SkyscraperCity banner

201 - 209 of 209 Posts

·
Moderator
Joined
·
12,152 Posts
Discussion Starter #202
Consultation launched for the new Maybury Primary School & Health Centre at West Craigs by Architype, running until 29th March.

Proposal Detail
  • The school site is located in between the proposed ‘Civic Gateway’ and an area of community open green space. The site makes the most of the local public transport links and the school will be constructed to the ultra-low energy Passivhaus standard.
  • The Primary School is to be constructed in two phases, initially providing accommodation for up to 420 pupils (14 classes), with Phase 2 extending provision to 630 pupils (21 classes).
  • The building also includes a 128-place nursery which will be delivered in Phase 1.
  • A Health Centre accommodating a new GP Practice and community services delivered by the Edinburgh Health & Social Care Partnership will also be delivered in Phase 1. This will provide healthcare facilities for up to 10,000 patients from the surrounding communities
  • The building will welcome community use with halls, activity studio and a sports pitch.








 

·
Moderator
Joined
·
12,152 Posts
Discussion Starter #203
Emerging design of the replacement Currie Community High School by Passivhaus specialists Architype. More details on CEC's project page.







Renewed energy for schools of the future

The City of Edinburgh Council - 17th February 2021

Innovative plans and images that will make the new Currie Community High School one of the most energy efficient high schools in Scotland have been unveiled.

The campus will be the first Passivhaus-designed high school in the country setting the standard for energy consumption across school estates. Passivhaus is a rigorous energy standard which reduces the amount of energy needed for heating by up to 90%. It also lowers the total amount of energy used by around 70% and minimises carbon emissions. The new school will support Edinburgh’s aim of net zero emissions by 2030.

At the heart of the new school plans are five core elements: education, inclusion, outdoor learning and sustainability, digital learning and community access. The school will have a series of learning zones for pupils with breakout areas which include:
  • Science, Technology, Engineering and Maths (STEM) over 3 levels with dual-teaching classrooms, science labs, technician areas and a learning plaza
  • Languages and Humanities with dual-teaching classrooms, learning plaza and a debating chamber
  • Expressive Arts with music rooms, a recording studio, art studios including a kiln room, dance studios, drama studio and stage
  • Health and Wellbeing with a gym hall, games hall, fitness suite and swimming pool, food technology and hospitality
  • Integrated Support with wellbeing hub, support for learning classroom, a sensory room and a sensory garden
There is a strong emphasis on outdoor learning with the creation of a special terrace on the second floor providing all of the learning zones with immediate access to external teaching spaces. This focus will shape the curriculum on offer and ensure these outdoor spaces promote sustainability and link lifelong learning to the surrounding grounds of the school and community.

Health and wellbeing also feature prominently in the designs with the creation of a dedicated wellbeing hub and separate wellness centre to support pupils. The hub will be based in the integrated support zone and is a dedicated room in a quiet location which can be used as part of a planned alternative/flexible timetable to help young people learn in a variety of settings. The wellness centre will be in the community and sports side of the building and will provide a space for counselling and activities to support improved mental health.

A series of engagement events have been held with staff, pupils from both the high school and cluster primary schools, parents and the local community in the past two years as the plans have been developed. As a result of this early community engagement the new building will offer the community daytime, evening and weekend access to an intergenerational community hub. Visitors can drop in to the library space in the foyer, access meeting rooms and digital services, visit the café, keep healthy at the gym and pool or enjoy a walk around the grounds.

The new school is one of the projects included in the first phase of the Scottish Government's Learning Estate Investment Programme. It will be designed in line with the guiding principles of the Scottish Government’s Learning Estate Strategy and is expected to be completed in 2024.

Jenny Smith, Currie Community High School Head Teacher, said:

"We’re incredibly excited as a community about our new school. The designs are coming together beautifully and truly representative of our community vision for education and lifelong learning. Our new school is going to be innovative and pioneering in every way, very much flying the Passivhaus flag, and of course, the first of its kind in Scotland.

"This is an opportunity like no other to venture into the world of 21st century education. Currie Community High School is an ambitious and aspirational school for all with the principles of inclusive practice permeating everything we do. The inclusive spaces in the new build will continue to strengthen our work where the future generations of Currie will benefit from an experience where everyone can reach their amazing potential. Although, uncertainty will prevail in an unfolding unpredictable world, it is what we can achieve together as a community that best prepares our young people to embrace the exciting unknown.

"The emphasis of our new build will be on enhancing the learner experience through exciting use of new versatile, transformational spaces within learning plazas, break-out areas and classroom settings. These spaces, all fit for purpose, will enable learning to take place in a variety of ways, creating conditions where young people can continue to contribute and have impact on the global community that surrounds them."

Councillor Ian Perry, Education, Children and Families Convener for the City of Edinburgh Council, said:

"These are really exciting times for the Currie community as these pioneering designs really are the blueprint for the schools of the future. There are so many innovative elements to the plans with energy efficiency at its centre. This will make the new campus the first high school in Scotland to meet Passivhaus standards and supports Edinburgh’s aim of net zero emissions by 2030.

"The new Currie Community High School will provide a first-class learning environment and an exciting, inspirational and creative hub for the whole community. This is an exciting period for education in the Capital with recent new builds and projects under construction demonstrating our ambitious new school building programme with £500m investment planned over the next 10 years."

Councillor Alison Dickie, Education, Children and Families Vice Convener for the City of Edinburgh Council, said:

"As a Council we are taking every opportunity to innovatively build schools for the future that are fit for 21st Century learning and the plans for the new Currie Community High School really do tick all the boxes. I’m really pleased to see that inclusion and health and wellbeing form key parts of the designs with the creation of the two hubs. It’s so important the new schools support greater accessibility and inclusion for all our young people especially with the immense challenges they have faced in the past year.

"There’s been plenty of positive engagement with parents, pupils and the local community over the past two years which has helped shape these plans and given everyone a real sense of ownership of the new school. We’ll make sure this continues as these exciting designs are taken forward with the new school expected to open its doors in 2024."
 

·
Moderator
Joined
·
12,152 Posts
Discussion Starter #205
PAN submitted by Architype for the replacement Currie Community High School.

21/01226/PAN | Construction of a new community highschool, swimming pool and sports facilities within the grounds of the existing school plus associated external landscaping and car parking. Demolition of the existing school building. | Currie High School 31 Dolphin Avenue Currie EH14 5RD



Online consultation in April via CEC's consultation hub.
 

·
Moderator
Joined
·
12,152 Posts
Discussion Starter #207
Application submitted by James Clydesdale & Associates to repair & upgrade Myreside Pavilion at George Watson's College, which was damaged by fire earlier this year.

20/04766/FUL | Alterations improvements and improvements to fire damaged sports pavilion. Providing access for the disabled. | 79 Myreside Road Edinburgh EH10 5DB











Application approved.
 

·
Moderator
Joined
·
12,152 Posts
Discussion Starter #208
Application submitted for a Learning Hub at Harmeny School in Balerno by Loader Monteith Architects & Sarah Jane Storrie Architects. The proposed building will accommodate an extended secondary, art, design and technology programme for the children’s charity.

20/04059/FUL | Single storey learning hub including demolition of existing outdoor centre and construction of new teaching and outdoor rooms, external terraces and pathways, and cloister. | Harmeny School 45 Mansfield Road Balerno EH14 7JY



















New renders of Loader Monteith Architects & Sarah Jane Storrie Architects' consented Learning Hub at Harmeny School via Urban Realm.











 
201 - 209 of 209 Posts
Top