Obligatory 12548 LCW update. Cladding starting to go up on the north and south sides, look closely behind one of the street lights in the second photo.
Also excavation for the townhouses at 35th and 125th is well under way, with some rebar already in place for a concrete pour someday.
No photos, but updates:
Also excavation for the townhouses at 35th and 125th is well under way, with some rebar already in place for a concrete pour someday.
No photos, but updates:
- 12554 LCW project just next to the 12548 LCW site above is continuing through their early design guidance, with Caron being the architecture firm. They are looking at possibly phasing the two buildings, with one year between the buildings.
- Chief Seattle Club has officially broken ground on their Sacred Medicine House development across from the Brown Bear Carwash.
- Still no site activity spotted at 12337 30th Ave NE (Amalfi apartments, next to Dick's) yet, it looks like they still don't have all their permits yet.