Are you referring to the news on the previous page? I think there's a bit of misunderstanding here. Rubber tyres will only be used for the Airport's people mover (not LRT).

The LRTs will use a conventional, standard gauge rails powered by third rail.
 

·
:.:::.:.:::.:.:::.:.:::.:
Joined
·
5,509 Posts
Are you referring to the news on the previous page? I think there's a bit of misunderstanding here. Rubber tyres will only be used for the Airport's people mover (not LRT).

The LRTs will use a conventional, standard gauge rails powered by third rail.
Im refering to news "Hyundai Rotem wins Jakarta light metro order
"
 

·
Registered
⭐⭐⭐⭐⭐
Joined
·
3,888 Posts
MRT JAKARTA
North-South Line | location : Jakarta City, Java Island

Excavation for construction entrance west side Istora Station (20/2/2017).





Preparation foundry floor entrance at the eastern side Senayan Station (20/2/2017).



Preparation of casting slab arrivals area in Dukuh Atas Station (20/2/2017).



Preparation of tunnel invert dan first trackbed concrete (20/2/2017).







TBM Mustika Bumi 2 in Stasiun Setiabudi (20/2/2017).



TBM Mustika Bumi 1 in Stasiun Setiabudi (20/2/2017).



TBM Antareja 2 is in the process of arrival (20/2/2017).



Preparation casting permanent staircase access from the platform to the councourse Setiabudi Station (20/2/2017).



Piling soldier pile in Setiabudi area east of the excavation CT / VT and entrance (20/2/2017).



MRT JAKARTA #UBAHJAKARTA https://twitter.com/mrtjakarta


Peta Jaringan Transportasi Terintegrasi Jabodetabek
by Gaz_Art, di Flickr

PDF file: https://goo.gl/752EGz
 

·
Registered
⭐⭐⭐⭐⭐
Joined
·
3,888 Posts
Lanjutan pekerjaan konstruksi special bridge fp3 dan fp1 di area Fatmawati (21/2/2017)





Pekerjaan pengecoran special bridge fp2 di area Fatmawati (21/2/2017)







Pekerjaan pemasangan box girder di area Stasiun Lebak Bulus dan pekerjaan bored pile untuk Jembatan Penyeberangan Orang (JPO) area Depo Lebak Bulus (21/2/2017)





Pekerjaan pemasangan rebar untuk platform slab di Stasiun Istora (20/2/2017)



https://twitter.com/mrtjakarta
 

·
Urban Explorer
Joined
·
2,668 Posts

·
Urban Explorer
Joined
·
2,668 Posts
Jakarta Future Rail Transit-Train Transportation | The Rolling Stock (Exterior & Interior)

Jakarta Skytrain | Woojin



Jakarta LRT | Hyundai Rotem





Jakarta MRT | Sumitomo Corp. and Nippon Sharyo



Jakarta Airport Train | Inka and Bombardier



:cheers1:
 

·
Urban Explorer
Joined
·
2,668 Posts
Jakarta to speed up MRT phase II & III constructions



Phase I : Lebak bulus - Bundaran HI | 15.7 km - U/C

Phase II : Bundaran HI - Kampung Bandan | 8.1 km - Construction in 2019
revised to > Bundaran HI - Ancol Timur | 13.5 km - Construction in 2018

Phase III : Cikarang - Balaraja | 87 km - Construction in 2022
revised to > Cikarang - Balaraja | 87 km - Construction in 2019

Source :

Pemerintah kebut pembangunan MRT
Jokowi tells Ahok to speed up MRT phase II construction and “don’t think about the cost”


:cheers1:
 