Kenha has started construction of lapsset highways by signing A10 highway construction with China communication construction company.

The contract will include the following sections.

1)lamu-ijara-garissa(A10) highway and associated spur roads.length-257km.

2) Hindi-bodhei-basuba-kiunga.length-113km.

3)ijara-sangailu-hulugho.length-83km.

total 453km.
cost ksh17.9 billion.
timelines 36 months
FB_IMG_16188359410033211.jpg
FB_IMG_16188359345724839.jpg
FB_IMG_16188359293987738.jpg
 

·
african_bot
Joined
·
300 Posts
Total distance 453km.
cost ksh17.9 billion.
Have gotten used to seeing crazy figures for very short distances. My eyes are still blinking :)
Same here. About 300M per KM. This is unheard of during this error of tenderprenuous. What changed?
 

·
Lemar44
Joined
·
223 Posts
it is bitumen. newcomer acha kupotosha watu
 

·
Registered
Joined
·
148 Posts
Total distance 453km.
cost ksh17.9 billion.
Have gotten used to seeing crazy figures for very short distances. My eyes are still blinking :)
...they said all weather gravel ...for an important road that will b used to evacuate goods from the new port ....the type of thnkng that our leaders use is really unbelievable .........so very sad .......
 

·
Registered
Joined
·
13,463 Posts
The cost to didn’t look real. Until I read all weather gravel road.

What would be the cost of a concrete road for those 453km?
 

·
Registered
Joined
·
83 Posts
Discussion Starter · #15 · (Edited)
The cost to didn’t look real. Until I read all weather gravel road.

What would be the cost of a concrete road for those 453km?
(A10) lamu-ijara-garissa(257km) will be tarmacked to class A standards to link up with the newly tarmacked nuno-modogashe(135km) road near garissa.people are having a hard time to grasp this.

The rest of spur roads leading eastwards to somalia border will be gravelled to all weather roads.

As for the cost,kenha seems to be cost effective with class A highways in the country side.

For comparison sake,lets look at some of the recent similar trunk roads constructed or are being constructed recently.

Lokichar-nakodok(A1)-338km-ksh 31billion.

Kibwezi-kitui-migwani(A9)-192km-ksh18billion.

Nuno-modogashe (c81)-135km-ksh7billion.

Isebania-kisii-ahero(A1)-172km-ksh18billion.

Kisumu-kakamega-webuye-kitale(A1)-146km-ksh17billion.

Narok-sekenani gate (B7)-82km-ksh2billion.

Mau mau roads (B)-540km-ksh30billion.(way cheaper).

If you do the maths they range at the same price per km.

We mostly document free ways in this forum which are high value due to cities landscape and what not,so when we see reasonable prices for country side highways we tend to under value.

Pricing for some selected cities free ways.

Nairobi express way-27km-ksh62billion.

Nairobi Western bypass-17km-ksh17billion.

Dongo kundu phase one-11km-ksh11billion.

The difference is staggering between cities freeways and country side highways for obvious reasons.

N/B Data sourced from kenha.
 