The Ministry of Works and Housing has announced its strategic road plan that covers all parts in the Kingdom.
The Assistant Undersecretary of Roads, Essam Abdullah Khalaf, announced some projects that are set to start soon. One of these is the development of Bahrain Bay Road leading to Al Jazaer beach. It would include expansion of the road from one lane to two lanes in each side. The project also includes city centre interchange, Bahrain map junction, Isa Town Gate roundabout, Mina Salman junction and Shaikh Isa bin Salman Highway.
BD425 million will be allocated for a comprehensive development of the road network, including the construction of new roads, highways and flyovers.
.
 

·
Registered
Joined
·
701 Posts
I wonder if city centre interchange is to do with the mall....they will need some development of the roads inside seef district in the near future.
 

·
Registered
Joined
·
701 Posts
tunnels? all i see is flyovers bro :lol: but yeah i know what u mean by looking like dubai....also my friend told me that one of the reasons they dont build tunnels is because bahrain has natural water underneath the ground...but i dont know how credible that is maybe he just made it up :lol:
 

·
Registered
Joined
·
222 Posts
Discussion Starter · #5 ·
maybe..well there is ONE tunnel on the right lol i just hope they bring in some new ideas for roads planning etc. Bahrain needs to have its own identity seperate from other gulf countries..freedom for example. Bahrain is recognized for it and everyone lives better lives with it.
 

·
Registered
Joined
·
701 Posts
ohhhh silly me i didnt notice that :lol: ...yeah that looks cool! the king faisal road will end up having some really advanced road developments no doubt when bfh and and bahrain bay are well on the way. So thats one to watch out for! I think with the roads and development in that area we will have one of the best looking waterfront cbds in the gulf inshAllah.
 

·
Registered
Joined
·
222 Posts
Discussion Starter · #7 ·
ye 4sure it will be one of the best..i much prefer King Faisal (considering it has a waterfront) from sheikh zayed road..oo i can just imagine going down that highway and smiling :) *i wont get into any accidents i swear* Yalla Bahrain!
 

·
Registered User
Joined
·
2,424 Posts
Thats goood to hear, but they better get started sooon.... and work quickly.... Dubai constructs flyovers in like 3 or 4 months.... Bahrain took almost 2 yrs for the seef flyover...!! Bahrain is sooooooooooooo slow at improving and constructing and maintaing roads, soooooo slow, i don't understand.... It took them approx. 11 months to fix the sewage in a small tiny road next to my house... And about 8-10 months i think to do the same along the Saar road, which is a small road, but a very important one... It was sooo inconvenient....
 

·
Registered
Joined
·
701 Posts
Is the Saar Road finished? Man that diversion was crazy, it added at least another 10 minuites to the jouney...I was often late because of it!!!
 

·
Registered
Joined
·
755 Posts
البحرين بحاجة لإنشاء شبكة للطيران الجوي‮ ‬



أوصى تقرير‮ »‬سكدمور‮« ‬بضرورة تعزيز وجود البحرين كمركز اقليمي‮ ‬للطيران وانشاء شبكة للطيران الجوي‮ ‬يدعم موقع البحرين الجغرافي‮.‬
ويرى التقرير امكانية توسيع هذا الدور،‮ ‬حيث ان أقوى نقطة اتصال تصل البحرين بدول الخليج العربي‮ ‬هو جسر الملك فهد،‮ ‬كما ان الجسر الذي‮ ‬سيمتد بين البحرين وقطر سيكون له تأثير كبير على حركة السفر والترحال وبشكل خاص التنقل بين البحرين والسعودية وقطر،‮ ‬مع الالتفات الى ان البحرين سيثري‮ ‬الأهداف التجارية وكذلك الترفيهية بين البحرين وقطر‮.‬
ويعد مطار البحرين خامس أكبر مطار على مستوى الشرق الأوسط،‮ ‬كما ان السعة الاستيعابية للمدرج مهيئة لمشاريع التوسعة والنمو على حسب الاحتياجات المطلوبة‮. ‬ويدور جدل حول موقع المطار وأهم المواقع والوجهات في‮ ‬البحرين مثل المنامة والموانئ وشبكة الطرق مثلما هو الحال مع نقاط الاتصال الدولية من خلال دول مجلس التعاون والتي‮ ‬تشكل عاملاً‮ ‬عند اعادة النظر في‮ ‬المواقع‮.‬
كما تتم دراسة خطوط الرحلات الجوية التي‮ ‬تطوف بدول مجلس التعاون وتمر بالنطاق الجوي‮ ‬للبحرين لتوفير رحلات مباشرة ما بين السعودية وقطر،‮ ‬وعلى ضوء ذلك فإن ظروف تغيير موقع الارساء الجوي‮ ‬في‮ ‬أي‮ ‬نقطة بالبحرين ستتأثر بالظروف المحيطة مثل الحاجة الى إحداث توسعة مستقبلية وامكانية استيعاب الطموح المستقبل للمطار‮. ‬ولم‮ ‬يتم الاستقرار بشكل نهائي‮ ‬على الموقع الآخر بعد،‮ ‬وإنما ستتحرر الرؤى بعد تدشين جسر البحرين وقطر‮.‬
وتشير احصائيات في‮ ‬عام ‮٤٠٠٢ ‬الى ان عدد المسافرين من مطار البحرين الى دبي‮ ‬بلغ‮ ٧.١٢ ‬مليون والى جدة ‮٤.١٢ ‬مليون والى الرياض ‮٢.٠١ ‬مليون والى أبوظبي‮ ٢.٥ ‬والى البحرين ‮١.٢ ‬مليون مسافر‮.‬
وتبلغ‮ ‬نسبة نمو معدلات المسافرين بمقارنة احصائيات عامي‮ ٤٠٠٢ ‬بعام ‮١٠٠٢ ‬أكثر من ‮١٣‬٪‮ ‬خلال ثلاث سنوات،‮ ‬كما ارتفع عدد الركاب المغادرين والواصلين الى البحرين خلال السنوات الثلاث الماضية بنسبة ‮٤٥‬٪‮.‬
ويواجه مطار البحرين الدولي‮ ‬عدداً‮ ‬من العقبات منها ان الطريق العام المؤدي‮ ‬حالياً‮ ‬الى المطار،‮ ‬وكذلك المواصلات المتوفرة للوصول الى المطار‮ ‬غير قادرة على دعم الطموح المتوقع لتزايد عدد المسافرين مستقبلاً‮.‬
وهناك نقص في‮ ‬آليات النقل العام المتوفرة،‮ ‬وكذلك المشتركة مع نظام التاكسي‮.‬
كما تخوف التقرير من العلاقة‮ »‬الصعبة‮« ‬التي‮ ‬تجمع المطار والمشاريع التطويرية المحيطة به‮.‬
واقترح التقرير اعادة النظر في‮ ‬هيكلة المطار والموانئ وان تأخذ الخطط المستقبلية استراتيجية النمو في‮ ‬دول الخليج العرب ككل وليس كجهة سفر‮.‬​
 

·
Bahraini_guy
Joined
·
338 Posts
Pearl of the Gulf said:
البحرين بحاجة لإنشاء شبكة للطيران الجوي‮ ‬




ويعد مطار البحرين خامس أكبر مطار على مستوى الشرق الأوسط،‮ ‬كما ان السعة الاستيعابية للمدرج مهيئة لمشاريع التوسعة والنمو على حسب الاحتياجات المطلوبة‮. ‬ويدور جدل حول موقع المطار وأهم المواقع والوجهات في‮ ‬البحرين مثل المنامة والموانئ وشبكة الطرق مثلما هو الحال مع نقاط الاتصال الدولية من خلال دول مجلس التعاون والتي‮ ‬تشكل عاملاً‮ ‬عند اعادة النظر في‮ ‬المواقع‮.‬
.‬​
Is this real? Bahrain's airport is the 5th biggest airport in the middle east? how come?
 

·
Registered
Joined
·
755 Posts
^^ I’m not really sure. The important part is they are starting to think about other means of transport to and from the airport. Build another route that doesn’t have to take you through Manama. Create shuttle-bus services to major hotels and centres. Cause when you think about it they want and expect a lot more people coming to the country and what choices do they really have other than old miserable taxis.
 

·
Registered
Joined
·
755 Posts
PM orders roads development



Manama, May. 9, (BNA) Prime Minister, Shaikh Khalifa bin Salman Al Khalifa, gave his directives for immediate development of three intersections and roundabouts to solve traffic congestion.
development covers the intersections of Shaikh Isa road with road 35 and Shaikh Isa and Mina Salman roads in addition to the roundabout opposite Isa Town gate. The Premier's orders came during a work meeting held today with Minister of Works and Housing, Fahmi Al Jawder, to monitor the progress of road development projects that include designs, fly-overs and tunnels, aimed at easing the traffic flow. A total of 13 roundabouts and intersections are to be developed on the kingdom's main roads. The Premier gave his directives to all concerned ministries to speed up the implementation of these projects and to take into consideration the protection of electricity, water and telephone lines. Meanwhile, the Minister of Works and Housing briefed the Premier on the preliminary designs and beautification of the fifth development phase of Shaikh Khalifa bin Salman which was completed last March and listened to the Premier's observations and directives with regard to beautification work and designs on the mentioned road. He also ordered immediate development of Hilat Bu Maher where a hall and housing facilities will be built, roads will be made and services provided. It is also worth noting that the government has allocated around BD 80 million, of which BD 64 million for the development of intersections and roundabouts and BD 15.5 million for extending electricity and water to these intersections. In this light, the Premier ordered to speed up work to complete these projects within deadlines. He also gave directives to take into account future planning in the country while constructing roads and other infrastructural projects in a way that takes into consideration the increasing number of cars and construction and housing expansion. The Premier also issued orders to the Ministry of Works and Housing on the importance of taking into consideration the beautification aspects when undertaking the mentioned projects to reinforce the economic status of the Kingdom of Bahrain. Shaikh Khalifa affirmed during the meeting that the government will not stop expansion of housing projects and services as they stand vital constituents of citizens' life, stressing that services are important in citizens' lives.
 

·
Registered
Joined
·
701 Posts
BD60m highway payouts on way
15/06/06


By MOHAMMED AL A'ALI

COMPENSATIONS for landowners north and south of Shaikh Isa bin Salman Highway is expected to reach around BD60 million, it was claimed yesterday.

The large sum of compensation is expected to be paid by the government due to landowners refusing to sell their property, claiming they are being forced to sell for less than it is worth.

Landowners are concerned they are being offered current rates rather than how much the lands will be worth in the future, particularly since they don't want to sell.

The lands, located near Salmabad and Sehla, have been earmarked for investment and housing projects, including the Investment Towers project that has already been approved.

Central Municipal Council municipal affairs committee chairman Sayed Abdulla Al A'ali said the landowners were upset because they believed their land was worth more than what the Municipalities and Agriculture Ministry is planning to offer.

"They (ministry officials) are currently preparing compensation packages on the basis that the landowners are going to accept, but none want to leave," he said.

"By law, the government is entitled to take 30 per cent for free from the land without any compensation for public projects, and off course buy the remaining part without any objections.

"The problem is that the ministry deals with certain real estate agents which provide a list of current rates rather than the amount of compensations according to the lands' prices in five years time, particularly since that their owners are not planning to sell them.

"The landowners are being forced to accept, because they have no other choice, and with the rate the ministry decides, or have their lands taken away for free.

"The story behind this area has been going on for a long time, with landowners doing their best to stay, but it seems that the ministry wants their lands more than before now, considering that land prices are going up.

At last week's session, Parliament demanded the government urgently complete a survey on the lands.

MPs said the ministry should take immediate action to complete the process to allow the building of investment and housing projects.

The issue will be discussed in Parliament next Tuesday in the presence of Municipalities and Agriculture Minister Ali Al Saleh on the request of Minister of State for Shura Council and Parliament Affairs Abdulaziz Al Fadhel.

link
 

·
Registered
Joined
·
250 Posts
Skyline-BRN said:
Is the Saar Road finished? Man that diversion was crazy, it added at least another 10 minuites to the jouney...I was often late because of it!!!
well because of that stupid diversion I couldn't have my Shawarma Express in Saar last night :'(
 

·
Bahraini_guy
Joined
·
338 Posts
بتكلفة مليون ونصف المليون دينار:
جسر جديد من منطقة السيف باتجاه المنامة



بتكلفة تصل إلى حوالي المليون والنصف مليون دينار بحريني أعلنت وزارة الأشغال والإسكان ترسية مشروع إنشاء جسر علوي ذو مسارين في اتجاه واحد للمرور الخارج من شارع 38 بالقرب من سيتي بنك بضاحية السيف، والمتجه شرقا باتجاه المنامة والمحرق بالاضافة إلى تطوير شارع الشيخ خليفة بن سلمان في الجزء الواقع بين دوار السوق المركزي وشارع 38،

على شركة حبيب علي عواجي وأولاده ومن المتوقع الانتهاء من جميع الأعمال وفتح الطريق للحركة المرورية بعد 14 شهرا من بدء التنفيذ.وأفاد السيد عصام عبدالله خلف الوكيل المساعد للطرق بأن المشروع يتضمن إنشاء مسارات إضافية على جانبي شارع الشيخ خليفة بن سلمان بالإضافة إلى توفير مسار للدوران العكسي للمرور القادم من الغرب والمتجه إلى ضاحية السيف وسيتي سنتر (مجمع الفطيم التجاري). وأوضح خلف أن هذا المشروع يهدف إلى توفير مخرج رئيسي من ضاحية السيف باتجاه المنامة عند سيتي بنك بالإضافة إلى توفير مدخل ومخرج من شارع الشيخ خليفة بن سلمان إلى شارع 18 (جهة الشمال) للوصول إلى ضاحية السيف وسيتي سنتر والعقارات والمشاريع الاخرى والتي يتم تعميرها بصورة مطردة، حيث يوجد حالياً مخرجان من المنطقة، الأول عند الاشارة الضوئية اسفل جسر السيف العلوي ويسمح للمرور الخارج بالإنعطاف في جميع الاتجاهات والثاني للدخول والخروج من جهة واحدة فقط )ةخ / د( عند تقاطع شارع الشيخ خليفة بن سلمان وشارع الملك عبدالله الثاني ابن الحسين. وأضاف الوكيل المساعد للطرق أن مشروع إنشاء طريق 2819 وكذلك الجسر العلوي وتطوير شارع الشيخ خليفة بن سلمان والذي تم طرحه مؤخراً سيؤدي إلى توفير مداخل ومخارج جديدة لضاحية السيف وبالتالي إعادة توزيع الحركة المرورية الداخلة والخارجة من المنطقة كما سيؤدي إلى تسهيل الوصول إليها بشكل كبير وبسرعة علماً بأن هذه المشاريع ستواكب احتياجات المنطقة من الناحية المرورية ولضمان نجاح المشاريع الاستثمارية السكنية منها والتجارية. وأشار خلف إلى أن المشروع يشمل كذلك أعمال التسوية الترابية فئة ب و أ، ووضع قنوات أرضية للاستخدام الحالي والمستقبلي للخدمات، وإنشاء أرصفة للمشاة، وتركيب إشارات ضوئية عند التقاطعات، ويشتمل كذلك على إنشاء شبكة تصريف مياه الأمطار الرئيسية والصرف الصحي، وأعمال الرصف النهائية بالإسفلت ووضع الإشارات الإرشادية والدهانات الأرضية وأعمال الإنارة وحماية الخدمات. تجدر الإشارة إلى أن وزارة الأشغال والإسكان قد أوشكت على الانتهاء من إنشاء طريق 2819 كطريق مزدوج وفي ثلاثة مسارات في كل اتجاه. ويقع هذا الطريق إلى الشمال من مشروع سيتي سنتر الذي يتم تنفيذه حاليا. ويربط هذا الطريق دوار السوق المركزي بإشارة الضوئية عند تقاطع سيتي بنك.
 

·
Registered User
Joined
·
2,424 Posts
Its a new flyover, or overpass which will cost 1.5 million dinars.... Doesn't that sound like a ridiculous price tag =S

One little 2 lane 1 way overpass can cost 4 million dollars!??

It says new lanes will have to be created along the sheikh khalifa highway, heading towards Manama... And the flyover will connect there... Creating a new flow of traffic directly from the seef and city centre area towards Manama... Easing traffic flow... And also as a counter-measure to the anticipated increase in traffic when the City Centre opens... It'll take 14 months...
 