SkyscraperCity Forum banner
1 - 12 of 12 Posts

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #1 · (Edited)
Datansha is adjacent to Liwan Old Town in the east, Bai'etan business district in the south, and Nanhai District, Foshan City in the west, with a total area of 3.55 square kilometers. In October 2012, the Guangzhou Municipal Government approved the plan for the renovation and reconstruction of the Datansha Island area, which was included in the reconstruction scope with a planned total land of 239.31 hectares, net land use of 114.23 hectares, and a planned total construction area of 471.31 hectares. The Datansha Island Renewal Project is a key project of the Guangdong-Singapore Cooperation Council, which is jointly developed by the Liwan District People's Government and the CapitaLand Group of Singapore.

In addition, Datansha Island is also the Datansha health care group in Bai'etan Business District, and it also belongs to the "1+4" Guangfo cooperation "Wuyanqiao-Jiaokou High-quality Development Integration Pilot Zone Platform". Based on the important strategic location of Datansha Island, it is necessary to carry out planning optimization based on new development requirements. On the basis of the existing planning, moderately increase the scale of industrial offices, comprehensively improve the functional positioning of the entire island, and build a sustainable city that is livable, suitable for business, and sustainable. environment, and build Datansha Island into an "International Healthy Ecological Island".

The existing buildings on the island are mainly residences, schools, etc., which are not included in the scope of optimization and adjustment. The rest are mainly old villages, old factories, old cities and other buildings, which will be optimized and upgraded. The scope of this optimization and adjustment is 2.3 square kilometers. The total construction volume of the island increased by 200,000 square meters, all of which were commercial and commercial construction volumes.


Datansha Island 2021



Datansha Island urban plan map








The tallest buildings on the Island: 300m + 200m
 

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #2 ·

The positioning of Datansha Island in this plan is: a healthy ecological island—transformation and development, an innovative island of health service value; urban renewal, an international standard garden ecological island; people-oriented, a livable and slow-moving island with a hub network.

Focusing on the needs of Datansha space environment quality, industrial layout, comprehensive transportation, public services, etc., optimize and adjust the whole island to form a planning structure of "one center, one axis, one ring, and two cores". One center: take Tanwei Metro Station as the core, build a new landmark in western Guangzhou, and build a TOD interchange hub; one axis: a super vitality axis running through the north-south direction; one ring: a round-the-island health and leisure belt to revive riverbank culture; two cores: relying on the subway The health industry comprehensive base of the site, as well as the cultural and entertainment district in the south of the island.

The core area is combined with Tanwei Metro Station to improve the development intensity of TOD plots, build a new landmark in the west, and create a rhythmic city skyline. The building height is increased from the original plan of 150 meters to 300 meters. At the same time, taking into account the formation of a landscape interface with low front and high back on the first line of Binjiang, the building height of some riverside plots has been optimized, from the current control limit of 100 meters to within 60~100 meters of the first line of Binjiang, and the second line is controlled within 140 meters.

Create a 3-kilometer long super vitality axis

Since it is Jiangxin Island, Datansha's external traffic has attracted much attention. This plan proposes to implement the originally planned river crossing channel of Sanxiang Road in Foshan leading to the west side of Datansha Island. At the same time, two new river crossing channels will be added in the south of Datansha Island, leading to Yuexiu District and Liwan Fangcun Area respectively. .

In addition, an innovative urban space, the Super Vitality Axis, will be built on the island, with a length of 3080 meters. It will be erected on the sidewalks and motor vehicle lanes, connecting the commercial podiums on both sides and connecting the core industrial spaces of the island. Along the core industrial area of the whole island, combined with the function of the podium, a canopy corridor system with a total length of about 5 kilometers, a width of 3 to 5 meters, and a height of 6 meters to 10 meters is built. The public space is allowed to exceed the building setback, regardless of density and capacity.

In terms of public service facilities, optimize the integration of primary and secondary education resources, optimize and adjust the current nine-year system school (45 classes) to a 60-class school (30 primary schools + 30 junior high schools); add a new 30-class primary school , optimize the location of 1 existing primary school with 36 classes; the existing 20-class kindergarten under the current regulation has increased to 36 classes, and an additional 16-class international kindergarten has been added.


render of Datansha Urban Planing







 
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #3 ·
In August 2021, CapitaLand Group invested and completed the demonstration section of the central axis river landscape. The reconstruction area starts from the Pearl River Bridge in the south and reaches the breathing center in the north, covering an area of 72,000 square meters, of which the demonstration section is about 900 meters long.

 

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #4 ·
In September 2021, the Datansha Campus of Shamian Primary School, funded by CapitaLand with the goal of becoming a benchmark campus of the "School of the Future", officially opened.

The total construction area of the school is about 17,000 square meters. It adopts the scale of 36 classes rooms and consists of teaching buildings, comprehensive buildings, outdoor standard sports fields and other buildings. The completion of the new campus provides a more complete set of educational facilities for Datansha Island.

 
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #5 · (Edited)
In September 2021, the clinical base of the National Respiratory Medicine Center of the First Hospital of Guangzhou Medical University was officially completed. As the first tertiary hospital on the island, it can provide 1,200 beds, which not only greatly improves and enriches the medical resources on the island, but also provides the island. People's daily medical treatment provides a smart and efficient environment.



 
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #6 ·
The first phase of the Guangfo Bridge has started construction at the end of 2020

Guangfo Bridge render

 
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #7 ·
Datansha Island 2021
 
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #8 ·
Photos by 求实 from gaoloumi 2022-2

Datansha Island urban development progress






The Chinese in yellow marking the location of 300m + 200m buildings developed by Capitaland





 

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #9 ·
Photos by 求实 from gaoloumi 2022-2











 

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #11 ·
  • Like
Reactions: nenad_kgdc

·
Registered
Joined
·
4,908 Posts
Discussion Starter · #12 ·
1 - 12 of 12 Posts
Top