SkyscraperCity Forum banner

GUANGZHOU | Public Transport

573160 Views 1960 Replies 231 Participants Last post by  lawdefender
Guangzhou trolleybus





See less See more
3
1901 - 1920 of 1961 Posts
Photo from GZ METRO weibo

See less See more
  • Like
Reactions: 5
International Financial City Metro Station

Render



photo by 探长 from gaoloumi 2022-8
See less See more
2
  • Like
  • Love
Reactions: 5
The 14th Five-Year Development Plan(2020-2025) for the Full Scale Urban Integration of Guangzhou and Foshan, released by Guangzhou Municipality and Foshan Municipality


The "Planning" proposes to jointly draw a coordinated and balanced urbanization spatial pattern, jointly build an interconnected infrastructure network, jointly promote innovation-driven development of resource sharing, jointly build a synergistic and complementary modern industrial system, and jointly shape a green, low-carbon and beautiful ecological environment. , share the six key tasks of high-quality, balanced and inclusive public services, give full play to comparative advantages, break down barriers to improve resource matching efficiency, and enhance value creation capabilities.


Land Area:
Guangzhou: 7434 km2
Foshan: 3797 km2
Total : 11231 km2

Registered Population 2021:
Guangzhou: 18.81 million
Foshan: 9.61 million
Total: 28.42 million

GDP (nominal ) 2021:
Guangzhou: RMB 2823.1 billion yuan ( USD 437.68 billion)
Foshan: RMB 1215.65 billion yuan ( USD 188.47 billion)
Total : RMB 4038.75 billion yuan (USD 626.16 billion)







See less See more
2
  • Like
  • Love
Reactions: 5
^^^^^^^^^
@KillerZavatar, guangzhou is a more spread out city compared to shenzhen because it is not so mountanious :love:
Xichun and Caihongqiao metro stations of Line 8 extension will be opened at the end of 2022


Caihongqiao (Rainbow Bridge ) Station adopts a special "high station hall" plan. The height of the station hall reaches 10.4 meters, which is more than twice that of a general subway station, forming a large-scale space.

Rainbow Bridge Station is a transfer station for Line 8, Line 11, Line 13 and Line 22 of the Guangzhou Metro. It is located underground at the intersection of Dongfeng West Road, Liwan Road, at the junction of Liwan District and Yuexiu District, Guangzhou, and to the southwest of Liuhua Lake Park. The station is named after the Rainbow Bridge.


The ceiling of the station closely follows the theme of "rainbow", which is reflected by the curved grille and light strips. At the same time, the brightness and hue of the light can be adjusted to form a rainbow effect. The design takes "city wall" as the main design idea of the wall, and introduces the elements of the city wall in the south of the Han Dynasty into the wall design of the Rainbow Bridge Station, selects the beige travertine material with a sense of history and art, and adds lighting. The system simulates different texture effects to restore the vicissitudes of history of Rainbow Bridge as the fortress of Xiguan in southern Guangdong, and optimizes the columns to be V-shaped columns with a column spacing of 18 meters, which makes the field of vision wider and enriches the level of the station space. The ground of the station is made of natural stone with a water ripple mechanism, which echoes the theme of the rainbow.

The construction area of Rainbow Bridge Station is about 86,000 square meters, which is equivalent to four ordinary stations and is a super-large station.
















See less See more
7
  • Like
  • Love
Reactions: 5
The latest starting and ending point of Foshan-Guangzhou-Dongguan Intercity Railway has been announced, and it is planned to start from Luzhou, Foshan in the west and Songshan Lake in Dongguan in the east. On August 31, the Intercity railway started bidding for a number of projects such as design, survey, etc. The line is temporarily 113 kilometers long and has 31 stations for bidding, and the final approval from the government shall prevail.

The total length of Foshan-Guangzhou -Dongguan Intercity Railway is 107 kilometers. The bidding announcement posted on August 31 shows that the length of the line is planned to increase to 113 kilometers, starting from Luzhou in Foshan and ending at Songshan Lake in Dongguan, all of which are underground lines, of which the Foshan section is 25.7 kilometers, the Guangzhou section is 50.6 kilometers, and the Dongguan section is 36.7 kilometers.

See less See more
  • Like
Reactions: 5
Xintang Station (U/C)

The scale of the station is 7 platforms and 17 lines, and the scale of the new station is 50,000 square meters.


The total project scale of the supporting stations of the hub is 95,000 square meters, covering an area of 7.02 hectares. It mainly includes four construction contents: the traffic square on the west side, the ground landscape greening of the north square, the underground space of the north square, and the comprehensive management center of the hub.


The comprehensive transportation hub of Xintang Station needs to reserve 5 subway lines, of which Line 13 has been completed and put into operation, and the reserved platform of Line 16 has been completed and has not been put into operation; the remaining 3 lines are planned.



Render











photos by Mister超 from gaoloumi 2022-8












Photos by 风中的仙人掌 from gaoloumi 2022-8












See less See more
13
  • Like
  • Love
Reactions: 4
On September 20, the website of the Municipal Bureau of Planning and Natural Resources announced the "Conceptual Plan of Guangzhou East to Huadu Tiangui Intercity, Fangcun to Baiyun Airport Intercity Station Complex", which was reviewed and approved by the Guangzhou Municipal Planning Commission After approval by the Guangzhou Municipal Government, it will take effect from August 29, 2022.

The "Plan" agrees in principle the site selection and conceptual plan of the 10 station complexes, which are:

Jingxi Road Station, Baiyun Dongping Station, Ma'anshan Park Station, Airport Depot, Fangshi Station, Renhe Station, Baiyun City Center Station, Xia Mao Station, Baiyun Station, Guangzhou Railway Station.


The total land area of the 10 station complexes is 105.54 hectares. The nature of the land is that roads and transportation facilities are compatible with commercial, commercial facilities, second-class residential, and primary and secondary schools. The total construction area is 2,719,300 square meters (commercial and business facilities). 1,245,300 square meters, 177,100 square meters of industrial supporting facilities, 1,168,500 square meters of residences, 128,400 square meters of residential supporting facilities), 342,100 square meters of transportation connection facilities, rail transit facilities, transportation connection facilities, etc. are not included in the complex. capacity building area. The "Plan" specifically reminds that the land scope of the station complex shall be subject to the final land acquisition.



10 Stations location map




Guangzhou East to Huadu Tiangui Intercity (Guanghua Intercity) extends north from Guangzhou East Station to Huacheng Street Station. The line is about 39.6 kilometers long. There are 7 new stations, and it connects to Guangzhou Metro Line 18 to the south and enters the center of Guangzhou. The urban area connects Baiyun City Center, Airport Economic Zone, Air-Railway Joint Development Demonstration Zone, and Huadu Central District to the north, and cross-line operation with Fangbai Intercity, connecting Baiyun Airport.

Fangcun to Baiyun Airport Intercity (Fangbai Intercity) starts from Fangcun Station and ends at Airport North Station. The line is about 41.1 kilometers long, with 10 new stations. It connects to Guangzhou Metro Line 22 to the south and enters Bai'e Lake. The north is connected to Guangzhou Railway Station Area, Baiyun Hub Area, Baiyun City Center, Airport Economic Zone, Baiyun Airport, etc., and cross-line operation with Guanghua Intercity


Guangzhou East - Huadu Intercity rRailway and Fangcub-Baiyun Airport Intercity Railway map


See less See more
2
  • Like
  • Love
Reactions: 4
Guangzhou Urban Underground Space Planning 480 Urban Rail Underground Stations

The Guangzhou Urban Underground Space Plan (hereinafter referred to as the "Plan") was officially issued. The plan takes the rail transit network as the skeleton and the multi-line transfer (hub) stations as the nodes to form a spatial structure of "one core, one network and six areas". . Among them, 48 urban rail underground lines and 480 urban rail underground stations are planned; 19 mountain tunnels and 25 underwater tunnels are planned; 15 underground sewage treatment facilities, 22 underground large and medium-sized domestic waste transfer stations and sanitation parking are planned field etc.


Red dot : Core nodes
Blue dot: Major nodes







See less See more
  • Like
  • Love
Reactions: 4
From 6:00 on September 28, Caihongqiao Station of Line 8 officially opened for operation

The Station is a transfer station for Line 8 and Line 11 and Line 13 under construction. The total construction area of the station is about 86,000 square meters, which is equivalent to the volume of four standard stations. At the time of opening, there will be 3 entrances and exits A, C and D which will be put into use synchronously.



























The rainbow color is the iconic color of this station









See less See more
11
  • Like
  • Love
Reactions: 5
It's Caihongqiao. And it's planned to become a 4 line interchange station, with line 22 as well (however, the nature of that line is disputed, it has a metro line number but got approved in the commuter rail plan). This time I don't miss this infill station opening, unlike others.
  • Like
Reactions: 2
I’m expecting Xicun on Line 8 (for interchange with Line 5) to open before the end of this year as well, probably in December.
  • Like
Reactions: 2
China's first subway station confidentiality law popularization demonstration base , in Longtan Station of L18







See less See more
3
  • Like
Reactions: 3
Guangzhou's largest TBM "Avenue Pioneer" officially unveiled

On September 28, the largest diameter tunnel boring machine in Guangzhou, "Avenue Pioneer", jointly built by Guangzhou Communications Investment Group and China Railway 14th Bureau, was successfully rolled off the assembly line. The "Dao Pioneer" is over 15 meters in diameter, 140 meters long, and has a total weight of about 4,000 tons. It is currently the largest diameter TBM in Guangzhou.


The Haizhuwan Tunnel Project, invested and constructed by Guangzhou Communications Investment Group and undertaken by the China Railway 14th Bureau, spans Haizhu District and Panyu District vertically. The total length is 4.35 kilometers. Among them, the shield section is 2,077 meters long and the excavation diameter is 15.07 meters. It is the first super-diameter shield tunnel under construction in Guangzhou.





See less See more
  • Love
  • Like
Reactions: 3
On October 9, the construction of the Shenzhen-Jiangmen Railway, which was designed by the Fourth Railway Institute affiliated to China Railway Construction, and participated by the China Railway Construction Bridge Bureau, China Railway 11th Bureau, China Railway 12th Bureau, China Railway 14th Bureau, and China Railway 25th Bureau, started construction. With the "Greater Bay Area on Track", it will speed up again.

The Railway is an important part of the coastal channel, one of the national "eight vertical and eight horizontal" high-speed railway main channels. The line starts from Xili Station, the hub of Shenzhen, and ends at Jiangmen Station, with a total length of about 116 kilometers. It spans the Pearl River Estuary and connects 5 central cities in the Greater Bay Area, including Shenzhen, Dongguan, Guangzhou, Zhongshan and Jiangmen. Cross-Pearl River Express Passenger Corridor.

The design speed of the Shenzhen Xili-Nansha section of the Shenjiang Railway is 200 kilometers per hour, and the design speed of the Nansha-Jiangmen section is 250 kilometers per hour. Bridges and tunnels account for 98% of the whole line. The line passes through the Pearl River Delta region with developed water system and passes through multiple grade waterways, and the conditions are complicated. To this end, a number of innovative technologies were applied in the design of the project. After leaving Nansha Station, five cable-stayed bridges with a main span of more than 200 meters were used to span the Hongqili Waterway, Jiya Waterway, Xiaolan Waterway, Modaomen Waterway and Hutiaomen Waterway. Among them, the Hongqili Bridge with a main span of 808 meters is the world's first steel-concrete box-truss composite girder road-railway cable-stayed bridge, leading the development of long-span road-railway cable-stayed bridge technology.

The Shenzhen-Hong Kong Railway is a key project to improve the external high-speed rail corridors and cross-Pearl River high-speed rail corridors in Shenzhen-Hong Kong, Pearl West and other places. After the opening to traffic, it is expected that Shenzhen and Jiangmen can be connected within one hour, and Shenzhen and Guangzhou Nansha Free Trade Zone can be connected by high-speed rail within half an hour.







See less See more
2
  • Like
Reactions: 5
Self help customer service center in Guangzhou Metro Station





Guangzhou Metro promotes intelligent customer service center to achieve full coverage of hub stations


The intelligent customer service center is like a large-scale robot. When passengers need to inquire and deal with the ride, they can solve it through self-service operation, without having to hand it over to the staff to handle it manually. In terms of ticket processing, the intelligent customer service center supports passengers to self-process various ticket transactions such as one-way tickets, daily tickets, Yangcheng Pass, QR codes, financial IC cards; in terms of payment methods, in addition to cash payment, it also supports Alipay, WeChat E-payment.

The intelligent customer service center also supports passengers to interact with the intelligent robot "Yoyo" through voice inquiries, screen clicks, etc., and self-check travel information such as routes, transfers, fares, station layouts, etc., even if the staff is not around. Quickly grasp travel information. If you encounter a situation that the system cannot query, you can also contact the human customer service for help by clicking the manual help button at the top of the screen.



See less See more
2
  • Like
Reactions: 3
In 2018, Yuexiu Property teamed up with Guangzhou Metro to build the first community-based TOD residential project in Guangzhou, Xingtu TOD. In 2019, Yuexiu Property introduced Guangzhou Metro as a strategic shareholder, and worked together to develop the "rail transit + property" development model, from the development of the previous pan-TOD project to the development of the superstructure project of the deep ploughing depot.

After five years of development, in-depth research and exploration of TOD, Yuexiu Property has become one of the largest developers of rail transit property development in China.

Up to now, it has successively developed Star Map TOD, Xingyue TOD, Xinghan TOD, Xinghuicheng TOD, Xingyue Mountainside TOD, Yuexiu Riverside·Xinghang TOD, Pazhou South TOD, and Yuexiu·Xingyao TOD in Guangzhou.


Yuexiu Property major shareholder is Guangzhou Municipality.



Yuexiu Property TOD Projects location map based on metro stations

See less See more
  • Like
  • Love
Reactions: 3
On October 31, 2022, the "Environmental Impact Report (Draft for Comment) of the (Line 24) of the North Extension of Guangzhou Urban Rail Transit Line 8" is being publicized.

According to the environmental impact report, Guangzhou Metro Line 24 is about 31.7 kilometers long.

Guangzhou Metro Line 24 is an all-underground line with 18 stations

namely Memorial Hall Station, Ziyuangang Station, Yuanjing Station, Tangjing Station, Baiyun Station, Huangshi Station, and Xia Mao Station. , Baiyun Dalang Station, Junhe Station, Taoyuan Station, Jiangfu Station, Shuili Station, Shenshan East Station, Dongjing Station, Yayuan Station, Yayao Station, Xiuquan Park Station, Guangzhou North Station, among which the transfer stations are 11.

Guangzhou Metro Line 24 is equipped with one Tangge parking lot and one Yayao depot. The entire line uses 6 group A-type cars with a maximum design speed of 100 kilometers per hour. The all-day driving plan is from 6:00 to 24:00, with a total of 18 hours of operation.


Line 24 map


See less See more
  • Like
Reactions: 4
1901 - 1920 of 1961 Posts
Top