^^ Excellent! You're design so far the most up-to-date since the official map from TransJakarta hasn't got line 2 Extension even included on the map yet.... But you've missed the 8A and the currently under construction line 13 and the proposed 14 and 15 :cheers: Keep up the good work :eek:kay:

====

Meanwhile, new buses for TransJabodetabek bus service now operating on 3 new services

Poris Plawad (Tangerang) - Kemayoran
Depok - Grogol
Harapan Indah (Bekasi) - Pasar Baru


Armada baru PPD

PPD TransJabodetabek (Poris Plawad - Kemayoran)

PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr

Kampanye Ayo Naik Bus yang lagi digencarkan
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr


Interior
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr
2

PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr

PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr

Pramudi yang sebelumnya bertugas di Ciputat - Kota
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr

Bagian belakang bus

PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr

Dan ini yang saya tunggu2.... (Walaupun belum terpasang)...
PPD TransJabodetabek City Bus by Adriansyah Yasin, on Flickr
 

·
050
Joined
·
606 Posts
^^ Excellent! You're design so far the most up-to-date since the official map from TransJakarta hasn't got line 2 Extension even included on the map yet.... But you've missed the 8A and the currently under construction line 13 and the proposed 14 and 15 :cheers: Keep up the good work :eek:kay:
Thank you! I indeed have only included the current corridors (1-12). Maybe I will try to add 13-15 later. Do you know where I can find the exact planned routes of those new lines?

I didn't plan to add the 'rute lintas koridor' (2A, 2B, 3A, 5A, 6A, 6B, 7A, 7B, 8A and 9A) as they are just using the existing 12 lines.
 

·
Tukang Bikin Peta
Joined
·
5,598 Posts
Thank you! I indeed have only included the current corridors (1-12). Maybe I will try to add 13-15 later. Do you know where I can find the exact planned routes of those new lines?

I didn't plan to add the 'rute lintas koridor' (2A, 2B, 3A, 5A, 6A, 6B, 7A, 7B, 8A and 9A) as they are just using the existing 12 lines.
So far only line 13 had exact information on the route configuration as they now under construction, you can use this picture below that I've made by gathering informations from the media :cheers:

TransJakarta BRT Line 13 scheme by Adriansyah Yasin, on Flickr

And also, line 8A is not a "rute lintas koridor". It serves as a branch line for line 8 that pass through Tomang rather than parallel with line 3 all the way to Harmoni Central



======

PPD TransJabodetabek
 

·
050
Joined
·
606 Posts
Updated 'tube map' of Transjakarta

Thank you Losbp for the comments! I have updated the map. It now includes lines 13 and 8A (following the London Tube Map system, it is included in line 8, just like all branches of the Northern Line in London are integrated into one line/colour). I had to move a couple of other lines in order to fit the new lines in. Another change I made is the north-western end of line 12, as I read that it no longer goes to Pluit, but directly from Penjaringan to Landmark.
 

·
Registered
Joined
·
2,011 Posts
nice and neat...!

but it should be using the KCJ Commuter's logo on the stations than the KAI logo IMO...
 

·
050
Joined
·
606 Posts
^^

Thank you! I tried to add KA Commuter logo at first, indeed. However, I didn't because the logo is very unclear when displayed very small. Secondly, some of the stations would then still need the Commuter and the KAI logo, as there are also non-commuter long-distance lines (e.g. Kota), or only the KAI logo as there is no Commuter line (Gambir). In any case, KA Commuter is part of the KAI company, and using the KAI logo is well in line with the use of the National Rail logo on the London Tube map.

I think by the way that I still missed a couple of railway transit points, including Kampung Bandan station and the Pademangan stop, and Pondok Jati station at the Slamet Riyadi stop.

Maybe later I can also make an integrated map with the MRT plan. Are there already more detailed plans for the MRT East-West line, or for the LRT (detailed including where the stations will be)? Or for any other new developments (in addition to Transjakarta lines 14/15 also for example the new railway line to the airport)?
 

·
Tukang Bikin Peta
Joined
·
5,598 Posts
^^ The only exact problem with public transport planning in Jakarta is there's no exactly integrated masterplan of all existing projects/planning. There's urban railway masterplan already published since early 2010s but since new projects such as LRT came up there's no such thing as a published map ever existed as far as I create the urban railway map, so I do really look forward to see your creation of the BRT+Urban railway map :cheers:

Btw, this is the planned masterplan of Urban Railway in Jabodetabek area from the government


So far the only planned LRT lines with stations are these:



The LRT network masterplan


MRT planned lines so far


Another system map made by user gazart

mencoba merapikan peta om Losbp :)

Update Peta Sistem Rel Urban Jabodetabek (2020).
Yang kemungkinan dekat akan dibangun hingga tahun 2020.

 

·
Tukang Bikin Peta
Joined
·
5,598 Posts

·
Registered
Joined
·
3,654 Posts
LRT Cibubur-Dukuh Atas Groundbreaking September 9, this Preparation


gambar ilustrasi

Jakarta -PT Adhi Karya Tbk (ADHI) ensure groundbreaking or significant pillar of Prime project Light Rail Transit (LRT) will be done September 9. In addition to have pocketed the legal basis in the form of presidential Regulation (Regulation) the assignment, Adhi Karya would also do a variety of preparatory steps.

Together with the Ministry of transportation, Railways Ditjen Adhi Karya devised a standard regulation mode, standard security operation. and service standards for LRT.

"There are teams that also perform Detail Engineering Design (DED) based business Feasibility Study (FS) or technical feasibility study that's been done," said Adhi Karya, Director of Kiswodarmadawan, to the detikFinance, Saturday (5/9/2015).

DED conducted aiming at making an overview of the development of the LRT. After that, the DED attached to Kemenhub to gain approval.

"Base it used drafting budget infrastructure," he said. The plan, the location of the groundbreaking is near the Taman Mini Indonesia Indah (TMII), East Jakarta.

To ensure that the process went smoothly, construction engineer Adhi Karya do some preparation and technical support work. "The other Teams carry out gradually in the field. This acceleration program that we work on, "he explained.

The original plan, laying the first stone LRT project was started on August 17. Phase I of the LRT runs from Cibubur in East Jakarta to Dukuh Atas in Central Jakarta. The value of the project is estimated to reach Rp 7 trillion.

Now, the Regulation has been dropped. Adhi Karya assignee.
*) sumber: http://finance.detik.com/read/2015/09/05/164511/3011011/4/lrt-cibubur-dukuh-atas-groundbreaking-9-september-ini-persiapannya
 

·
Tukang Bikin Peta
Joined
·
5,598 Posts

·
Tukang Bikin Peta
Joined
·
5,598 Posts

·
Tukang Bikin Peta
Joined
·
5,598 Posts

·
Facade Hunter
Joined
·
17 Posts
I think it's too late for LRT another countries have adopted this system a long time ago, but congratulations Jakarta!
 

·
Registered
Joined
·
3,654 Posts

·
Registered
Joined
·
3,654 Posts
January 2016, "Groundbreaking" LRT Jakarta Government

Jakarta, KOMPAS.com-DKI Jakarta Governor Basuki Tjahaja full moon declared ready doing laying the first stone (groundbreaking) construction of a light rail train or light rail transit (LRT).

This is as it has been the publication of two presidential Regulation (Regulation) number 98 by 2015 about acceleration of light rail or Light Rail Transit are integrated in the region of Jakarta, Bogor, Depok, Bekasi and.

"We want to auction first. Pencanangannya maybe in September including the guesthouse for development athletes. Mean January groundbreaking (the construction of the LRT), "said Basuki, at City Hall, Wednesday (9/9/2015).

The provincial government (provincial government) DKI direct, continued he, preparing various needs to encourage the acceleration of the construction of the LRT. As for some of the measures implemented by setting up an auction as well as form technical implementing (UPT) LRT.

Some time ago, Basuki got UPT will form the LRT but Cancel. After a few times of doing meeting with coordinating Minister for the economy as well as of the Court, Basuki got information that the Government must build infrastructure that funds sourced from budgetary income and expenditure area (BUDGETS) Jawa.

He has also been instructed to PT Jakarta Propertindo to build the infrastructure of the LRT. While the train procurement (railing stock) and operation will be auctioned off to private.

"Now we just want to put up detailed engineering design (DED). Well we are pointing to PT Jakpro to build first. Later if the LRT can be UPT money, they will buy it back, "said Basuki.

In addition, Basuki also preparing Rules Governor (Pergub) as the legal basis of PT Jakpro to build the LRT project in Jakarta.

"Pergubnya we're prepare, anyway the Government got up its infrastructure. Later when it's running its construction, LRT UPT can be improved so the agency public service areas, "said Basuki.

LRT project from the provincial Government of DKI planned LRT Corridor includes seven, namely the Kebayoran Lama-Kelapa Gading (21.6 km), Tanah Abang-Pulomas (17.6 km), Joglo-Tanah Abang (11 km), Puri Tanah Abang-Kembangan (9.3 km), Pesing-Kelapa Gading (12.9 km), Pesing-Soekarno-Hatta (18.5 km), and Cempaka Putih-Ancol (10 km).

Total costs that must be incurred to trackage along 70 kilometers and comprises seven corridors ranged from Rp 35 trillion.
*) http://megapolitan.kompas.com/read/2015/09/09/12214111/Januari.2016.Groundbreaking.LRT.DKI

other news :
Ahok Groundbreaking LRT Jakarta January 2016

*) http://finance.detik.com/read/2015/09/09/130204/3014174/4/ahok-groundbreaking-lrt-jakarta-januari-2016

 

·
Tukang Bikin Peta
Joined
·
5,598 Posts

·
050
Joined
·
606 Posts
Map of rail-based public transport in Greater Jakarta 2020

Thanks to Losbp for providing clear information on all concrete plans for rail-based public transport in the Greater Jakarta area, I prepared the following map. While my previous map of the Transjakarta BRT network was based on the London Tube map, I based this map on Berlin's S+U-Bahn map.

The map includes the following lines (with made-up line numbers):
  • The existing KA Commuter railway lines (K1-K6), with some planned extensions, and all stations (even if the KA Commuter trains currently do not stop there).
  • A new KA Commuter railway line connecting the two airports (K7).
  • The MRT line that is currently under construction, with both phases planned to be operational in 2019 or 2020 (M1).
  • The two 'priority' LRT light rail lines planned by the DKI Jakarta government (L1-L2).
  • The three first stages of the LRT network by Adhi Karya, together forming two lines (L3-L4).


Some other remarks: (1) I used as much as possible the official information communicated, although in some cases contradictory information is available. (2) I avoided having two stations with the same name. For example, according to the official information, there will be Mangga Besar and Sawah Besar stations on the MRT line. However, as KA Commuter already has stations with those names, I renamed the ones on the MRT line. (3) I didn't include Transjakarta bus lines or stops, as I think the entire network might have to be reconsidered once MRT and LRT lines are operational.

Any comments are welcome!
 