... working around the clock mu a$$. Everything indicates they're thin on funds.
 

·
KING SAEED III
Joined
·
740 Posts
well, maybe they are thin in cash or really redesigning the project to make it more attractive for investors. Its a strategy that works sometimes better to strike with higher quality structure when the market is down and make sure they sell and fill all the lease spaces they offer which will be more attractive. It sound crazy and unrealistic but if its true, its opposite to all what other developers does at such financial time from comprimising on quality of the product and cutting down cost. The projects is costing Billions of dollars, either you cut few hundred of millions and deliver same units as everyone else, or you add hundred of millions and domian the market!
 

·
whitest boy in the delta
Joined
·
12,717 Posts
:eek:hno: it's one of my favorite projects, it's sad to see it get down like this
 

·
Moderator
Joined
·
6,069 Posts
23 November 2010

Tower 1: Laying of mesh for preparation of Hollow Core Slab Toppings at P02 level


Tower 2: Installation of scaffoldings for construction of periphery beams at P02 level in progress.


Tower 3 : Preparation of nibs at P01 level in progress as fabrication of HCS is completed in the factory.

www.dubaipearl.com
 

·
Registered
Joined
·
370 Posts
Is the concrete pillar structure surrounding the core going to go the full height of the building or is this just for the first few floors before becoming the more common steel? If it is a concrete on the outside right to the top it will take a while for this building to rise.

Thought it might have been needed for strengthening due to the upper floors stretching across each of the towers.
 

·
Moderator
Joined
·
6,069 Posts
6 December 2010

Tower 1: Casting of Corewall at L5M-L6 level completed while construction of columns at P2-P3 level in progress.


Tower 1: Pouring works for Corewall at L5M-L6.


Tower 3: Installation of Hollow core slab at P01 level completed.


Tower 3- Laying of mesh and casting of toppings for Hollow Core Slab at P1 level in progress. First part completed.

www.dubaipearl.com
 

·
Registered
Joined
·
1,276 Posts
22 December 2010

Tower 1: Casting of P3 level periphery beams completed.



Tower 1: Scaffolds and rebar works for columns at P3-P4 in progress.



Tower 3: Scaffolds for construction of P2-P3 columns in progress.



Tower 3: Installation of mesh for Hollow Core Slabs at P2 level. Casting on one side completed.



http://www.dubaipearl.com/info/construction
 

·
whitest boy in the delta
Joined
·
12,717 Posts
I read an Arabianbussiness.com article earlier this year were the Dubai Pearl CEO (or someone from Dubai Pearl) said that construction will restart in the last quarter of 2010 so maybe it's real but maybe not.
thats awesome news. :) i was kinda afraid this project will die halfway up, but it seems that it gets another chance
 

·
Registered
Joined
·
32,092 Posts
More activity on the site or workers are here for the pics?
A few days ago I saw the same number of workers on site, definitally not for the pics.
 

·
Moderator
Joined
·
6,069 Posts
3 January 2011

Tower 1: Construction of beams at P4 completed and HCS installation at P3 level in progress


Tower 2: Installation of Hollow Core Slabs for P1 level in progress


Tower 2: Laying of mesh for toppings of HCS at P1 level in progress


Tower 3: Construction of beams at P3 in progress and scaffold for construction of columns at P3-P4 level in progress

www.dubaipearl.com
 

·
MONACO _ Côte d'Azur
Joined
·
16,657 Posts
Mott Macdonald wins Dubai Pearl contract

by Ben Roberts on Jan 13, 2011

Mott MacDonald has been appointed detailed design engineer for the first phase of Dubai Pearl development in Dubai.

The engineering and development consultant will provide services for all mechanical (HVAC), electrical, public health, fire, communications and security systems on the US $6 billion luxury project. The company will also provide the LEED consultancy role coordinating all internal and external consultants towards LEED Gold accreditation.
http://www.constructionweekonline.com/article-10766-mott-macdonald-wins-dubai-pearl-contract/
 