Les Infrastructures en Projet :
Infrastructures de transport urbain
CASABLANCA | RER line 1 | 63Km | #Project
CASABLANCA | Metro Line 1 | 21 Km | #Project (2017)
Infrastructures de transport Ferroviaire
KÉNITRA - CASABLANCA | High-Speed Rail (LGV) | 130 km | 320 km/h | #Project
Infrastructures Autoroutières
Infrastructures Portuaires
TANGIER | Reconversion of the Old Port (Cruise port, Fishing port, Marina) | 735 millions $ | 2011-2016 |#Accepted
Infrastructures Aéroportuaires
MARRAKECH | Menara Airport Terminal III | 26 000 m² | 900 MDH | 2013 | #Project
FEZ | Fès-Saïss Airport Terminal II | 26 000 m² | 620 MDH | #Project
http://www.skyscrapercity.com/showthread.php?t=942550
Infrastructures de transport urbain
CASABLANCA | RER line 1 | 63Km | #Project
CASABLANCA | Metro Line 1 | 21 Km | #Project (2017)
Infrastructures de transport Ferroviaire
KÉNITRA - CASABLANCA | High-Speed Rail (LGV) | 130 km | 320 km/h | #Project
Infrastructures Autoroutières
Infrastructures Portuaires
TANGIER | Reconversion of the Old Port (Cruise port, Fishing port, Marina) | 735 millions $ | 2011-2016 |#Accepted
Infrastructures Aéroportuaires
MARRAKECH | Menara Airport Terminal III | 26 000 m² | 900 MDH | 2013 | #Project
FEZ | Fès-Saïss Airport Terminal II | 26 000 m² | 620 MDH | #Project
http://www.skyscrapercity.com/showthread.php?t=942550