or to buy their own home.

“Additionally it would not be possible to secure capital funding from Homes England for three bed units in this locality.”

The existing buildings will have grey-coloured brick slips added to their ground-floor, which would match the corresponding level of the new Blackfriars block.

The existing balconies within Canon Green Court would be enclosed through the installation of glazing to create ‘winter gardens,’ officers said, providing additional space for residents that is warm and useable and “considered to be a particularly positive feature of the proposed refurbishments”. The upper-floors of both buildings would be overclad in coloured render.

In Lower Broughton, Countryside is to build 299 apartments on a 5.2-acre site to the north of Clarence Street, on either side of the listed Church of Ascension. Previous housing on the site has long been demolished, with the site being more recently been used as a compound for Countryside’s other schemes in the area.

This plot is known as phase five of Lower Broughton’s redevelopment, although later phases have been completed – in total, 1,300 dwellings have been delivered in the Lower Broughton redevelopment.

Advised by planner Lichfields, Conutryside intends to deliver six blocks, three either side of the church. Each plot is to feature two L-shaped blocks to either side and a rectangular block in the middle, with the side closest to the church being four storeys, stepping up to five then six towards the outside.

The scheme will comprise 100 one-bedroom apartments, 189 two-bedroom apartments and ten three-bedroom apartments, all to be managed by Sigma. The principle of development of the site was established in a 2008 consent for 428 apartments.
https://www.placenorthwest.co.uk/news/salix-and-countryside-secure-salford-consents/
 

·
Registered
Joined
·
6,479 Posts
Discussion Starter · #9 ·
Still sheet piling. Its a huge huge site tbf.

Sheet Piling UK Twitter.

"We’re busy installing @Emirates_Steel Z section #SheetPiles using an ABI Telescopic Leader Rig and Vibratory Hammer to form a new car park access ramp on a major new residential development in Salford, Manchester for @CountrysideProp"


 

·
Registered
Joined
·
6,479 Posts
Discussion Starter · #10 ·
https://pceltd.co.uk/13323-lower-broughton-update-3-residential-podium-decks-completed/



PCE Ltd has now completed construction of the six residential podium decks for Countryside Properties at Lower Broughton, Salford using their HybriDfMA system build approach.

Over 900 offsite engineered precast concrete units were manufactured offsite and delivered to meet the overall onsite construction programme of thirteen weeks for the six podium structures.

Construction was carried out sequentially using a hundred ton telescopic crane with an average workforce on site during the construction period of only eight operatives.

Once again PCE’s approach has demonstrated that their Offsite HybriDfMA solutions meet fast construction programme needs by reducing:-

The number of onsite operatives
Health and Safety risks
The project’s carbon footprint.
 