SkyscraperCity banner

8721 - 8740 of 9245 Posts

·
Registered
Joined
·
6,988 Posts
The Vásárhelyi Boldizsár plan on his original old map:
I think that's a map like it was back then. Just motorway "into" Satu Mare and not a ringroad. Compare it to Munich*. The wikimedia map is....... well, likely just an interpretation of how the old map would look like from today's point of view. Which is honestly crap....

*I'd compare Budapest to Berlin, both with a ringroad since they were larger.
 

·
Registered
Joined
·
698 Posts
Not crap, but in those old maps you cannot see where they going exactly.
An administrativ map is well good for it, a blind map is enough to prove, but useless.
 

·
Registered
Joined
·
5,607 Posts
That would definitely be M85 though...seems to me.
 

·
Hun Solo
Joined
·
7,347 Posts

·
Registered
Joined
·
726 Posts
  • Like
Reactions: Verso

·
Regisztrált felhasználó
Joined
·
2,095 Posts
Credits for Peter_601

https://magyarepitok.hu/utepites/2019/09/ket-evtizedes-utfejlesztes-vart-teljesse-nograd-megyeben
"Az utolsó két szakasszal befejeződött a NIF Zrt. által lebonyolított, Salgótarjánt és Hatvant összekötő 21-es út fejlesztése.
...
A munkálatok augusztus végén befejeződtek és a forgalomba helyezésre hamarosan sor kerül.
...
A Bátonyterenye város térségét érintő Nógrád V. szakaszon a kopóréteg július első hetében elkészült. A teljes szakaszon a körforgalmakban már a végleges körforgalmi forgalomtechnika alapján közlekedhetnek az autósok.
...
A több ütemben zajló fejlesztésben összesen 53 kilométernyi út újult meg.
...
A 21-es számú főút első szakaszainak négynyomúsítása 2002-ben kezdődtek az előzési szakaszok megépítésével. Az új szakaszok végleges forgalomba helyezésével egy régi elképzelés valósul meg azzal, hogy Nógrád megye székhelye, Salgótarján 2x2 sávos úton kerül bekötésre a magyarországi autópályahálózatba. "

A képek alapján még van itt-ott gereblyéznivaló, de használat szempontjából a főpálya lényegében elkészült és megvolt a szalagvágás.








 

·
Hun Solo
Joined
·
7,347 Posts
None of them. It stayed a toll-free main road, as it was before. Note, that it has at least 5-6 roundabouts on it.

Road 67 follows the same concept.
 

·
Registered
Joined
·
6,988 Posts
None of them. It stayed a toll-free main road, as it was before. Note, that it has at least 5-6 roundabouts on it.

Road 67 follows the same concept.
Same concept? It will not be a M road but the new 33km road will be grade-separted WITHOUT roundabouts, won't it?

What does it mean "unter Fremder verwaltung" ? :lol:
The 1966 map indicates that some former German regions are "currently under foreign control" (z.Z. = zur Zeit = currently). The Potsdam Agreement from August 1945 declared these regions being "under foreign control" (of Poland and Russia) to distinguish them from the "Russian Occupation" (GDR = DDR). The official notion changed with the Treaty of Warsaw (1970) and finally with the German-Polish Border Treaty from 1990. Source: wikipedia.
 

·
Hun Solo
Joined
·
7,347 Posts
Same concept? It will not be a M road but the new 33km road will be grade-separted WITHOUT roundabouts, won't it?
No. Sorry, that damn R-prefix confused us all. So unlike M76 (which was also called R76 for a long time) Road 67 will remain a main road, and will be executed with roundabouts here:

http://www.openstreetmap.hu/?zoom=16&lat=46.55353&lon=17.81602&layer=M

here:

http://www.openstreetmap.hu/?zoom=16&lat=46.42435&lon=17.7796&layer=M

and here:

http://www.openstreetmap.hu/?zoom=16&lat=46.70175&lon=17.76823&layer=M
 
8721 - 8740 of 9245 Posts
Top