Edinburgh | Development Summary 2017
____________________________________________________________________________________


Mixed-Use Developments


Edinburgh St James
East End | Retail-led mixed-use development

Links: Project thread | official website

Project cost: £1 billion

Architects: Allan Murray Architects, Jestico + Whiles, Purcell Miller Tritton

13 acres

150 homes
214 room W Hotel
52 room apart-hotel
47 room boutique hotel
70,000 m² retail – 85 retail units, 31 F&B units
5 screen Everyman Cinema

Status: Under construction – due for completion by 2020





______________________________________________________________________________________________


International Business Gateway (IBG)
Ingliston | Office-led mixed-use district

Links: Project thread | official website

Project cost: £700 million

Architect: 7N Architects

210 acres

2,278 homes
1,665 hotel rooms
240,000 m² office space
5,500 m² retail & leisure space
Primary School

Status: Planning





______________________________________________________________________________________________


India Quay
Fountainbridge | Mixed-use development

Links: Project thread | official website

Project cost: £200 million

Architect: 7N Architects

11.5 acres

434 homes
130 room hotel
11,500 m² office space
4,500 m² retail space
Edinburgh Printmakers contemporary arts centre
New Edinburgh Filmhouse / cultural use building

Status: Approved





______________________________________________________________________________________________


Quartermile
Lauriston | Residential-led mixed-use development

Links: Project thread | official website

Project cost: £850 million

Architects: Foster + Partners, Richard Murphy Architects, CDA

19 acres

1100 homes
45,000 m² office space
10,000 m² retail & leisure space
University of Edinburgh interdisciplinary hub

Status: Under construction – due for completion by 2018





______________________________________________________________________________________________


The Haymarket
Haymarket | Mixed-use development

Links: Project thread | official website

Project cost: £200 million

Architects: Richard Murphy Architects, CDA

4 acres

190 room Premier Inn
168 room Staycity Aparthotel
32,000 m² office space
5,000 m² retail & leisure space

Status: Under construction – first phase due for completion by 2018





______________________________________________________________________________________________


New Waverley
Old Town | Mixed-use development

Links: Project thread | official website

Project cost: £200 million

Architects: Allan Murray Architects, CDA, Staran Architects

7.5 acres

185 homes
127 room Premier Inn
121 room Hub by Premier Inn
146 room Adagio Aparthotel
18,000 m² office space
28 retail units

Status: Under construction – due for completion by mid 2019





______________________________________________________________________________________________


The Registers
East End | Mixed-use development

Link: Project thread

Project cost: £60 million

Architects: Morgan McDonnell Architects, Gareth Hoskins Architects

The Edinburgh Grand - 50 serviced apartments, restaurants & bars
The Mint Building - 5,500 m² office space, ground floor retail & leisure space

Status: Under construction – Edinburgh Grand due for completion by Summer 2017;
The Mint Building due for completion by January 2019





______________________________________________________________________________________________


South St Andrew Square
East End | Mixed-use development

Links: Project thread

Project cost: £100 million

Architects: Gareth Hoskins Architects, CDA

7 luxury homes
10,000 m² office space
3,000 m² retail space
7 restaurant units

Status: Under construction - due for completion by Summer 2017





______________________________________________________________________________________________


Dundas Street/Fettes Row
Canonmills | Residential-led mixed-use redevelopment

Link: Project thread

Architect: Michael Laird Architects

400 homes
47,450 m² office, leisure, retail & hotel space

Status: Planning





______________________________________________________________________________________________


King's Stables Road
Old Town | Mixed-use development

Links: Project thread

Architect: Fletcher Joseph Associates

1.3 acres

52 homes
108 room Wilde Aparthotel
166 room student residences
867 m² retail
Arts facility

Status: Under construction - due for completion by late 2019





______________________________________________________________________________________________


Freer Street/Fountainbridge East
Fountainbridge | Mixed-use development

Links: Project thread

Project cost: £120 million

Architects: Michael Laird Architects, Grzywinski + Pons Architects

2.5 acres

78 homes
180 room apart-hotel
13,000 m² office space
1,967 m² retail & leisure space

Status: Planning





______________________________________________________________________________________________


Exchange 2
West End | Mixed-use district

Link: Project thread

Architect: JM Architects

300 room hotel
250 room hotel
Napier University International School of Event & Hospitality Management
Queen Margaret University catering academy
4,500 m² office space
206 m² retail

Status: Planning





______________________________________________________________________________________________


Springside
Fountainbridge | Mixed-use development

Links: Project thread | official website

Project cost: £250 million

Architects: Oberlanders Architects, CDA

8 acres

650 homes
228 room Hampton by Hilton hotel
13,000 m² office & retail space

Status: Under construction





______________________________________________________________________________________________


Edinburgh Innovation Park
Musselburgh | Mixed-use development

Link: Project thread | official website

Project cost: £80 million

Architect: 10 Design

50 acres

National Food & Drink Enterprise Centre
Innovation centre for food & drink sector SMEs
Hotel, office & retail space

Status: Pre-planning





______________________________________________________________________________________________


ForthQuarter
Granton | Mixed-use development

Link: Project thread

110 acres

2,000 homes
75,000 m² office
9,000 m² retail space
£70 million 33,000 m² college campus

Status: Under construction





______________________________________________________________________________________________


Granton Harbour/Edinburgh Marina
Granton | New urban quarter

Link: Project thread | official website

Project cost: £500 million

Architects: Robert Adam Architects, Wilson Gunn Architects

80 acres

2000 homes
160 room marina hotel & spa
5,500 m² office space
9,000 m² retail space
4,500 m² leisure space
317 berth marina
Community boatyard

Status: Under construction





______________________________________________________________________________________________


Granton Central Development Area
Granton | New urban quarter

Link: Project thread

85 acres

3,000 homes
184,000 m² office space
35,000 m² cultural space
16,300 m² leisure space
3,200 m² light industrial space

Status: Under construction





______________________________________________________________________________________________


Western Harbour
Newhaven | New urban quarter

Link: Project thread

Architects: Cooper Cromar, Robert Adam Architects

90 acres

3,000 homes
37,000 m² commercial & retail space
15 acre public park

Status: Under construction





______________________________________________________________________________________________


Craigmillar Regeneration
Craigmillar | Urban renewal programme

Links: Project thread

Project cost: £250 million

Architects: Anderson Bell + Christie, Smith Scott Mullan Associates, Halliday Fraser Munro

3,200 homes
Redeveloped town centre
28,000 m² office, leisure & retail space
2 new primary schools
Public library
£30 million community high school
150 acres parkland

Status: Under construction




______________________________________________________________________________________________


St Margaret's House Redevelopment
Meadowbank | Mixed-use development

Architect: Michael Laird Architects

First phase:
100 homes
150-175 room hotel
250-350 room student residence
3,000 m² commercial & retail space

Status: Approved





______________________________________________________________________________________________


Pennywell & Muirhouse Civic Centre
NW Edinburgh | Redeveloped local centre

Project cost: £26 million

Architect: Barton Willmore

160 homes
13 retail units & office space
New civic square
Reconfigured library & arts centre

Status: Planning





______________________________________________________________________________________________


BHS Redevelopment
New Town | Mixed-use redevelopment

Project cost: £50 million

Architect: CDA

Redevelopment of B-listed retail store (1968)
Refurbished retail units on Princes Street
3 restaurants
137 room hotel

Status: Approved





______________________________________________________________________________________________


Arts & Cultural Developments


Scottish National Gallery Project
New Town | Redeveloped art gallery

Links: Subject thread | official website

Project cost: £17 million

Architect: Gareth Hoskins Architects

1,240 m² gallery extension
Redesigned circulation & entrance areas
Re-landscaped East Princes Street Gardens

Status: Approved - due for completion by Spring 2019





______________________________________________________________________________________________


IMPACT Centre
New Town | World-class performance venue

Links: Project thread | official website

Project cost: £65 million

Architect: David Chipperfield Architects

6,700 m² concert hall complex
1,000 seat main auditorium
200 seat performance space
Education & community outreach facilities
Rehearsal & recording space
Café & bar
Interconnectivity with A-listed Dundas House (1771)

Status: Pre-planning - due for completion by Autumn 2020





______________________________________________________________________________________________


City Observatory Redevelopment Project
East End | Contemporary arts centre

Links: Subject thread | official website

Project cost: £4 million

Architect: Malcolm Fraser Architects, Collective Architecture

Refurbished observatory buildings
Contemporary art gallery
Restaurant
Collective Gallery headquarters

Status: Under construction – due for completion by Spring 2018





______________________________________________________________________________________________


National Collections Facility (NCF)
Granton | Artworks archive

Link: Subject thread | official website

Project cost: £75 million

Architect: John McAslan + Partners

11 acres

30,000 m² Passivhaus-standard archive
Publicly accessible store of 100,000+ artworks
Housing collections of National Galleries of Scotland (NGS), the Royal Scottish Academy (RSA),
the Demarco Archives & the Artist Rooms
Libraries, research rooms, exhibition spaces, café & sculpture garden

Status: Proposed – due for completion in 2021





______________________________________________________________________________________________


National Museum of Scotland Redevelopment
Southside | Museum refurbishment

Link: Subject thread | official website

Project cost: £80 million

Architect: Gareth Hoskins Architects, Smith Scott Mullan Associates

Final phase - Ancient Egypt Rediscovered & Exploring East Asia galleries

Status: Under construction - due for completion by 2018





______________________________________________________________________________________________


St Cecilia's Hall | Museum of Musical Instruments
Old Town | Redeveloped performance space & museum

Link: Subject thread | official website

Project cost: £6.5 million

Architect: Page\Park Architects

Restoration of Scotland's oldest concert hall
Redeveloped museum for the University of Edinburgh's collection of historic musical instruments

Status: Under construction – due for completion by May 2017





______________________________________________________________________________________________


Edinburgh Printmakers
Fountainbridge | Arts centre & creative industries hub

Links: Subject thread | official website

Project cost: £10 million

Architect: Page\Park Architects

Arts centre, gallery & creative industries hub within the redeveloped Castle Mill Works

Status: Approved – due for completion by January 2019





______________________________________________________________________________________________


Ross Pavilion & Gardens Project
New Town | Flexible events venue

Links: Project thread | official website

Project cost: £25 million

Architect: wHY, GRAS, Groves-Raines Architects

Multi-function performance pavilion
Indoor & outdoor performance & events venues
Visitor centre, viewing gallery & café
West Princes Street Gardens restoration & landscaping

Status: Proposed - due for completion by December 2019





______________________________________________________________________________________________


New Victoria Cinema Restoration
Southside | Restored Art Deco cinema

Links: Subject thread

Restoration of A-listed New Victoria Cinema (1930)
5 screens – total capacity of 748
Restaurant & bars

Status: Under construction





______________________________________________________________________________________________


Fruitmarket Gallery Expansion
Old Town | Expanded art gallery

Links: Subject thread | official website

Project cost: £6 million

Architect: Gareth Hoskins Architects

Expansion space for display, circulation & social areas

Status: Proposed





______________________________________________________________________________________________


Rose Theatre
New Town | Performing arts school & theatre

Links: Subject thread

Project cost: £1.8 million

Alternative proposal for former Charlotte Baptist Chapel
Ballet school, centre for the performing arts & dance company base
600 seat theatre

Status: Under construction





______________________________________________________________________________________________


Leith Theatre Restoration
Leith | Restored theatre

Links: Subject thread | official website

Project cost: £13 million

Phased refurbishment of B-listed theatre complex (1932)
Centre for drama, dance, music, visual arts, community activities and education
1,500 seat main auditorium & additional performance spaces

Status: Proposed





______________________________________________________________________________________________


University & School Developments


The Darwin Project
King's Buildings Campus, West Mains | Redeveloped biology complex

Link: Subject thread | official website

Project cost: £90 million

Architect: Feilden Clegg Bradley Studios

30,000 m² research space housing more than 800 scientists
Re-engineered Darwin Building housing Technology Hub
The Hive - classrooms, meeting rooms, a 200-person lecture theatre, café,
science studio, social learning space & administrative offices

Status: Under construction – due for completion by 2020





______________________________________________________________________________________________


School of Geosciences
King's Buildings Campus, West Mains | New geosciences complex

Link: Subject thread

Project cost: £60 million

Architect: John McAslan + Partners

21,000 m² new-build consolidating existing School of Geosciences facilities

Status: Proposed





______________________________________________________________________________________________


Higgs Centre for Innovation
Blackford | Space technology centre

Link: Subject thread

Project cost: £11 million

Architects: JM Architects, Jacobs

Dedicated forum focused on particle physics, astronomy & space science

Status: Under construction – due for completion in 2017





______________________________________________________________________________________________


Higgs Centre for Theoretical Physics
King's Buildings Campus, West Mains | Postgraduate research centre

Link: Subject thread

Architect: Austin-Smith: Lord

Postgraduate research centre
Laboratories, workrooms & seminar space

Status: Proposed





______________________________________________________________________________________________


Bayes Centre for Data Science & Technology
Southside | Innovation hub

Link: Subject thread

Project cost: £39 million

Architect: Bennetts Associates

Multidisciplinary hub supporting data technologies, data intensive research & data analytics

Status: Under construction – due for completion by early 2018





______________________________________________________________________________________________


McEwan Hall & Bristo Square Refurbishment
Southside | Historic refurbishment & redeveloped public realm

Link: Subject thread

Project cost: £35 million

Architect: LDN Architects

Restoration of A-listed graduation hall (1897)
New visitor and conference facilities
Re-landscaped Bristo Square & glazed entrance pavilion

Status: Under construction – due for completion by September 2017





______________________________________________________________________________________________


Edinburgh Futures Institute
Lauriston | University interdisciplinary hub

Link: Project thread

Project cost: £120 million

Architect: Bennetts Associates

Refurbished & redeveloped A-listed surgical hospital building (1879)
21,300 m² interdisciplinary institute for humanities, sciences, business & arts
Event space
New public square
Retail & leisure

Status: Approved - due for completion by mid 2021





______________________________________________________________________________________________


Old College Refurbishment
Southside | Refurbished Law School

Link: Subject thread

Project cost: £33.5 million

Architect: LDN Architects

Refurbishment of Law School within A-listed Old College (1789)
New law library

Status: Under construction – due for completion by late 2017





______________________________________________________________________________________________


Student Services Centre
Southside | Refurbished & extended student facilities

Link: Subject thread

Project cost: £75 million

Architect: Page\Park Architects

Refurbishment of B-listed Teviot Row House (1889), the world's oldest
purpose built student Union building, & new-build extensions
New student services building at No. 1 George Square

Status: Pre-planning - final phase due for completion by 2024





______________________________________________________________________________________________


Edinburgh College of Art Redevelopment
Lauriston | Refurbished facilities

Link: Subject thread

Project cost: £25.5 million

Architect: LDN Architects

Refurbishment of A-listed main building (1909)
Updating existing teaching, research & studio spaces
New 'West Court' multi-purpose studio

Future phase: refurbishment of former Scottish Fire and Rescue Service headquarters

Status: Under construction – due for completion by late 2018





______________________________________________________________________________________________


Easter Bush Innovation Centre & Campus Hub
Easter Bush, Midlothian | Campus hub

Link: Subject thread

Project cost: £30 million

Architect: Atkins Global

Centre of Comparative Pathology
International Centre for Livestock Improvement
Incubator space for animal bioscience
Science Outreach Centre
Retail, gym, exhibitions space & support services

Status: Under construction – due for completion by mid 2017





______________________________________________________________________________________________


Large Animal Research and Imaging Facility (LARIF)
Easter Bush, Midlothian | Animal welfare facility

Link: Subject thread

Project cost: £24 million

Architect: Sheppard Robson

Experimental large animal surgeries MRI, ultrasound and CT scanning for large animals
Leading imaging technologies for both anatomical and functional studies in vivo
Quality holding facilities for sheep, pigs and cattle

Status: Under construction – due for completion by late 2019





______________________________________________________________________________________________


Equine Diagnostic, Surgical and Critical Care Unit (EDSCCU)
Easter Bush, Midlothian | Animal welfare facility

Link: Subject thread

Project cost: £5 million

Architect: Sheppard Robson

Equine surgery & critical care unit
Centre for Health, Welfare and Rehabilitation of Racehorses

Status: Under construction – due for completion by Summer 2017





______________________________________________________________________________________________


Discovery & Innovation Centre
Heriot-Watt University, Riccarton | Research & innovation hub

Link: Subject thread

Project cost: £19 million

Architect: Sheppard Robson

5,000m² research & innovation building
Flexible work spaces, exhibition areas, theatre, laboratories, computing cluster, social spaces & café

Status: Planning – due for completion by 2020





______________________________________________________________________________________________


Boroughmuir High School
Fountainbridge | Replacement high school

Links: Subject thread | official website

Project cost: £35 million

Architect: Allan Murray Architects

Status: Under construction – due for completion by August 2017





______________________________________________________________________________________________


St John's RC Primary School
Duddingston | Replacement primary school

Links: Subject thread

Project cost: £11 million

Architect: Holmes Miller

Status: Approved





______________________________________________________________________________________________


CEC Rising Rolls Programme
Citywide | School expansion initiative

Links: Subject thread

Project cost: £20 million

Architect: Scott Brownrigg

Additional modular accommodation for primary schools & nurseries
74 additional classrooms constructed to date

Status: Under construction





______________________________________________________________________________________________


St Mary's Music School
New Town | Relocated residential school & performance venue

Links: Project thread

Project cost: £25 million

Architects: Richard Murphy Architects, Simpson & Brown Architects

Alternative proposal for Old Royal High School (1829)
Performance and rehearsal spaces created within original RHS building
New-build classroom block and residential accommodation for 70 children

Status: Approved





______________________________________________________________________________________________


Major Hotel Developments


Ocean Terminal
Leith | Waterfront hotel

Links: Subject thread

Architect: Keppie

230 rooms
Conference facilities

Status: Planning





______________________________________________________________________________________________


Rosewood Edinburgh
New Town | Five star hotel

Links: Project thread | official website

Project cost: £55 million

Architect: Gareth Hoskins Architects

Redeveloped Old Royal High School (1829)
160 rooms
Café & restaurant
Calton Hill visitor centre

Status: Planning





______________________________________________________________________________________________


Market Street
Old Town | Carlton Collection hotel

Links: Subject thread

Project cost: £20 million

Architect: JM Architects

98 rooms
Ground floor retail

Status: Under construction – due for completion by Spring 2018





______________________________________________________________________________________________


India Buildings
Old Town | Four star hotel

Links: Project thread

Project cost: £65 million

Architect: Ica Architects

267 rooms
Ground floor retail

Status: Approved





______________________________________________________________________________________________


Oriam: National Performance Centre for Sport
Riccarton | Marriott Courtyard hotel

Links: Project thread

Architect: Studioånyo

160 rooms

Status: Under construction - due for completion by Summer 2017





______________________________________________________________________________________________


Torphichen Street
West End | Four star hotel

Links: Project thread

Architect: CDA

150 rooms

Status: Approved - due for completion by early 2019





______________________________________________________________________________________________


Edinburgh Airport I
Ingliston | Hampton by Hilton hotel

Links: Subject thread

Project cost: £13.3 million

Architect: Leach Rhodes Walker

240 rooms

Status: Under construction - due for completion by November 2018





______________________________________________________________________________________________


Edinburgh Airport II
Ingliston | Marriott Moxy hotel

Links: Subject thread

Architect: Faithful + Gould

213 rooms

Status: Under construction - due for completion by mid 2018





______________________________________________________________________________________________


Ocean Point
Leith | Waterfront hotel

Links: Subject thread

Architects: Gilberts

250 rooms

Status: Approved





______________________________________________________________________________________________


Public Realm Developments


George Street Public Realm Project
New Town | Multi-functional street space

Links: Project thread

Project cost: £28 million

Architect: Ironside Farrar

Re-establishing the primacy of the street within the First New Town Plan
Develop a premier civic, retail & leisure place
Rebalanced transport movements to reduce traffic flows & support active travel

Status: Proposed – due for completion by 2022





______________________________________________________________________________________________


City Centre West to East Cycle Link Project
Citywide | Cycle route

Links: Subject thread

Project cost: £5.5 million

Roseburn to Leith Walk cycle route with protected cycle lanes on main roads
Streetscape / public realm improvements
Improved pedestrian and cyclist facilities

Status: Approved





______________________________________________________________________________________________


Saughton Park Revitalisation
Saughton | Historic park restoration

Links: Subject thread

Project cost: £5.8 million

Architect: Sutherland Hussey Harris, Ironside Farrar

Renovation of walled garden, footpaths and other historic park features
Replacement Winter Garden
New café & community facilities

Status: Under construction – due for completion by August 2018





______________________________________________________________________________________________


Little France Park
Little France | New public park

Links: Subject thread

Project cost: £2.25 million

Architect: Optimised Environments (OPEN)

112 acres

Existing landscape features enhanced & extended
Wetland habitats, woodland planting, meadow grassland & space for events or informal sports
High-quality cycle & pedestrian route through park connecting to existing network

Status: Planning – due for completion by 2019





______________________________________________________________________________________________


Treverlen Park
Duddingston | New public park

Links: Subject thread

Project cost: £1 million

Architect: HERE+NOW, Holmes Miller

5.5 acres

Scots pine urban forest, wildflower meadows & boulder play areas
Outdoor teaching facility

Status: Planning





______________________________________________________________________________________________


Leith Walk Green Bridge
Leith | Multi-functional street space

Links: Subject thread

Project cost: £4.8 million

Architect: Biomorphis

New pedestrian & cycle route utilising former Caledonian Railway's Leith New Lines
Elevated linear park & wildlife corridor
New timber frame bridge crossing Leith Walk

Status: Proposed





______________________________________________________________________________________________


The Causey Project
Southside | Public Realm Improvements

Links: Subject thread | Official website

Project cost: £1.6 million

Architect: Ironside Farrar

Reinstatement & celebration of historic street space
Create pedestrianised space for community & arts events

Status: Proposed





______________________________________________________________________________________________


Science & Healthcare Developments


Edinburgh BioQuarter
Little France | Biomedical research & business campus

Links: Project thread | official website

Project cost: £800 million

Architects: Allan Murray Architects, Michael Laird Architects, Sheppard Robson, Stantec

100 acres

46,000 m² academic research space
84,000 m² commercial research space

Current phase: £54m Institution for Regeneration and Repair (IRR)
Future phase: £32m Usher Institute for Population Health Sciences & Multi Occupancy Building 2

Status: Under construction





______________________________________________________________________________________________


Royal Hospital for Children and Young People (RHCYP)
Little France | Replacement pediatric hospital

Links: Subject thread | official website

Project cost: £165 million

Architects: HLM Architects

Replacement RHSC, bringing pediatric care, specialist neonatal care, neurosciences
and adult & children’s emergency departments together in a centre of excellence

Status: Under construction - due for completion by Autumn 2018





______________________________________________________________________________________________


Royal Edinburgh Hospital Campus
Morningside | Psychiatric & mental health care hospital redevelopment

Links: Subject thread

Project cost: £168 million

Architects: Archial NORR

Replacement of inpatient facilities with modern, fit-for-purpose healthcare buildings

Status: Under construction





______________________________________________________________________________________________


Scottish National Blood Transfusion Service (SNBTS)
Riccarton | National centre for blood, tissues & cell testing

Links: Subject thread

Project cost: £36.4 million

Architect: Reiach and Hall Architects

Blood & tissue processing and testing facilities
Research & development
Consolidation of SNBTS core activities & related services in a single centre of excellence

Status: Under construction - due for completion by Spring 2017





______________________________________________________________________________________________


Allermuir Health Centre
Colinton | Community medical centre

Links: Subject thread

Project cost: £7.3 million

Architect: Gareth Hoskins Architects

Accommodation for two GP practices, primary care & community services

Status: Under construction – due for completion by late 2017




______________________________________________________________________________________________


Pennywell All Care Centre
Muirhouse | Community medical centre

Links: Subject thread

Project cost: £12.1 million

Architect: Holmes Miller

New GP accommodation, physiotherapy, podiatry, dentistry, child health & community services

Status: Under construction – due for completion by late 2017





______________________________________________________________________________________________


Major Office Developments


2 Semple Street
Fountainbridge | Office development

Links: Subject thread | official website

Architect: Michael Laird Architects

3,300 m² office space
1,000 m² retail space

Status: Under construction – due for completion by July 2018





______________________________________________________________________________________________


Capital Square
West End | Office development

Links: Subject thread | official website

Project cost: £33 million

Architect: Hurd Rolland Partnership

11,400 m² office space

Status: Approved – due for completion by early 2020





______________________________________________________________________________________________


Edinburgh Park South
South Gyle | Business park expansion

Links: Project thread | official website

Project cost: £400 million

Architect: Dixon Jones

50 acres

Office-led mixed use development with residential, retail & leisure
Up to 100,000 m² office space

Status: Proposed





______________________________________________________________________________________________


Major Residential Developments


Edinburgh's Garden District
West Edinburgh | New residential district

Links: Project thread | official website

Project cost: £917 million

Architects: Duany Plater-Zyberk & Company (DPZ), Michael Laird Architects,
Merrill Pastor & Colgan Architects, EMA Architecture + Design

650 acres

6,200 homes
The Calyx – Scotland's National Garden
Sports hub
Schools & community facilities

Status: Phase 1 approved / called in





______________________________________________________________________________________________


21st Century Homes for Edinburgh
Citywide | Housing replacement programme

Links: Subject thread | official website

Project cost: £170 million

1,400 affordable homes for sale & rent
Gracemount, North Sighthill, Pennywell & Muirhouse, Leith Fort, Greendykes & Craigmillar

Status: Under construction





______________________________________________________________________________________________


Shawfair
Midlothian/SE Edinburgh | New residential district

Links: Project thread | official website

Project cost: £1.2 billion

202 hectares

4,000 homes
100,000 m² commercial & retail space
2 primary schools
Secondary school
Railway station

Status: Under construction





______________________________________________________________________________________________


Shrubhill
Broughton | Residential development

Links: Project thread

Project cost: £95 million

Architects: Cooper Cromar, Acanthus Architects DF, Morgan McDonnell Architects

375 homes
260 room student residence
Ground floor retail

Status: Under construction – due for completion by Spring 2020





______________________________________________________________________________________________


Donaldson's College
Haymarket | Luxury residential development

Link: Project thread

Architect: Richard Murphy Architects

18 acres

117 homes within redeveloped A-listed hospital building (1851)
84 new-build homes

Status: Under construction





______________________________________________________________________________________________


Waterfront Plaza
Leith | Residential development

Link: Subject thread

Architect: EMA Architecture + Design

425 homes – flats, townhouses & colonies - on former brownfield site

Status: Planning





______________________________________________________________________________________________


Canonmills Garden
Canonmills | Residential development

Link: Subject thread

Architect: Sheppard Robson

184 homes on former brownfield site

Status: Approved - due for completion by 2020





______________________________________________________________________________________________


Former Boroughmuir High School
Bruntsfield | Residential conversion

Link: Subject thread


Project cost: £14.5 million

Architect: Michael Laird Architects

87 homes within B-listed former high school (1913)
28 affordable homes in new-build block & converted annex

Status: Refused





______________________________________________________________________________________________


Craighouse Campus
Craiglockhart | Residential conversion

Link: Subject thread | official website

Project cost: £80 million

Architect: Oberlanders Architects, CDA

51 acres

64 homes within 7 redeveloped A-listed buildings,
incl. Old Craig House (1565) & New Craig House (1889)
81 new-build homes

Status: Under construction





______________________________________________________________________________________________


New Brunstane
Newhailes | New residential district

Link: Subject thread

Architect: AREA Urban Design & Architecture

49 hectares

1,330 homes
Primary school
Local centre

Status: Approved





______________________________________________________________________________________________


Student Accommodation Developments


125a Fountainbridge
Fountainbridge | Post-graduate student accommodation

Link: Project thread

Project cost: £17 million

Architect: Michael Laird Architects

263 room student residence
Ground floor retail & leisure

Status: Under construction – due for completion by July 2018





______________________________________________________________________________________________


St Leonard's Residences
Southside | Student accommodation

Link: Project thread

Project cost: £38 million

Architects: Allan Murray Architects

579 bed student residence
Ground floor retail

Status: Under construction – due for completion by August 2017





______________________________________________________________________________________________


Lutton Place
Southside | Student accommodation

Link: Project thread

Project cost: £12 million

Architects: JM Architects

235 bed student residence

Status: Under construction – due for completion by August 2017





______________________________________________________________________________________________


Buccleuch Place & Meadow Lane
Southside | Post-graduate student accommodation

Link: Project thread

Project cost: £21 million

Architects: JM Architects

380 bed student residence

Status: Under construction – due for completion by August 2017





______________________________________________________________________________________________


Sport & Leisure Developments


Meadowbank Sports Centre
Meadowbank | Multi-purpose sports facility

Link: Subject thread

Project cost: £43 million

Architect: Holmes Miller

Outdoor athletics track with jumps space & 500 seat stand
Outdoor throwing area
2 FIFA 1 3G pitches
2 multi sport games halls
3 fitness studios
2 squash courts
Combat studio gym, boxing gym & gymnastics hall
60m 6 lane indoor athletics track & jumps space
Café & meeting rooms

Status: Pre-planning





______________________________________________________________________________________________


Tynecastle Stadium Redevelopment
Gorgie | Football stadium redevelopment

Link: Subject thread

Project cost: £12 million

Architect: James Clydesdale & Associates

New 7000 capacity main stand
Restaurant/bar, club shop, corporate facilities
Upgraded existing stands
Community facilities
Relocated Tynecastle Nursery

Status: Under construction – due for completion by September 2017





______________________________________________________________________________________________


Edinburgh Academical Club Sports Ground Redevelopment
Stockbridge | New rugby stadium

Link: Subject thread

Project cost: £8 million

Architect: Michael Laird Architects

5,000-seat stadium
Museum, retail & clubhouse

Status: Under construction





______________________________________________________________________________________________


Regional Cycling Facility
Niddrie | Cycling sports hub

Link: Subject thread

Project cost: £6.8 million

Architect: Reiach and Hall Architects

Outdoor velodrome
National competition standard BMX track & pump track
Improvements to Jack Kane Sports Centre incl. two 3G pitches

Status: Planning





______________________________________________________________________________________________


Wavegarden Edinburgh
Ratho | Surfing centre

Links: Subject thread | official website

Project cost: £10 million

Architect: Harrison Stevens

50 acres

Artificial wave pool
Surf school
Camping pitches & pods
Country park

Status: Pre-planning





______________________________________________________________________________________________


Transport & Infrastructure Developments


Queensferry Crossing
Firth of Forth | Road bridge

Links: Project thread | official website

Project cost: £1.4 billion

Cable-stayed dual two-lane road bridge connecting Edinburgh to Fife
Height: 207 m | Length: 2,700 m

Status: Under construction – due for completion by Summer 2017





______________________________________________________________________________________________


Edinburgh Waverley Renewal
East End | Station improvement programme

Links: Subject thread | official website

Project cost: £130 million

Replacement of 34,000 m² glazed roof
Upgraded Princes Street & Market Street entrances with escalator & lift access
New platform canopies & station furniture
Refurbishment of existing buildings & concourse

Current phase:
2 new long-length platforms
3 existing platforms extended

Status: Under construction





______________________________________________________________________________________________


Edinburgh to Glasgow Improvement Programme (EGIP)
Central Belt | Railway infrastructure upgrade initiative

Links: Project thread | official website

Project cost: £740 million

93 mi/150 km line electrification
3 redeveloped stations - Queen Street, Haymarket & Cumbernauld
Platform lengthening
Edinburgh Waverley station improvements
Signalling improvements
Junction upgrades
Millerhill depot
New Edinburgh International Gateway station

Status: Under construction – due for completion by 2019





______________________________________________________________________________________________


Edinburgh Airport Expansion
Ingliston | Airport expansion programme

Links: Project thread | official website

Project cost: £220+ million

Architect: Archial NORR

Current £80m phase: new baggage & immigration halls, 6 new contact stands
Future phases: terminal building extension, new access road, 5 new remote aircraft stands

Status: Under construction





______________________________________________________________________________________________


Edinburgh Tram Network
Citywide | Tram line extension proposals

Links: Project thread | official website

Completion of Line 1 (North Edinburgh) – 7.9 mi/12.7 km, Picardy Place to Haymarket, 18 stops

Line 2 branch (West Edinburgh) – 2.5 mi/4 km, Ingliston to Newbridge, 4 stops

Line 3 (South East Edinburgh) – 6 mi/9.6 km, Edinburgh Waverley to Newcraighall, 20 stops

Status: Under consideration





______________________________________________________________________________________________


Edinburgh Orbital Bus Project
Region-wide | Rapid transit system

Links: Subject thread

Project cost: £55 million

Segregated orbital bus route linking QMU/Musselburgh station to Newbridge via:
ERI/BioQuarter, Sheriffhall, Straiton, Lothianburn, HWU, Hermiston, Edinburgh Park, Gogar & EDI
Bespoke "streetcar" vehicles running 12 times per hour
Estimated demand c. 6 milion passengers per annum

Status: Proposed





______________________________________________________________________________________________


Cross-Forth Hovercraft
Fife & Edinburgh | Hovercraft service

Links: Subject thread

Project cost: £10 million

Kirkcaldy to Newhaven passenger service
17 minute journey time

Status: Proposed





______________________________________________________________________________________________


A720 Sheriffhall Roundabout
Sheriffhall, Midlothian | Junction improvements

Links: Subject thread | official website

New grade-separated junction

Status: Pre-planning





______________________________________________________________________________________________


Other Major Projects


Pentland Studios
Straiton, Midlothian | Film & TV production facility

Links: Subject thread | official website

Project cost: £230 million

Architect: Keppie

86 acres

12,000 m² studio space across six sound stages
Two backlots - 8.6 acres & 20.14 acres
4,000 m² external water-stage
5,000 m² workshops & production office space
Film academy & student accommodation
180 room hotel
Visitor centre
Data centre, satellite-link 'earth station' & CHP energy centre

Status: Approved





______________________________________________________________________________________________


Royal Botanic Garden Redevelopment
Inverleith | Redeveloped educational & visitor facilities

Links: Official website

Project cost: £40 million

Architect: Smith Scott Mullan Associates

Scottish School of Botany & Horticulture
Glasshouses expansion & visitor facilities redevelopment

Status: Proposed





______________________________________________________________________________________________


Scotland's National Showground
Ingliston | RHC redevelopment

Links: Project thread | official website

Project cost: £30 million

Architect: Optimised Environments (OPEN), 3D Reid

300 acres

Redevelopment of showground & Royal Highland Centre facilities
170 room hotel
140 room hotel
Leisure & office space
Rural Centre of Excellence
Agribusiness hub

Status: Under construction





______________________________________________________________________________________________


Millerhill Resource & Energy Recovery Centre (RERC)
Millerhill, Midlothian | Energy-From-Waste Plant

Links: Subject thread

Project cost: £142 million

Architect: Garry Stewart Design Associates

State-of-the-art energy-from-waste plant serving Edinburgh & Midlothian
Will treat around 135,000 tonnes of household residual waste a year,
generating sufficient electricity to power 32,000 homes

Status: Under construction – due for completion by 2019





______________________________________________________________________________________________


 