April 2006

Tower Area Status:
  • Jump form at core wall is currently at 5th floor
  • Tower wings pouring slabs at B1 (Basement 1) and decking at ground level
  • Steel columns erected at columns ground to 2nd floor

Podium Area Status:
  • Raft construction now complete with exception of small section to North access (Zone 12) expected time of completion mid – May’06
  • Pre – cast and In Situ suspended slabs B2, B1 progressing and vertical elements at B1, ground level.
  • Retaining wall rebar works in progress at B1
  • Waterproofing in progress at retaining wall
 