If everything goes according to the plan, the GZ metro can reach 300km by the end of 2016.
2015 Guangzhou Metro ridership 2400 millions.

According to the construction plan, till the end of 2018, Guangzhou Metro length will reach 489.4km, ranking 3rd in the world.
  • Like
Reactions: 1
http://gz.house.163.com/16/1009/17/C2V1QQTB008782AS.html

According to the report (up to 2016/9):

Line 6 phase II, construction schedule: 90%

Line 7 phase I , construction schedule: 88%

Line 4 south extension, construction schedule: 84%

Line 9 phase I, construction schedule: 77%

Line 13 phase I, construction schedule: 75%
See less See more
  • Like
Reactions: 5
AT THE END OF 2016, GUANGZHOU METRO MAP WILL BE LIKE THIS( EXCEPT FOR THE LINE 9):

See less See more
  • Like
Reactions: 2
I LIKE TO SEE THIS GUANGZHOU METRO MAP (2018-2020):

See less See more
  • Like
Reactions: 3
  • Like
Reactions: 4
4
  • Like
Reactions: 5
http://news.sys-con.com/node/3946949

Bentley Systems Announces Winners of 2016 Be Inspired Awards

Advancing Comprehensive BIM Playbooks
• Guangzhou Metro Design & Research Institute Co., Ltd. – ChishaJiao Station and Shiliugang - ChishaJiao Section of Guangzhou Metro Line 11 – (Guangzhou, Guangdong, China)
See less See more
  • Like
Reactions: 1
GUANGZHOU SOUTH RAILWAI STATION


The total construction area of the station is 370,000 square metres. The whole building including the main station house is under a single canopy with no pillar support. It was built with a total investment of 13 billion yuan. The total station construction amounted to use of 79,000 tons of steel, about 1.7 times the amount of steel required for the Beijing National Stadium (Bird's Nest Stadium), as well as the use of 1.5 million cubic meters of concrete.

28 tracks serve 15 platforms, including 13 island platforms and two side platform. Station building area is of approximately 168,000 square meters ( calculated only waiting room, ticket hall and other railway passenger facilities ). Station waiting room using online elevated structures, including two station house and stuff Elevated house, and set before overhead and drop-off station platforms. The total height of the whole building stations rises to more than 50 meters, with a large central arch structure across a 64-metre span. In addition, the station roof has an installed area of about 2,000 square metres of solar panels, directing power to the station.

The main structure consists of 4 layers, including three above ground and a basement level. The underground basement level contains the Guangzhou Metro and future Foshan Metro station hall, as well as to provide 1,808 parking spaces. The ground floor is mostly the arrivals hall and also the Hong Kong cross border port of entry and Guangzhou Baiyun International Airport transfer hall. The second floor has a hall and a VIP waiting rooms, as well as the platform layer; arranged in order from east to west, these are used by southbound Beijing-Guangzhou services, Guangzhou-Shenzhen-Hong Kong trains, northbound Beijing-Guangzhou services, Guangzhou-Zhuhai intercity trains, Guangzhou-Maoming intercity trains, Guangzhou-Xian trains, Guangzhou-Nanning, and Guangzhou-Guizhou trains. Level three features an elevated passenger waiting room, of 71,722 square meters, plus an area 14,694 square meters of commercial space. The station also has space reserved for future high speed and local rail developments, such as the Guangzhou Zhaoming Intercity Railway.











See less See more
5
  • Like
Reactions: 5
GUANGZHOU METRO LINE 7 STATION PHOTO ( OPENING AT THE END OF 2016)

See less See more
how long will the system be at the end of 2016?
302.2KM.
  • Like
Reactions: 1
  • Like
Reactions: 5
Quick View of Guangzhou Metro Data:

http://www.gzmetro.org/article_view.asp?id=36

1.Passenger flow intensity of 23,000 passengers per kilometer, ranking first in the country

2.Metro lines have been opened : 9 lines , 260 km

3.Subway lines under construction : 11 lines, 260 km, involving a total investment of 140.7 billion yuan, planned for 2016,2017 years to open.

4.Metro line average cost: about 450 million yuan per kilometer

5. 2015 to 2025 metro line planning: 15 lines , 339 km
See less See more
  • Like
Reactions: 3
All up how long will the system eventually be?
ANY PLAN CAN BE CHANGED ACCORDING TO THE DEMAND.

BY THE END OF 2018, GUANGZHOU METRO : 520KM (AT LEAST)
GUANGZHOU METRO LINE 6 PHASE II, LINE 7 PHASE I, LINE GUANG-FO PHASE II ARE OFFICALLY OPENED TODAY.

http://epaper.xxsb.com/showNews/2016-12-28/354680.html
  • Like
Reactions: 4
  • Like
Reactions: 3
  • Like
Reactions: 5
GUANGZHOU METRO REACHES 308.7KM.
http://weibo.com/gzmtr?is_hot=1#_rnd1482991964769

LATEST GZ METRO MAP:


See less See more
2
  • Like
Reactions: 3
2017 GUANGZHOU METRO WILL OPEN THE FOLLOWING LINES:

1.LINE 4 SOUTH EXTENSION :12.6KM

2.LINE 9 PHASE I :20.1KM

3.LINE 13 PHASE I : 27.03KM

4.LINE KNOWLEDGE CITY : 22KM

http://gzdaily.dayoo.com/html/2016-12/29/content_4_1.htm
See less See more
  • Like
Reactions: 3
INTERCITY LIGHT RAIL MAP IN PEARL RIVER DELTA

BY 2020: 1430 KM

http://jt.gz.bendibao.com/news/2015316/182932.shtml