Some pictures of the future "TRANSRHUMEL" Bridge.
Andrade Gutierrez, a well established Brazilian company, won the 150m euro contract for the construction of this new bridge of Constantine. The 'Transrhumel' project is meant to be completed in 32 months.
Source: DISSING+WEITLING
Facts:
750 m concrete cable-stayed pedestrian and road bridge
27 m wide deck, 1.5 m sidewalk
Dual Carriageway with hard shoulder
Main span: 245 m., Pylon height: 130 m
Wilaya de Constantine, Algeria
In Progress
Closed competition 2008: First prize
Client: Algerian Ministry of Public Works and The City of Constantine
Architect and Design/Build consultant: DISSING+WEITLING
Engineer: COWI, Denmark
Zagope, Portugal
Andrade Gutierrez, a well established Brazilian company, won the 150m euro contract for the construction of this new bridge of Constantine. The 'Transrhumel' project is meant to be completed in 32 months.





Source: DISSING+WEITLING
Facts:
750 m concrete cable-stayed pedestrian and road bridge
27 m wide deck, 1.5 m sidewalk
Dual Carriageway with hard shoulder
Main span: 245 m., Pylon height: 130 m
Wilaya de Constantine, Algeria
In Progress
Closed competition 2008: First prize
Client: Algerian Ministry of Public Works and The City of Constantine
Architect and Design/Build consultant: DISSING+WEITLING
Engineer: COWI, Denmark
Zagope, Portugal