Zagreb will have a study about LRT done by the end of this year.
LRT will most probobly have 30km of tracks underground,and about 25km overground.
Four lines are planned.
Two on the west-east direction,and two on the north-south direction.
Expantion of the Zagreb suburban rail network is allso about to begin.
Split has a 1.9km undrground rail tunnel that runs under the city center. There are two underground stations that need to be refubished for use. This will be done when the Split suburban network starts to expand,somwhere in 2010.
On the long term (2015.-2020.) plan is a complete reconstruction of the Croatian railways. This will lead to ICE-T/Pendolino/xyz train introduction!
:cheers:
LRT will most probobly have 30km of tracks underground,and about 25km overground.
Four lines are planned.
Two on the west-east direction,and two on the north-south direction.
Expantion of the Zagreb suburban rail network is allso about to begin.
Split has a 1.9km undrground rail tunnel that runs under the city center. There are two underground stations that need to be refubished for use. This will be done when the Split suburban network starts to expand,somwhere in 2010.
On the long term (2015.-2020.) plan is a complete reconstruction of the Croatian railways. This will lead to ICE-T/Pendolino/xyz train introduction!