Joined
·
1,298 Posts
All from 2/17/21
75 Jordan Ave
62 Vroom St - looks like a renovation
40 Vroom St
36 Vroom St
28 Vroom St
134 Baldwin Ave - complete
190 Academy St - looks just like the rendering
253 Academy St
100 Tuers St
308 Academy St - demolished
900 Bergen Ave - 5 stories planned to be added
34-36 Jones St
44-48 Newkirk St - not sure why, but they did bring an excavator on site. They still need to demolish the houses on Baldwin Ave though
211 Baldwin Ave - complete
39 High St and 51 High St
18 Perrine Ave and 17-23 Perrine Ave - both being prepared for demolition from the looks of it. 17-23 Perrine already pulled permits for demo.
396 Summit Ave
413 Summit Ave
Frank J Gaurini Justice Complex - general contractor mobilized, work started
32 Oakland Ave
345 and 348 Baldwin Ave - neither appear to be active currently
The parking lot between Hoboken Ave and 139 was torn up. Not sure why but it's owned by the county, so probably has something to do with the courthouse
The Central Ave extension is open in one direction
614-616 Summit Ave - not sure why but they hollowed out this building and then left it alone. The site is approved for an 8 story building
28 Cottage St
60 Cottage St and the site of 56-58 Cottage St
75 Jordan Ave


62 Vroom St - looks like a renovation

40 Vroom St

36 Vroom St

28 Vroom St

134 Baldwin Ave - complete

190 Academy St - looks just like the rendering

253 Academy St

100 Tuers St

308 Academy St - demolished

900 Bergen Ave - 5 stories planned to be added

34-36 Jones St

44-48 Newkirk St - not sure why, but they did bring an excavator on site. They still need to demolish the houses on Baldwin Ave though

211 Baldwin Ave - complete

39 High St and 51 High St


18 Perrine Ave and 17-23 Perrine Ave - both being prepared for demolition from the looks of it. 17-23 Perrine already pulled permits for demo.


396 Summit Ave

413 Summit Ave

Frank J Gaurini Justice Complex - general contractor mobilized, work started



32 Oakland Ave


345 and 348 Baldwin Ave - neither appear to be active currently

The parking lot between Hoboken Ave and 139 was torn up. Not sure why but it's owned by the county, so probably has something to do with the courthouse

The Central Ave extension is open in one direction

614-616 Summit Ave - not sure why but they hollowed out this building and then left it alone. The site is approved for an 8 story building

28 Cottage St


60 Cottage St and the site of 56-58 Cottage St