SkyscraperCity banner

5461 - 5480 of 5529 Posts

·
Registered
Joined
·
101,310 Posts
SOME RESIDENTIAL TOWER 2020
  • Ascott Star KLCC (COMPLETED)
  • Kempinski 8 Conlay
  • The Conlay KLCC
  • Isola KLCC
  • Royce Residence KLCC
  • Scarletz Suites KLCC
  • The Face Platinum Suites 2 KLCC T/O
  • Eaton Residence KLCC T/O
  • 10 Stonor KLCC T/O
  • The Manor Residences KLCC T/O
  • TRX Residences
  • Datum Jelatek T/O
  • Agile Bukit Bintang
  • IBN Bukit Bintang
  • Hemmon House
  • Kiara Bay Mon't Kiara
  • Arte Mon't Kiara T/O
  • MET1 KL Metropolis T/O
  • Pavilion Embassy
  • ViiA Residences KL Eco City T/O
  • Lucentia Residences BBCC T/O
  • Setia Sky Seputeh
  • Plaza Rakyat
COMPLETING SOON
  • Eaton Residence KLCC
  • 10 Stonor KLCC
  • The Manor Residences KLCC

Source: WANFLY STUDIO

Source: SCM Southern Corridor Malaysia
 

·
Registered
Joined
·
101,310 Posts
Shopping Mall 2020
  • Pavilion Damansara Heights | Pusat Bandar Damansara
  • Pavilion Bukit Jalil | Bukit Jalil
  • Pavilion Embassy | Jalan Ampang
  • Merdeka Mall | Merdeka 118 - LUXURY MALL
  • The Exchange | Tun Razak Exchange - LUXURY MALL
  • Starhill Renovation | Bukit Bintang - LUXURY MALL
  • BBCC | Jalan Hang Tuah (with Sony Zepp Hall Concert)
  • 8 Conlay Lifestyle Quarters | Jalan Conlay
  • Lot M Podium & Gallery | KLCC
  • The Boulevard | KLCC
  • Star Boulevard Signature Retail F&B | KLCC (COMPLETED)
  • Plaza Rakyat | Jalan Pudu
  • Setia City Mall Expansion | Shah Alam
  • IOI City Mall Expansion | Putrajaya
  • KL Eco City | Pantai
COMPLETING SOON
Bukit Bintang City Centre (BBCC)
  • Japanese LaLaport Mall
  • Sony Zepp Hall Concert




Source: SCM Southern Corridor Malaysia
 

·
Registered
Joined
·
101,310 Posts
BANDAR MALAYSIA
  • The RM140 billion integrated development will feature integrated components covering finance, technology, medical science, education, tourism and entrepreneurship
  • PPP 40:60 between government and private (Ministry of Finance:IWC CREC)
  • To be developed over 20 years
  • There will also be 10,000 affordable homes to benefit low-and-medium income groups.
  • First-phase development of 20.23 ha to kick off in early 2021.
  • Bandar Malaysia Phase 1 development can only be completed and ready to be occupied in the next three to four years.
  • Various rail connected: Line 1,2,6,7,12,13, KTM ETS, KTM Skypark Link, HSR Terminus
  • Easily accessible via Duke 3, KL-Seremban Highway, SMART tunnel, Maju Expressway, East-West Link Expressway and future elevated highways.
  • Duke 3 (Setiawangsa-Pantai Expressway), will provide the infrastructure and pre-cursors for the construction of the underground city for phase 1 of the Bandar Malaysia project.
  • The plan is to turn the underground space into a 24-hour retail and enter- tainment centre that caters to the needs of the working population in Bandar Malaysia.


Affordable homes

Underground City

Setiawangsa-Pantai Expressway (SPE)

SMART Tunnel / KL-Seremban Expressway

Existed railway connected

MRT Putrajaya line underground station


 

·
Registered
Joined
·
101,310 Posts
HOTEL 2020
  • Park Hyatt | Merdeka 118
  • So Sofitel | KLCC
  • Kempinski | Jalan Conlay
  • Jumeirah | KLCC
  • Canopy by Hilton | BBCC (T/O)
  • Capri by Fraser | Bukit Bintang (T/O)
  • The Regent | Jalan Tun Razak
  • Conrad | Jalan Sultan Ismail (T/O)
  • Hyatt Regency by Hyatt | KL Metropolis
  • Somerset by Ascott | KL Metropolis
  • AC Hotels by Marriott | Brickfields
  • Courtyard by Marriott | Old Klang Road
  • Courtyard by Marriott | Shah Alam - Setia City (T/O)
  • Doubletree by Hilton | Shah Alam - iCity (T/O)
  • TRX Lifestyle Quarter Hotel | TRX
  • Jalan Tun Hussien Lee Boutique Hotel | Jalan Tun Hussien Lee
COMPLETING SOON
Conrad Kuala Lumpur

Picture from silverian86

Source: SCM Southern Corridor Malaysia
 

·
Registered
Joined
·
101,310 Posts
OFFICE TOWER PROJECTS 2020
  • Permata Sapura T/O
  • Hap Seng Tower 3 T/O
  • YTL Headquarters T/O
  • PJ Sentral PKNS Tower T/O
  • PJ Sentral Malaysia Building Society Bhd (MBSB) Tower T/O
  • PJ Sentral Menara 6 T/O
  • Menara TCM T/O
  • Majlis Agama Islam Wilayah Persekutuan T/O
  • UOB Headquarters T/O
  • Media City T/O
  • Samurwang Tower Shah Alam T/O
  • Permodalan Nasional Berhad (PNB) Headquarters
  • Tenaga Nasional Berhad (TNB) Headquarters
  • HSBC Headquarters
  • Affin Bank Headquarters
  • Oxley Tower
  • The Stride Office BBCC
  • Aspire Tower KL Eco City
  • TSLAW Tower
HSBC HQ
@ Tun Razak Exchange (TRX)


Source: WanFly Studio
 

·
Registered
Joined
·
101,310 Posts
The Employees' Provident Fund (EPF) HQ - 2021
Kwasa Damansara (Greater KL)

Mitsui Shopping Park Lalaport Kuala Lumpur - 2021
Jalan Imbi

Asia School of Business (American Massachusetts Institute of Technology (MIT) Sloan School of Business) - 2020
Bank Negara KTM Komuter station


PROGRESS
@ Kwasa Damansara MRT station (line 9, 12)


@ Bank Negara Station (line 1, 2), Bandaraya station (line 3, 4)


@ Hang Tuah Station (line 3, 4, 8)

From SCM

Source: WanFly Studio
 

·
Registered
Joined
·
101,310 Posts
COMPLETED 2020
The Asian Institute of Chartered Bankers (AICB)
@ Bank Negara KTM Komuter integrated station
  • Line 1 - Towards KL Sentral, Seremban, MidValley, Bandar Tasik Selatan
  • Line 2 - Towards KL Sentral, KL Eco City, Port Klang, Shah Alam, Klang





 
5461 - 5480 of 5529 Posts
Top